GB/T 35622-2017Method on determination of emergency planning zone for major accident of toxic gas leakage (English PDF)

重大毒气泄漏事故应急计划区划分方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 35622-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

June 1, 2018

Scope

GB/T 35622-2017 is the English-translated version of 重大毒气泄漏事故应急计划区划分方法.

GB/T 35622-2017 is the Chinese standard "Method on determination of emergency planning zone for major accident of toxic gas leakage".

Its scope clause reads: This standard specifies the principle of determining the scope of emergency planning area, the emergency plan area to determine the actual boundaries and emergency planning and preparation methods.

This standard applies to the number of toxic gases equal to or exceed the critical mass of production facilities, storage facilities, pipeline transport facilities, the use of Facilities and other fixed sources of toxic gases, hazardous chemicals can belong to the category of toxic gases, a major hazard safety supervision process or emergency tube Reason for reference for the relevant agencies.

Its clauses include terms and definitions; determine the scope of emergency planning principles.

Found what you need?

Document preview — GB/T 35622-2017

National Standard of the People's Republic of China

ICS
13.200
Classification
A 90

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 to determine the scope of emergency planning principles
  • 5 Emergency planning area to determine the actual boundaries
  • 6 Emergency Planning and Preparation
  • Appendix A (Informative) Name of main toxic gas and its critical mass
  • Appendix B (Informative) Technical Measures for Determining the Consequences of Gas Leakage Accidents
  • Appendix C (informative) Emergency Planning Division of the basic flow

1 Scope

This standard specifies the principle of determining the scope of emergency planning area, the emergency plan area to determine the actual boundaries and emergency planning and preparation methods.

This standard applies to the number of toxic gases equal to or exceed the critical mass of production facilities, storage facilities, pipeline transport facilities, the use of

Facilities and other fixed sources of toxic gases, hazardous chemicals can belong to the category of toxic gases, a major hazard safety supervision process or emergency tube

Reason for reference for the relevant agencies.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB 12268 dangerous goods list

GB 18218 Hazardous chemicals identification of major hazards

GB 30000.18 Chemical Classification and Labeling Section 18. Acute toxicity

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Emergency planning area

In order to be able to timely and effectively take the protective action of protecting the public in the event of an accident of danger, which is established in advance around the source of danger and formulated

Emergency planning and emergency preparedness area.

3.2 Emergency plan

For the potential accidents and pre-formulated to reduce casualties and property losses for the purpose, including the emergency organization and responsibilities,

Work procedures, coping strategies and measures and other content of the plan.

3.3 Emergency preparedness

The general term for various measures taken in advance to effectively deal with accidents, including awareness, organization, mechanism, plan, team, resources, and training exercises

Various preparations.

4 determine the scope of emergency planning principles

4.1

The most serious toxic gas leak conditions should be considered so that emergency preparedness within the identified contingency area can meet the severity

Degree of potential consequences of different accidents. The main toxic gas name and the critical amount see Appendix A.

4.2

should be used with the type of gas and the actual need to match the technical methods to determine the consequences of gas leaks, and considering the source of leakage,

Topographical conditions, meteorological conditions and other factors. See Appendix B for the technical method of determining the consequences of gas leakage accident.

4.3

Gas leaks should be analyzed The expected exposure of the public through the atmospheric diffusion route to the public may be subject to different time and space conditions […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 35622-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 35622-2017

$145.00