GB/T 34229-2017Coalbed methane well test method - Drill stem testing method (English PDF)

煤层气井试井方法 钻杆地层测试法

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34229-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 7, 2017

Implementation date

April 1, 2018

Scope

GB/T 34229-2017 is the English-translated version of 煤层气井试井方法 钻杆地层测试法.

GB/T 34229-2017 is the Chinese standard "Coalbed methane well test method - Drill stem testing method".

Its scope clause reads: This standard specifies the terms and definitions CBM wellbore formation test methods, methods, equipment and instruments, well test design, test procedures Sequence, data recording and collection, test data interpretation, results report.

This standard applies to CBM exploration and development of well test. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 34229-2017

National Standard of the People's Republic of China

ICS
73.040
Classification
D 20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Method Summary
  • 5 equipment and meters
  • 6 well test design
  • 7 test program
  • 8 data recording and collection
  • 9 test data interpretation
  • 10 Outcome Report
  • Appendix A (informative) Drilling process pressure gradient calculation table
  • Appendix B (Normative) Downhole test string records table
  • Appendix C (normative) field test data record table

1 Scope

This standard specifies the terms and definitions CBM wellbore formation test methods, methods, equipment and instruments, well test design, test procedures

Sequence, data recording and collection, test data interpretation, results report.

This standard applies to CBM exploration and development of well test.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 31537 CBM (coal mine gas) terms

3 Terms and definitions

GB/T 31537 defined and the following terms and definitions apply to this document. For ease of use, the following list is repeated

GB/T 31537 some of the terms and definitions.

3.1 Drill pipe formation test drilstemtest

During drilling, drill pipe is used as a conduit for formation fluids to flow to the surface to test formation parameters.

[GB/T 31537-2015, Definition 4.4.4]

3.2 Test the pressure difference between thetestpressuredifference

deltaP

Testing the initial flow pressure differential determines the ease of formation fluid flow.

3.3 Liquid cushion

In order to avoid excessive pressure test, a certain height of fluid (water or drilling fluid) needs to be filled in the test string to balance the pressure drop.

Liquid pre-filled in the column is called a liquid cushion.

3.4 Open well openwel

Open the test valve to allow formation fluids to flow to the wellbore.

3.5 Open well time openweltime

Open the test valve to allow formation fluids to flow to the wellbore for a sustained period of time.

3.6

Shut-in shut-in

Close the test valve to allow formation pressure to recover.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 34229-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34229-2017

$205.00