Valid

GB/T 35580-2017Guidelines for water-draw and utilization assessment on construction projects (English PDF)

建设项目水资源论证导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (30 pages)

Need quotation for your management?

Get a formal quotation for GB/T 35580-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

April 1, 2018

Scope

GB/T 35580-2017 is the English-translated version of 建设项目水资源论证导则.

GB/T 35580-2017 is the Chinese standard "Guidelines for water-draw and utilization assessment on construction projects".

Its scope clause reads: This standard specifies the construction project water resources demonstration principles, content, working procedures and technical methods, clear construction projects to take water And backwater and other aspects of the demonstration requirements.

This standard applies to water for the new construction, reconstruction, expansion project construction of water resources demonstration report preparation. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 35580-2017

National Standard of the People's Republic of China

ICS
27.140
Classification
P 56

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General
  • 4.1 Principles of argument
  • 4.2 argument content
  • 4.3 working procedures
  • 4.4 Methodology and Basic Requirements
  • 4.5 Basic Information
  • 4.6 year level
  • 5 water resources demonstration work level and scope
  • 5.1 Basic Requirements
  • 5.2 work level
  • 5.3 Scope of water resources demonstration
  • 6 Construction Project Profile Analysis
  • 6.1 General Provisions
  • 6.2 Construction Project Profile
  • 6.3 Project Water Access Scheme
  • 7 Water Resources and Development and Utilization Analysis
  • 7.1 General provisions
  • 7.2 Water Status
  • 7.3 Water Resources Development and Utilization Analysis
  • 7.4 Water Resources Development and Utilization Potential Analysis
  • 8.1 General Provisions
  • 8.2 water saving technology and technical analysis
  • 8.3 Water Use Process and Water Balance Analysis
  • 8.4 Assessment of Water Use and Analysis of Water Saving Potential
  • 8.5 project water approved
  • 9 water source argument
  • 9.1 General Provisions
  • 9.2 Water Source Alternatives
  • 9.3 Demonstration of surface water intake
  • 9.4 groundwater water source argument
  • 9.5 public water supply water demonstration
  • 9.6 Recycled water intake water demonstration
  • 10.1 General Provisions
  • 10.2 Implications for water resources and hydrological conditions
  • 10.3 Impact on Water Functional Areas
  • 10.4 Impact on aquatic ecology
  • 10.5 Impact on other water users
  • 11 backwater effect argument
  • 11.1 General Provisions
  • 11.2 Impact on Water Functional Areas
  • 11.3 Impact on Aquatic Ecology
  • 11.4 Impact on Other Water Users
  • 11.5 Into the river outfall setting program demonstration
  • 12 Water Conservation, Conservation and Management Measures
  • 12.1 General Provisions
  • 12.2 Saving Measures
  • 12.3 Protection Measures
  • 12.4 Management Measures
  • 13 comprehensive evaluation
  • 13.1 Conclusion
  • 13.2 Recommendation
  • Appendix A (Informative) "Construction Project Water Resources Proof of Outline" Outline
  • Appendix B (Informative) "Construction Project Water Resources Argumentation Report" preparation outline
  • References

1 Scope

This standard specifies the construction project water resources demonstration principles, content, working procedures and technical methods, clear construction projects to take water

And backwater and other aspects of the demonstration requirements.

This standard applies to water for the new construction, reconstruction, expansion project construction of water resources demonstration report preparation.

2 Normative references

The following documents for the application of this standard is essential. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB 3838 Surface Water Environmental Quality Standard

GB/T 7119 water-saving business evaluation guidelines

GB/T 12452 business water balance test rules

GB/T 14848 groundwater quality standards

GB 24789 water units of water measuring instruments and management of general rules

GB/T 25173 water pollution capacity calculation procedures

GB/T 28714 water measurement techniques

GB 50027 water supply hydrogeological survey specification

CJ343 sewage discharged into the town sewer water quality standards

Water conservancy project calculation code

SL278 Hydraulic and Hydropower Engineering Hydrological Computing Code

SL395 Surface Water Quality Evaluation Technical Specification

SL429 water supply and demand forecast analysis technical specifications

SL525 water conservancy and hydropower project water resources demonstration guidelines

SL532 Into the River Outfall Management Technical Guidelines

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Water scheme

Water collection arrangements for construction projects.

Note, including water intake, water intake, water intake location, water intake scale, water intake process, water quality and design assurance rate requirements.

3.2 Water programs waterusescheme

Construction project water arrangements.

Note. Including water consumption per water unit or water system, water technology, equipment and technology, reuse of wastewater, water quality requirements, water saving measures and water use

Guarantee rate and so on.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 35580-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
30 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 35580-2017

$535.00