GB/T 31960.4-2015Technical specification for power energy efficiency monitoring system—Part 4: Function design specification of substation (English PDF)
电力能效监测系统技术规范 第4部分:子站功能设计规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 31960.4-2015 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 11, 2015
Implementation date
April 1, 2016
Scope
GB/T 31960.4-2015 is the English-translated version of 电力能效监测系统技术规范 第4部分:子站功能设计规范.
GB/T 31960.4-2015 is the Chinese standard "Technical specification for power energy efficiency monitoring system—Part 4: Function design specification of substation".
Its scope clause reads: GB/T 31960 provisions of this part of the energy efficiency of the electricity sub-station monitoring system functional system architecture, functional requirements, performance and safety Full protection requirements.
This section applies to businesses, parks, energy services and other energy efficiency monitoring system for electricity sub-station construction. Its clauses include terms and definitions; system architecture.
Found what you need?
Document preview — GB/T 31960.4-2015
National Standard of the People's Republic of China
- ICS
- 29.020
- Classification
- K 07
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 1 System Architecture
- 5 companies sub-station
- 6 Park or electrical sub-station service
- 7 Interface Design
- 8 Performance
- 9 Safety requirements
1 Scope
GB/T 31960 provisions of this part of the energy efficiency of the electricity sub-station monitoring system functional system architecture, functional requirements, performance and safety
Full protection requirements.
This section applies to businesses, parks, energy services and other energy efficiency monitoring system for electricity sub-station construction.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2589-2008 comprehensive energy consumption calculation General
GB/T 15316-2009 General principles for monitoring energy efficiency
GB/T 31960.8 electricity monitoring system energy efficiency Technical specifications - Part 8. Security Specification
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Power users comprehensive energy consumption
Total energy consumption of electricity consumers in the comprehensive statistical reporting period, the main production system, auxiliary production system and ancillary production systems.
4 System Architecture
4.1 System Architecture
Power stations Energy Efficiency Monitoring System (hereinafter referred to as "sub-station") specifically includes businesses user stations, park sub-station, power child services
Station. On the one hand, the sub-station and analysis of statistical information from centralized and interactive terminals, and other management information systems to obtain information; the other
Surface, sub-station to provide the necessary information for the parent master, and gain power to assess energy efficiency, energy-saving solutions and advanced services such as recommendations from the upper master.
External logic structure sub-station shown in Figure 1.
1 sub-station external logic diagram […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 31960.4-2015
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 31960.1-2015 — Technical specification of power energy efficiency monitoring system—Part 1: The general rules
GB/T 31960.10-2016 — Technical specification of power energy efficiency monitoring system—Part 10: Test specification of power energy efficiency monitor terminal
GB/T 31960.11-2016 — Technical specification of power energy efficiency monitoring system—Part 11: Test specification of power energy efficiency information collection and exchange terminal
Secure payment via Stripe
Payments accepted
GB/T 31960.4-2015
$145.00