GB/T 36023-2018Guide for the energy efficiency assessment of the prepainting process (English PDF)
钢带连续彩色涂层工序能效评估导则
Open the GB/T 36023-2018 preview as PDF
This is a limited preview
Buy now to download the full PDF (15 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 15, 2018
Implementation date
December 1, 2018
Scope
GB/T 36023-2018 is the English-translated version of 钢带连续彩色涂层工序能效评估导则.
China's national guide to assessing the energy efficiency of the coil prepainting process. It specifies the terms and definitions, the assessment procedure, the boundary and scope of energy consumption accounting, the baseline and actual energy consumption, and the indicators and analysis. Prepainted steel is coil coated before it is formed: the strip runs continuously through cleaning, chemical pretreatment, prime coat, cure, finish coat and cure, and comes out as a painted product that will be cut and pressed into cladding, appliance panels and roofing. Coating steel this way uses far less energy and paint than spraying the finished article, and produces a more uniform film, but the line's own consumption is dominated by two ovens that must hold a strip travelling at a hundred metres a minute at curing temperature. Almost all the efficiency available is in those ovens and in what is done with their exhaust, since the solvent burned in the incinerator is itself a fuel that can heat the oven that released it.
Document preview — GB/T 36023-2018
National Standard of the People's Republic of China
- ICS
- 77
- Classification
- H04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword...3
- 1 Scope...4
- 2 Normative references...4
- 3 Terms and definitions...4
- 4 Assessment procedures...5
- 5 Boundary and scope of energy consumption statistics...5
- 6 Benchmark energy consumption...5
- 7 Actual energy consumption...8
- 8 Energy efficiency index...10
- 9 Energy efficiency analysis...11
1 Scope
China's national guide to assessing the energy efficiency of the coil prepainting process. It specifies the terms and definitions, the assessment procedure, the boundary and scope of energy consumption accounting, the baseline and actual energy consumption, and the indicators and analysis. Prepainted steel is coil coated before it is formed: the strip runs continuously through cleaning, chemical pretreatment, prime coat, cure, finish coat and cure, and comes out as a painted product that will be cut and pressed into cladding, appliance panels and roofing. Coating steel this way uses far less energy and paint than spraying the finished article, and produces a more uniform film, but the line's own consumption is dominated by two ovens that must hold a strip travelling at a hundred metres a minute at curing temperature. Almost all the efficiency available is in those ovens and in what is done with their exhaust, since the solvent burned in the incinerator is itself a fuel that can heat the oven that released it.
This Standard specifies the terms and definitions, assessment procedures, boundary and scope of energy consumption statistics, benchmark energy consumption, actual energy consumption, energy efficiency index, energy efficiency analysis and energy efficiency optimization measures for the energy efficiency assessment of prepainting process. This Standard is applicable to the energy efficiency assessment and energy- saving potential analysis of prepainting process of an iron and steel enterprise.
2 Normative references
The following documents are essential to the application of this document. For dated references, only the editions with the dates indicated are applicable to this document. For undated references, only the latest editions (including all the amendments) are applicable to this document.
GB 17167 General principle for equipping and managing of the measuring instrument of energy in organization of energy using
GB/T 21368 Specification for equipping and managing of measuring instrument of energy in the iron and steel industry
GB/T 23331 Energy management systems -- Requirements
GB/T 28924 Guides for calculating energy efficiency index of an iron and steel enterprise YB/T 4210 Determination and calculation of heat balance of incinerator & solidification furnace for CCL YB/T 4662 Guides for energy efficiency assessment of an iron and steel enterprise
3 Terms and definitions
The terms and definitions defined by GB/T 23331, GB/T 28924, and YB/T 4662 consumption of gas, natural gas, electricity (the incinerator and the curing furnace are heated separately from the others), circulating water, compressed air, steam, etc.;
d) energy recovery, such as steam recovery, recovered steam pressure, temperature, etc.;
e) ambient temperature.
7.1.2 The field data acquisition shall be carried out in accordance with YB/T 4210.
7.2 Principle for standard coal conversion coefficient of energy and energy-consuming working media
7.2.1 The actual fuel energy consumed by the energy-using unit shall be converted into the amount of standard coal based on its net calorific value. For unmeasured ones, SEE Table B.1.
7.2.2 Steam shall be converted into the amount of standard coal based on its enthalpy value. SEE Table B.2.
7.2.3 The standard coal used for the conversion of energy-consuming working medium is shown in Table B.3.
7.2.4 The conversion relationship between standard coal and heat is 1 kgce = 29 307.6 kJ.
7.2.5 The equivalent value of the electric standard coal conversion coefficient shall be taken, that is, 1 kW·h = 0.122 9 kgce.
7.3 Actual energy consumption calculation The actual energy consumption is calculated according to the Formula (3). Where. ex - Actual energy consumption of the prepainting process during the statistical period, in kilograms of standard coal per ton (kgce/t); ein - Direct energy consumption of the prepainting process during the statistical period, in kilograms of standard coal (kgce); eout - Energy recovered by the prepainting process for external supply during the statistical period, in kilograms of standard coal (kgce); p - Conforming product quantity of the prepainting process during the statistical in accordance with GB/T 15316.
9.3 Analysis of energy efficiency level The analysis of energy efficiency level shall include but shall not be limited to the following.
a) Energy efficiency analysis of prepainting process;
b) The energy consumption analysis of incinerator and curing furnace for prepainting process can be in accordance with GB/T 29727;
10 Energy efficiency optimization measures
The prepainting process can use but is not limited to the following energy efficiency optimization measures.
a) IMPROVE the energy control level;
b) Energy recovery technology of coating waste gas incineration;
c) Energy-saving and environment-friendly combustion technology of the incinerator;
d) Energy-saving insulation material technology of the incinerator and curing furnace;
e) Efficient waste heat recovery technology;
f) Precise temperature control technology of the steel strips;
g) Power-saving technology such as frequency control, permanent magnet speed control, high-efficiency motors, etc.;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 17167General rules for energy measuring instrument equipping and managing of energy user
- GB/T 21368Specification for equipping and managing of measuring instrument of energy in the iron and steel industry
- GB/T 28924Guides for calculating energy efficiency index for iron and steel enterprises
GB/T 23331
How to Buy GB/T 36023-2018
- 1Add to cart. Click the "Buy GB/T 36023-2018" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 17167-2025 — General rules for energy measuring instrument equipping and managing of energy user
GB/T 21368-2008 — Specification for equipping and managing of measuring instrument of energy in the iron and steel industry
GB/T 28924-2023 — Guides for calculating energy efficiency index for iron and steel enterprises
Secure payment via Stripe
Payments accepted
GB/T 36023-2018
$130.00