Valid

GB/T 38435-2019Specification for protection configuration and setting for transmission line of electrified railway traction station (English PDF)

牵引站供电线路的继电保护配置及整定计算原则

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for GB/T 38435-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2019

Implementation date

July 1, 2020

Scope

GB/T 38435-2019 is the English-translated version of 牵引站供电线路的继电保护配置及整定计算原则.

GB/T 38435-2019 is the Chinese standard "Specification for protection configuration and setting for transmission line of electrified railway traction station".

Its scope clause reads: This standard specifies the basic principles, methods and requirements for the configuration and setting calculation of relay protection for the power supply lines of traction stations.

This standard is applicable to the power supply lines of traction stations for newly-built electrified railways of 110kV and above voltage levels Consider three-phase or two-phase power.

110kV and above voltage grade power grid reconstruction, expansion of the traction station power supply line of electrified railway can be consulted Follow the instructions. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 38435-2019

National Standard of the People's Republic of China

ICS
29.240
Classification
K 45

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword I
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General
  • 5 Configuration Principles of Relay Protection for Traction Station Power Lines
  • 6 Setting Principles of Relay Protection for Traction Station Power Lines
  • Appendix A (Informative) Example
  • Appendix B (informative) Typical main wiring of a towing station
  • Appendix C (informative) Typical traction transformer types
  • Appendix D (Informative) Two-phase transmission line parameters
  • Appendix E (informative) Calculation of traction transformer failure

1 Scope

This standard specifies the basic principles, methods and requirements for the configuration and setting calculation of relay protection for the power supply lines of traction stations.

This standard is applicable to the power supply lines of traction stations for newly-built electrified railways of 110kV and above voltage levels

Consider three-phase or two-phase power. 110kV and above voltage grade power grid reconstruction, expansion of the traction station power supply line of electrified railway can be consulted

Follow the instructions.

2 Normative references

The following documents are essential for the application of this document. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 2900.49 Electrician term power system protection

GB/T 14285 Technical regulations for relay protection and safety automatic devices

GB/T 15145 General technical requirements for transmission line protection devices

GB/T 18038 General technical requirements for microcomputer protection devices for traction power supply systems of electrified railways

GB/T 20840.2 Transformers Part 2. Supplementary technical requirements for current transformers

GB/T 31464 Grid Operation Guidelines

GB/T 50262 Standard for Basic Terms of Railway Engineering

DL/T 478 General technical requirements for relay protection and safety automatic devices

DL/T 559 220kV ~ 750kV Power Grid Relay Protection Device Operation Setting Regulations

DL/T 584 3kV ~ 110kV Power Grid Relay Protection Device Operation Setting Regulations

DL/T 866 Current transformer and voltage transformer selection and calculation rules

3 terms and definitions

GB/T 2900.49, GB/T 14285, GB/T 50262 and the following terms and definitions apply to this document.

3.1 Tractionpowersupplysystem

Power supply system composed of traction substation, traction network and other auxiliary power supply facilities.

3.2 Traction substation

Substations that mainly supply traction systems.

3.3 Transmissionlineofelectrifiedrailwaytractionstation

110kV and above transmission lines that lead from the power grid to the traction substation and supply the traction power supply system.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Similar standards

How to Download GB/T 38435-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 38435-2019

$355.00