Scope

GB/T 38604.3-2020 is the English-translated version of 公共信息导向系统 评价要求 第3部分:城市轨道交通车站.

GB/T 38604.3-2020 is the Chinese standard "Public information guidance systems—Assessment requirement—Part 3: Urban rail transit station".

Its scope clause reads: This part of GB/T 38604 clarifies the public information guidance system of urban rail transit stations (hereinafter referred to as rail transit station guidance The principle of systematic) evaluation stipulates the requirements of preliminary preparation, evaluation implementation and evaluation results.

This part is applicable to the evaluation of urban rail transit station construction, reconstruction, expansion and maintenance of public information guidance system. Its clauses include terms and definitions; general; preparation.

Found what you need?

Document preview — GB/T 38604.3-2020

National Standard of the People's Republic of China

ICS
01.080.01
Classification
A 22

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General
  • 5 Preparation
  • 5.1 Evaluation scope
  • 5.2 Evaluation cycle
  • 5.3 Evaluation Index
  • 5.4 Evaluation plan
  • 6 Evaluation Implementation
  • 7 Evaluation conclusion
  • Appendix A (informative appendix) Field test method
  • Appendix B (informative appendix) Sample 8 of questionnaire for rail transit station guidance system

1 Scope

This part of GB/T 38604 clarifies the public information guidance system of urban rail transit stations (hereinafter referred to as rail transit station guidance

The principle of systematic) evaluation stipulates the requirements of preliminary preparation, evaluation implementation and evaluation results.

This part is applicable to the evaluation of urban rail transit station construction, reconstruction, expansion and maintenance of public information guidance system.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article

Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 15565 Graphical Symbol Terms

GB/T 15566.4 Principles and Requirements for Public Information Guidance System Setting Part 4.Public Transport Station

GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide

GB/T 38604.1 Evaluation requirements for public information-oriented systems-Part 1.General

3 Terms and definitions

The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.

4 General

4.1

The evaluation work shall comply with the requirements of GB/T 38604.1.

4.2

The evaluation scope should be determined according to the objectives of the evaluation work. For example, for the overall evaluation of a certain city, the evaluation scope should cover the city

All urban rail transit lines that have been opened.

4.3

The evaluation period should be determined according to the scale of the urban rail transit network, operating years, and evaluation objectives.

Evaluation to the system can be carried out 3 months after the formal operation.

5 Preparation

5.1 Evaluation scope

The evaluation scope of rail transit station guidance system is divided into whole network evaluation and special evaluation. The whole network evaluation should cover the whole operation of a certain city

Time period, full operation line; special evaluation can carry out evaluation on specific line, specific station, specific operation period (such as peak period), etc.

5.2 Evaluation cycle

The evaluation cycle of the whole network evaluation should be no less than once a year, and special evaluation can be carried out according to actual needs.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 38604.3-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 38604.3-2020

$205.00