GB/T 31882-2015General installation requirements of S-lay system equipments for ships (English PDF)
S型铺管作业线设备船上安装通用技术要求
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 31882-2015 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 11, 2015
Implementation date
December 1, 2015
Scope
GB/T 31882-2015 is the English-translated version of S型铺管作业线设备船上安装通用技术要求.
GB/T 31882-2015 is the Chinese standard "General installation requirements of S-lay system equipments for ships". Its scope clause reads: This standard specifies the S-lay equipment operating line (referred to pipe-laying equipment) installation conditions, preparation and installation of equipment before installation.
This standard applies to S-type pipe-laying ship line equipment installation. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 31882-2015
National Standard of the People's Republic of China
- ICS
- 47.020.01
- Classification
- U 06
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 3.1 S-lay
- 3.2 Main operating line centerline
- 3.3 Main operating line center plane centralplaneofmainfiringline
1 Scope
This standard specifies the S-lay equipment operating line (referred to pipe-laying equipment) installation conditions, preparation and installation of equipment before installation.
This standard applies to S-type pipe-laying ship line equipment installation.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
CB/T 3958 Ship steel weld magnetic particle testing, penetrant testing and quality classification
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 S-lay
After the pipeline into the water pipe-laying method S-curve in the water.
3.2 Main operating line centerline
Theoretical centerline main operating line pipe installed vertically on the deck in the main operating line to the projector, see Figure 1.
Figure 1 installation reference image
3.3 Main operating line center plane centralplaneofmainfiringline
Through the main operating line centerline plane perpendicular to the deck attached to the device.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 31882-2015
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 31882-2015
$145.00