Valid

GB/T 39420-2020Marine observation terminology (English PDF)

海洋观测术语

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for GB/T 39420-2020 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 19, 2020

Implementation date

June 1, 2021

Scope

GB/T 39420-2020 is the English-translated version of 海洋观测术语.

GB/T 39420-2020 is the Chinese standard "Marine observation terminology". Its scope clause reads: This standard defines the terms involved in marine hydrological observation and marine meteorological observation.

This standard applies to related work and academic exchanges such as marine observation and forecasting, marine disaster prevention and mitigation, marine environmental protection, and marine scientific research. Its clauses include general terms.

Found what you need?

Document preview — GB/T 39420-2020

National Standard of the People's Republic of China

ICS
07.060
Classification
A 45

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 General terms
  • 3 Observation elements
  • 3.1 Marine hydrological elements
  • 3.2 Marine meteorological elements
  • 4 Observation classification
  • 4.1 Observation content
  • 4.2 Observation area and content
  • 4.3 Observation types and methods
  • 5 Observation frequency

1 Scope

This standard defines the terms involved in marine hydrological observation and marine meteorological observation.

This standard applies to related work and academic exchanges such as marine observation and forecasting, marine disaster prevention and mitigation, marine environmental protection, and marine scientific research.

2 General terms

2.1 World time

The standard time at Greenwich's location.

2.2 Beijing time

The standard time in the time zone of Beijing.

2.3 Japan

Delineate the beginning and end of a day for marine hydrology and marine meteorological observation.

Note. The tides, waves, surface sea temperature, surface sea water salinity, and sea ice in marine hydrological projects in the sea areas under the jurisdiction of the People's Republic of China are based on 24.00 Beijing time (Excluding 24 o'clock) is the day boundary, and the sea light uses sunrise as the day boundary; the marine meteorological project uses 20 o'clock (including 20 o'clock) Beijing time as the day boundary. People's Republic of China

Marine hydrological and meteorological observations outside the jurisdiction of the sea are based on the local time zone as the day boundary.

2.4 School time

Calibrate the observation system clock with the standard time.

2.5 Travel time error

Observe the difference between the system clock and the standard time after the observation is completed.

2.6 Observation time

The time determined according to the observation requirements.

2.7 Supplementary test

When an item or element cannot be observed or the observation fails for some reason during the observation time, the measurement is performed within the specified time after the time activity.

2.8 Missing test

No observations or supplementary measurements were made within the specified time.

2.9 Standard observation layer

Seawater observation levels divided according to different observation depth ranges.

Note. Generally can be divided into surface layer, multiple intermediate layers and bottom layer.

2.10 surface layer

The layer of water on the surface of the ocean.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Similar standards

How to Download GB/T 39420-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 39420-2020

$360.00