GB/T 37457-2019Spudcan penetration technology of self-elevating drilling unit (English PDF)
自升式钻井平台插桩工艺
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 37457-2019 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 10, 2019
Implementation date
December 1, 2019
Scope
GB/T 37457-2019 is the English-translated version of 自升式钻井平台插桩工艺.
GB/T 37457-2019 is the Chinese standard "Spudcan penetration technology of self-elevating drilling unit". Its scope clause reads: This standard specifies the process preparation, process requirements, process, inspection and precautions for the jacking operation of jack-up rigs.
This standard is applicable to the pile-in operation during the construction of the three-legged, pile-pushing jack-up rig, and other types of jack-up rigs Pile operations can be referred to. Its clauses include terms and definitions; process preparation.
Found what you need?
Document preview — GB/T 37457-2019
National Standard of the People's Republic of China
- ICS
- 47.020.01
- Classification
- U 06
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Terms and definitions
- 2.1 Insert spudcanpenetration
- 2.2 Falling pile legdown
- 2.3 Lift jackup
- 2.4 Pile preload
- 2.5 Air gap
- 3 Process preparation
- 3.1 Drawings and technical documents
1 Scope
This standard specifies the process preparation, process requirements, process, inspection and precautions for the jacking operation of jack-up rigs.
This standard is applicable to the pile-in operation during the construction of the three-legged, pile-pushing jack-up rig, and other types of jack-up rigs
Pile operations can be referred to.
2 Terms and definitions
The following terms and definitions apply to this document.
2.1 Insert spudcanpenetration
When the jack-up rig is in place, the pile legs are inserted into the seabed for foundation pre-operation through the lifting system under the action of the platform's own weight and ballast water.
The process of pressing and placing the legs in a stable position.
Note. The pile-in-place operation generally goes through the stages of descending piles, lifting ships, piles, etc., so that the platform reaches the standing state of the predetermined air gap from the floating state.
2.2 Falling pile legdown
In the floating state, the jack-up drilling platform reduces the pile legs and the pile boots to the process of contacting the pile shoes with the surface of the seabed.
2.3 Lift jackup
The jack-up rig gradually lifts the platform hull to the water surface after the pile legs and pile shoes are inserted into the seabed by lowering the pile.
2.4 Pile preload
After the jack-up drilling platform is lifted to the surface of the water to reach the predetermined air gap, the weight of the ballast water of the platform is gradually increased to a predetermined load, so that the pile legs
The process of reaching a stable position.
2.5 Air gap
The clearance distance between the lower edge of the platform hull and the maximum design peak in the standing state of the jack-up rig.
3 Process preparation
3.1 Drawings and technical documents
Before loading the jack-up rig, the following drawings and technical documents should be prepared.
a) the general layout;
b) the cabin map;
c) draught logo and pile leg logo;
d) positioning of the pile legs (pile boots);
e) lifting system operation manual;
f) locking system operation manual;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 37457-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 37457-2019
$145.00