Valid

GB/T 32898-2016Configuration guide of relay protection for pump-storage generator and transformer unit (English PDF)

抽水蓄能发电电动机变压器组继电保护配置导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (18 pages)

Need quotation for your management?

Get a formal quotation for GB/T 32898-2016 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 29, 2016

Implementation date

March 1, 2017

Scope

GB/T 32898-2016 is the English-translated version of 抽水蓄能发电电动机变压器组继电保护配置导则.

GB/T 32898-2016 is the Chinese standard "Configuration guide of relay protection for pump-storage generator and transformer unit". Its scope clause reads: This standard specifies the basic configuration principle of power generation motor, main transformer and excitation transformer relay of pumped storage power station.

Type, latching logic, associated circuits and equipment requirements.

This standard is applicable to the installation of stand-alone capacity of 150MW and above the reversible pump water turbine generator sets, power generation motor terminal installation Design of Relay Protection for Generator Transformer Group of Pumped Storage Power Station of Circuit Breaker and Commutation Switch.

Stand-alone capacity of 150MW or other main wiring of the pumped storage power station can refer to the implementation. Its clauses include normative reference documents; terms and definitions.

Found what you need?

Document preview — GB/T 32898-2016

National Standard of the People's Republic of China

ICS
29.120.50
Classification
K 45

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 normative reference documents
  • 3 terms and definitions
  • 3.1 Power generation conditions
  • 3.2 Pumping conditions
  • 3.3 Power generation phase modulation conditions
  • 3.4 Pumping phase adjustment conditions pumpcondensermode
  • 3.5 Static variable start
  • 3.6 Back-to-back start

1 Scope

This standard specifies the basic configuration principle of power generation motor, main transformer and excitation transformer relay of pumped storage power station.

Type, latching logic, associated circuits and equipment requirements.

This standard is applicable to the installation of stand-alone capacity of 150MW and above the reversible pump water turbine generator sets, power generation motor terminal installation

Design of Relay Protection for Generator Transformer Group of Pumped Storage Power Station of Circuit Breaker and Commutation Switch.

Stand-alone capacity of 150MW or other main wiring of the pumped storage power station can refer to the implementation.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article

Pieces. For undated references, the latest edition (including all modifications) applies to this document.

GB/T 2900.1 Basic terminology for electrical terminology

Electrician Terminology Relays

Electrotechnical terminology - Power system protection GB/T

3 terms and definitions

The terms and definitions defined in GB/T 2900.1, GB/T 2900.17, GB/T 2900.49 and the following terms and definitions apply to this document.

3.1 Power generation conditions

From the reservoir on the water flow down the reservoir, the drive unit pump turbine wheel rotation, the water potential energy into the energy of the operating state.

3.2 Pumping conditions

Units from the reservoir up the reservoir pumping, the energy into the water potential energy of the operating state.

3.3 Power generation phase modulation conditions

Rotary chamber after the water wheel rotation in the air, the unit power generation and the state of the grid operation.

3.4 Pumping phase adjustment conditions pumpcondensermode

Rotary chamber after the pressure of the wheel in the air rotation, the direction of the unit pumping and running the state.

3.5 Static variable start

The use of static frequency conversion device by starting the circuit drive unit to start the pumping direction of the start mode.

3.6 Back-to-back start

A unit starts with a drag condition and drives the start-up mode of the other unit in the direction of pumping by starting the loop.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 32898-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
18 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32898-2016

$315.00