GB/T 34923.6-2017Street lights control and management system—Part 6: Technical specification of communication protocol (English PDF)
路灯控制管理系统 第6部分:通信协议技术规范
This is a limited preview
Buy now to download the full PDF (62 pages)
Need quotation for your management?
Get a formal quotation for GB/T 34923.6-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 1, 2017
Implementation date
May 1, 2018
Scope
GB/T 34923.6-2017 is the English-translated version of 路灯控制管理系统 第6部分:通信协议技术规范.
GB/T 34923.6-2017 is the Chinese standard "Street lights control and management system—Part 6: Technical specification of communication protocol".
Its scope clause reads: GB/T 34923 provisions of this part of the main station, street lamp control terminal, street lamp controller for data transmission between the frame format, Data coding and transmission rules.
This section applies to the main station and street light control management terminal, street light controller data exchange and street light control terminal and street light control Data exchange between devices. Its clauses include terms, definitions and abbreviations.
Found what you need?
Document preview — GB/T 34923.6-2017
National Standard of the People's Republic of China
- ICS
- 29.140.99
- Classification
- K 73
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations
- 4 master station and management terminal communication protocol
- 5 Street Light Controller Communication Protocol
- Appendix A (Normative) Data Format Description
- Appendix B (Normative) Event Code
- Appendix C (Normative) Data freezing density
- Appendix D (Normative) Error Deprecated Code
- Appendix E (Normative) IP address data format
- Appendix F (Normative) Data Identification Code
- Appendix G (Normative) Day-timetable data format and geographic location information data format
- Appendix H (Normative) Error Message Word, Feature Word, Mode Word, Status Word
1 Scope
GB/T 34923 provisions of this part of the main station, street lamp control terminal, street lamp controller for data transmission between the frame format,
Data coding and transmission rules.
This section applies to the main station and street light control management terminal, street light controller data exchange and street light control terminal and street light control
Data exchange between devices.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2260-2007 Administrative divisions of the People's Republic of China code
GB/T 18657.1-2002 Telecontrol equipment and systems - Part 5. Transmission protocol Part 1. Transmission frame format
GB/T 18657.3-2002 Telecontrol equipment and systems - Part 5. Transmission protocols - Part 3. General structure of application data
GB/T 34923.1-2017 Street lighting control management system - Part 1. General
3 Terms, definitions and abbreviations
3.1 Terms and definitions
GB/T 34923.1-2017 defined and the following terms and definitions apply to this document.
3.1.1 Terminal address
System management terminal address code.
3.1.2 System broadcast address
The address code that all management terminals in the system should respond to.
3.1.3 Terminal group address
Terminal group codes with some same attributes, such as belonging to the same industry, the same circuit loop, the same attribute, respond to the same command.
3.1.4 Master address
Coding of objects (such as workstations, application function modules, etc.) that have communication requirements in the primary station.
3.1.5 Measuring point
It is possible to measure the sequence of electrical connection points between the measuring device and the terminal of a single set of electrical quantities.
NOTE When physically the same electrical connection point is measured by multiple devices or measured by one device but delivered to the terminal in several ways,
Based on multiple measurement points, each measurement point has a unique logical location code, which is the device's parameter configuration at the terminal, the only object to which the data is applied
Logo.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 62 pages — is available in the English PDF.
Similar standards
How to Download GB/T 34923.6-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 34923.5-2017 — Street lights control and management system—Part 5: Technical specification of safety protection
GB/T 34923.4-2017 — Street lights control and management system—Part 4: Technical specification of street lights controller
GB/T 34923.3-2017 — Street lights control and management system—Part 3: Technical specification of street lights control and management terminal
GB/T 34923.6-2017
$1,020.00