GB/T 32156-2015Commissioning specification for coal-fired flue gas denitration equipment (English PDF)

燃煤烟气脱硝技术装备调试规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (30 pages)

Need quotation for your management?

Get a formal quotation for GB/T 32156-2015 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 9, 2015

Implementation date

May 1, 2016

Scope

GB/T 32156-2015 is the English-translated version of 燃煤烟气脱硝技术装备调试规范.

GB/T 32156-2015 is the Chinese standard "Commissioning specification for coal-fired flue gas denitration equipment".

Its scope clause reads: This standard specifies the coal-fired flue gas denitrification technology and equipment to start commissioning work duties and content, start commissioning work requirements and quality inspection And Evaluation.

This standard applies to new construction, expansion and renovation of coal-fired boilers selective catalytic reduction (SCR) flue gas denitrification technology and equipment to start the debugger, Quality acceptance and evaluation.

Start debugging and quality inspection and assessment of other flue gas denitrification technology and equipment available for implementation. Its clauses include terms and definitions; general.

Found what you need?

Document preview — GB/T 32156-2015

National Standard of the People's Republic of China

ICS
13.030.40
Classification
J 88

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 1 General
  • 5 start commissioning work duties and the content of
  • 6 start commissioning work requirements
  • 7 mass acceptance and evaluation
  • Appendix A (informative) all stages of trial operation conditions Check Table
  • Annex B (informative) Division after commissioning acceptance visa single
  • Annex C (informative) equipment and systems hosting Visa Book
  • Annex D (informative) coal-fired flue gas denitration project handed over for the transfer of 28 books
  • Annex E (informative) denitrification adjustment commissioning sub-quality inspection and assessment Table

1 Scope

This standard specifies the coal-fired flue gas denitrification technology and equipment to start commissioning work duties and content, start commissioning work requirements and quality inspection

And Evaluation.

This standard applies to new construction, expansion and renovation of coal-fired boilers selective catalytic reduction (SCR) flue gas denitrification technology and equipment to start the debugger,

Quality acceptance and evaluation. Start debugging and quality inspection and assessment of other flue gas denitrification technology and equipment available for implementation.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 21509-2008 coal-fired flue gas denitrification technology and equipment

GB 50150 works of electrical installations electrical equipment handover test standard

3 Terms and Definitions

GB/T 21509-2008 define the following terms and definitions apply to this document.

3.1 Cumulative full load run time

Coal-fired flue gas denitrification technology and equipment in the host group boiler rated conditions of load and above 85% cumulative run time.

3.2 Coal-fired flue gas denitrification technology and equipment package start

Transition from a stopped state to the operating state of the process. Start package is marked by the ammonia injection device starts to spray ammonia, coal-fired flue gas denitration technology installed

Preparation began denitration.

3.3 Automatic investment rate

Ratio of the total automatic system into an automated system designed to copy number and copy number. Each set of automated system should be able to work independently, to form a closed

Minimum system control loop.

3.4 Protection input rate

Ratio of the total has been put into use and copy number of the interlock system designed interlock system copy number, usually expressed as a percentage.

4 General

Debugging and quality inspection and assessment 4.1 from flue gas denitrification technology and equipment shall comply with the provisions of this standard. According to the provisions of the standard organizational changes

Commissioning work, and timely adjustments commissioning quality acceptance and evaluation, to make debugging work quality acceptance and evaluation visas.

4.2

by the debug unit combining the actual situation of coal-fired flue gas denitrification technology and equipment, the preparation undertaken by commissioning lists and adjust the quality of commissioning

Inspection and assessment of the list.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.

Similar standards

How to Download GB/T 32156-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
30 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32156-2015

$535.00