GB/T 37527-2019Specifications for early-warning message dissemination on mobile phone client (English PDF)
基于手机客户端的预警信息播发规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 37527-2019 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
January 1, 2020
Scope
GB/T 37527-2019 is the English-translated version of 基于手机客户端的预警信息播发规范.
GB/T 37527-2019 is the Chinese standard "Specifications for early-warning message dissemination on mobile phone client". Its scope clause reads: This standard specifies the technical requirements for the functions, performance, and security of the early warning information push platform and mobile client.
This standard applies to the distribution of early warning information based on mobile phone clients. Its clauses include terms and definitions; general; mobile client technical requirements.
Found what you need?
Document preview — GB/T 37527-2019
National Standard of the People's Republic of China
- ICS
- 07.060
- Classification
- A 47
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword III
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General
- 5 Technical requirements for early warning information push platform
- 6 Mobile client technical requirements
- Appendix A (informative) Example of displaying warning information on mobile client
1 Scope
This standard specifies the technical requirements for the functions, performance, and security of the early warning information push platform and mobile client.
This standard applies to the distribution of early warning information based on mobile phone clients.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 34975-2017 Information security technology Mobile smart terminal application software security technical requirements and test evaluation methods
GB/T 35965.1-2018 Emergency Information Interaction Agreement Part 1. Early Warning Information
3 terms and definitions
The following terms and definitions apply to this document.
3.1 Early warning information
Pre-alarm or situation issued by the responsible unit for early warning release based on the degree of hazard, urgency, and development situation
Warning and other information. Generally includes the type of emergency, early warning level, starting time, possible impact scope, warning items, and should be taken
Measures and issuing authorities.
[GB/T 34283-2017, definition 3.1]
3.2 Early-warning release system
Information release system with authorization or qualification for early warning information release.
3.3 Mobilephoneclient
Application software with warning information receiving and processing functions that can be run on a mobile phone terminal.
3.4 Early warning information push platform
A system for obtaining information from an early warning information publishing system and pushing it to a mobile client.
4 General
The dissemination of the warning information based on the mobile client is jointly completed by the warning information push platform and the mobile client. Early warning information push platform
Realize the functions of obtaining, pushing, feedback, querying and canceling early warning information. The mobile client implements the functions of receiving and processing the warning information.
5 Technical requirements for early warning information push platform
5.1 Functional requirements
5.1.1 Early Warning Information Acquisition
The early warning information can be obtained from the early warning information release system and analyzed in accordance with GB/T 35965.1-2018.
5.1.2 Alert Information Push
The alert information can be pushed to the mobile client according to the push settings of the mobile client.
Alert information should be pushed based on the user's location.
5.1.3 Push result feedback
It can feed the warning information push result to the warning information release system. The feedback content includes the total number of pushes to the mobile client, pushes
Key information such as number of successes, total reads, etc.
5.1.4 Early Warning Information Query
It can receive the warning information query request from the mobile client and send the query result to the mobile client.
5.1.5 Withdrawal of early warning information
Can send warning information cancellation instructions to mobile client.
5.2 Performance requirements
5.2.1 Time limit for information push
After getting the warning information, it should be pushed within 10s.
5.2.2 Time limit for information revocation
After getting the cancellation instruction, it should be sent to the mobile client within 10s.
5.3 Safety requirements
It should be ensured that the warning information is complete and not tampered with.
6 Mobile client technical requirements
6.1 Functional requirements
6.1.1 Receiving early warning information
Receive warning information according to user-defined settings (such as impact area, event classification, warning level, release time, etc.).
6.1.2 Early Warning Information Query
Can support precise query according to the location of user attention, event classification, warning level, release time and other conditions, and based on warning information
Fuzzy queries for titles and content text.
6.1.3 Warning information display
Can display the content of early warning information, including the name of the issuing unit, release time, event classification, warning level, warning content, warning
The title and other elements should also be marked with the source of early warning information. See Appendix A for examples of warning messages.
6.1.4 Warning Information Reminder
After receiving the warning information, it can remind the user through sound, vibration, lock screen display and other methods.
You can set the tone according to event classification, release time, warning level, etc.
6.1.5 Early warning information feedback
It can send receipt information such as receiving status and reading status to the warning information push platform.
6.1.6 Warning Information Forwarding
It can forward the early warning information through instant messaging software, SMS and other methods.
6.1.7 Withdrawal of early warning information
The corresponding warning information can be deleted according to the warning information cancellation instruction.
6.1.8 Position acquisition function
Can get mobile phone location information.
6.2 Safety requirements
Should meet the requirements of Chapter 4 of GB/T 34975-2017.
Appendix A (Informative appendix)
Mobile client warning information display example
Figure A.1 shows an example of mobile client warning information display.
Figure A.1 Example of displaying warning information on mobile client references
[1] GB/T 34283-2017 Interface specification of national emergency warning information release system management platform and terminal management platform
[2] Administrative Measures for the Operation of the National Emergency Warning Information Issuing System (Trial) (Secret Letter of the State Council [2015] No. 32)
[3] Law of the People's Republic of China on Emergency Response (Presidential Order of the People's Republic of China No. 69, November 1,.2007)
[4] Legislative Affairs Office of the State Council, China Meteorological Administration. Regulations on Defense of Meteorological Disasters. Beijing. China Legal Publishing House,.2010.
[5] State Council. Overall emergency plan for national public emergencies. Beijing. China Legal Publishing House,.2006.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 37527-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 37527-2019
$105.00