GB/T 38604.2-2020Public information guidance systems—Assessment requirement—Part 2: Railway passenger station (English PDF)
公共信息导向系统 评价要求 第2部分:铁路旅客车站
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 38604.2-2020 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 31, 2020
Implementation date
October 1, 2020
Scope
GB/T 38604.2-2020 is the English-translated version of 公共信息导向系统 评价要求 第2部分:铁路旅客车站.
GB/T 38604.2-2020 is the Chinese standard "Public information guidance systems—Assessment requirement—Part 2: Railway passenger station".
Its scope clause reads: This part of GB/T 38604 specifies the public information guidance system of railway passenger stations (hereinafter referred to as railway passenger station guidance system) General rules of evaluation requirements, preliminary preparation, evaluation implementation and evaluation conclusions.
This part is applicable to the evaluation of railway passenger station construction, reconstruction, expansion and maintenance of public information guidance system. Its clauses include terms and definitions; general; preparation.
Found what you need?
Document preview — GB/T 38604.2-2020
National Standard of the People's Republic of China
- ICS
- 01.080.01
- Classification
- A 22
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions1
- 4 General1
- 5 Preparation1
- 5.1 Evaluation scope1
- 5.2 Evaluation cycle1
- 5.3 Evaluation Index2
- 5.4 Evaluation plan5
- 6 Evaluation Implementation6
- 7 Evaluation conclusion6
- Appendix A (informative appendix) Field test method7
- Appendix B (informative appendix) Sample questionnaire for railway passenger station guidance system8
1 Scope
This part of GB/T 38604 specifies the public information guidance system of railway passenger stations (hereinafter referred to as railway passenger station guidance system)
General rules of evaluation requirements, preliminary preparation, evaluation implementation and evaluation conclusions.
This part is applicable to the evaluation of railway passenger station construction, reconstruction, expansion and maintenance of public information guidance system.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 15565 Graphical Symbol Terms
GB/T 15566.3 Principles and requirements for the establishment of public information guidance system Part 3.Railway passenger stations
GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide
GB/T 38604.1 Evaluation requirements for public information-oriented systems-Part 1.General
3 Terms and definitions
The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.
4 General
4.1
The evaluation work shall comply with the requirements of GB/T 38604.1.
4.2
The scope of evaluation shall be determined according to the purpose of evaluation. For example, for the overall evaluation of a certain area, the evaluation scope should be all railway travel in the city.
Bus station.
4.3
The evaluation period shall be determined according to the operating conditions of railway passenger stations. For example, for new or rebuilt railway passenger station guidance systems
Evaluation can be carried out 3 months after the official operation.
5 Preparation
5.1 Evaluation scope
The evaluation scope of the railway passenger station guidance system includes individual station evaluation and special evaluation. The evaluation of a single station should be a certain
Specific railway passenger stations; special evaluation can carry out evaluation on specific lines, certain areas or specific time periods.
5.2 Evaluation cycle
The evaluation of a single station should be matched with the progress of new construction, reconstruction, expansion or maintenance of the railway passenger station guidance system. Special evaluation can be based on actual
Need to develop.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 38604.2-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 38604.1-2020 — Public information guidance systems—Assessment requirement—Part 1: General
GB/T 38604.3-2020 — Public information guidance systems—Assessment requirement—Part 3: Urban rail transit station
GB/T 38604.4-2020 — Public information guidance systems—Assessment requirement—Part 4: Trolley and bus station
Secure payment via Stripe
Payments accepted
GB/T 38604.2-2020
$205.00