GB/T 24504-2025Method of injection/falloff well test for coalbed methane well (English PDF)

煤层气井注入/压降试井方法

Open the GB/T 24504-2025 preview as PDF

Preview — first pages of GB/T 24504-2025 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 1, 2025

Implementation date

February 1, 2026

Scope

GB/T 24504-2025 is the English-translated version of 煤层气井注入/压降试井方法.

GB/T 24504-2025 is the Chinese national standard covering injecting water into a coal seam below its fracture pressure and then watching the pressure fall back — the gauges, packer, shut-in tool and pumping system, the design and the parameter calculation, the construction procedure, the field records, and the interpretation that yields permeability, reservoir pressure, skin factor and radius of investigation, together with the in-situ stress read from the same test. It replaces GB/T 24504-2009, under the China National Coal Association. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026, replacing GB/T 24504-2009.

Document preview — GB/T 24504-2025

National Standard of the People's Republic of China

ICS
73.040
Classification
D 20
Replacing
GB/T 24504-2009

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 Method Summary1
  • 5 Instruments and Equipment2
  • 5.1 Pressure gauge2
  • 5.2 Shut-in tools2
  • 5.3 Packer2
  • 5.4 Tool string combination2
  • 5.5 Wellhead Equipment2
  • 5.6 Blowout preventer2
  • 5.7 Pumping system2
  • 6 Well Test Design3
  • 6.1 Basic design data3
  • 6.2 Well Test Type3
  • 6.3 Parameter calculation4
  • 7 Construction Procedure5
  • 7.1 Test Preparation5
  • 7.2 Construction Step5
  • 8 Data Recording and Collection6
  • 8.1 On-site operation records6
  • 8.2 Pressure gauge data acquisition7
  • 9 Well test data interpretation7
  • 9.1 Basic drawing7
  • 9.2 Selection of Basic Parameters for Well Test Interpretation7
  • 9.3 Injection/pressure drop test data analysis8
  • 9.4 Analysis of in-situ stress test data8
  • 10 Well Test Report8
  • Appendix A (Normative) Downhole Test String Data Record Sheet9
  • Appendix B (Normative) Injection/Pressure Drop Test Raw Data Record Table10
  • Appendix C (Normative) In-situ stress test raw data record table11

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document replaces GB/T 24504-2009 "Coalbed Methane Well Injection/Drawdown Test Method". Compared with GB/T 24504-2009, In addition to structural adjustments and editorial changes, the main technical changes are as follows.

a) Added terms and definitions (see Chapter 3);

b) added a summary of methods (see Chapter 4);

c) The requirements for instruments and equipment have been changed (see 5.3, 5.4, and 3.3, 3.4 of the 2009 edition);

d) The requirements for preparation of basic design data have been changed (see 6.1.1, 5.1 of the 2009 edition);

e) Added well test types (see 6.2);

f) The preparation requirements for test wells have been modified (see 7.1.1, 5.2.1 of the 2009 edition);

g) Added the placement position of the sieve tube in the test (see 7.1.3);

h) Added the requirement for replacement of drilling fluid (see 7.2.4).

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed by the China Coal Industry Association.

This document is under the jurisdiction of the National Coal Standardization Technical Committee (SAC/TC42).

This document was drafted by: China Coal Technology and Engineering Xi'an Research Institute (Group) Co., Ltd., Xi'an Coal Science and Technology Testing Technology Co., Ltd., CNOOC Energy Development Co., Ltd.

The main drafters of this document are: Yang Xinhui, Wang Yi, Chen Zhisheng, Li Binggang, Li Xin, Yuan Zhijie, Lin Peiyao, and Ma Litao.

This document was first published in 2009 and this is the first revision.

1 Scope

This document specifies the method summary, instrumentation, well test design, construction procedures, data recording and sampling of coalbed methane well injection/pressure drawdown test.

Well test data collection, interpretation and well test report and other technical contents.

This document applies to well testing conducted during the drilling process or after completion of coalbed methane wells.

2 Normative references

GB/T 17745

GB/T 31537

3 Terms and Definitions

The terms and definitions defined in GB/T 31537 and the following apply to this document.

3.1 Shut down

Close the test valve or device to make the formation pressure system an independent system.

3.2 Shut-in time

The duration of time required to close the test valve or device to allow formation pressure to recover.

3.3 shut-in device

A valve or device used to shut down a well underground or at the wellhead.

3.4 Openwell

Open the test valve or device to connect the formation pressure system with the test pressure system.

4 Method Summary

Working principle of injection/pressure drop test. follow the basic principle of unstable well test, use oil pipe or drill pipe to send the test equipment into the well to make the test more stable.

Water is injected into the well at a fixed displacement and an injection pressure lower than the coal seam fracture pressure, creating a pressure distribution around the wellbore that is higher than the original reservoir pressure.

The well is then shut in, the pressure drops, and the bottom hole pressure gradually approaches equilibrium with the original reservoir pressure. The data of the bottom hole pressure changing with time are recorded throughout the process.

Through comprehensive analysis, the coal reservoir permeability (K), reservoir pressure (Pi), skin coefficient (S), detection radius (Ri), reservoir temperature (R) and other parameters are obtained. (T) etc.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 24504

EditionTitleRevisionStatus
GB/T 24504-2025Method of injection/falloff well test for coalbed methane wellcurrent editionCurrent
GB/T 24504-2009The method of injection/falloff well test for coalbed methane wellprevious editionIn force

This page sells the current edition, GB/T 24504-2025. Earlier editions are listed for reference only.

How to Buy GB/T 24504-2025

  1. 1Add to cart. Click the "Buy GB/T 24504-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 24504-2025

$215.00

$185.00for partners