Valid

GB/T 30555-2014Rules for screw expander (unit) thermal acceptance test (English PDF)

螺杆膨胀机(组)性能验收试验规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (22 pages)

Need quotation for your management?

Get a formal quotation for GB/T 30555-2014 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

May 6, 2014

Implementation date

October 28, 2014

Scope

GB/T 30555-2014 is the English-translated version of 螺杆膨胀机(组)性能验收试验规程.

GB/T 30555-2014 gives the rules for the thermal acceptance test of a screw expander and of a screw expander unit.

Clause 1 states that it specifies the test methods and the calculation program for the thermal performance of back-pressure and condensing steam screw expanders used for low temperature waste heat power generation or for driving, that it covers the test preparation and the uniform rules of implementation and evaluation and contains details of the test conditions, and that it applies to screw expander units running on a two-phase working fluid, whose name the draft garbles, on saturated steam or on superheated steam, and to twin screw expander cycle units running on a non-water working fluid such as a low boiling point fluid; it adds that for complex or special cases not covered the manufacturer and the purchaser should reach an appropriate agreement before signing the contract.

Clause 2 cites GB/T 2624 in all its parts, GB 3102.3, GB/T 8117.1-2008 and GB/T 30554-2014.

The table of contents gives seven clauses: 1 Scope; 2 Normative references; 3 Terms, definitions and symbols, split into 3.1 Terms and definitions, 3.2 Symbols and Definitions and 3.3 on the definition of the guaranteed values; 4, the guideline, which runs from test preplanning, the agreement and arrangement of the preparation phase, the test boundaries and the measurements needed, the test program, the test preparation and the test tuning to the acceptance test, the repeat acceptance test and the test uncertainty; 5 measurement technology and instrumentation, with subclauses on power, flow and pressure measurement, on the exhaust pressure measurement of a condensing screw expander, and on temperature and steam quality measurement; 6 The results of calculation, with the preparation for the calculation and the calculation of results; and 7 on comparing the test results with the guaranteed value and on the amendments, with the guaranteed values and guarantee conditions, the amendments to the steam consumption rate and the output power, the amendment for the thermal fluid, the correction, the fixed variables considered and the comparison with the guaranteed value, followed by a list of references.

Clause 3.1 takes over the terms of GB/T 30554-2014 and adds five of its own: the rated condition, the operating condition at the rated inlet and outlet parameters and speed under the prescribed or contract conditions; the rated power, the power the expander delivers at rated conditions with the regulating valve fully open, which the text also calls the nameplate power; the gross output power, measured at the generator terminal of the screw expansion unit; the auxiliary power consumption, the electricity consumed by all the electrical equipment of the unit; and the net power output, the gross output less the auxiliary power consumption.

The draft breaks off at that last definition, so none of the guideline, measurement or calculation clauses is shown.

It was proposed by China Electrical Equipment Industrial Association and is kept by the National Standardization Technical Committee on screw expanders (SAC/TC512), under ICS 27.040 and Chinese classification K59, with about 26,225 words estimated.

It was issued on 6 May 2014 and has applied since 28 October 2014; the page does not say which edition it replaces.

Found what you need?

Document preview — GB/T 30555-2014

National Standard of the People's Republic of China

ICS
27.040
Classification
K 59

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions and symbols
  • 3.1 Terms and definitions
  • 3.2 Symbols and Definitions
  • 3.3 ensure that the definition of values
  • 4 Guideline
  • 4.2 Test preparation phase of the agreement and arrangement
  • 4.4 Test Program
  • 7
  • 4.5 Test preparation
  • 4.6 Test tuning
  • 4.7 Acceptance Test
  • 4.9 Test Uncertainty
  • 5 measurement technology and instrumentation
  • 5.1 Overview
  • 12
  • 5.2 Power Measurement
  • 5.3 Flow Measurement
  • 5.4 pressure measurement
  • 5.5 Condensing screw expander exhaust pressure measurement
  • 5.6 Temperature measurement
  • 5.7 steam quality measurement
  • 6 The results of calculation
  • 6.1 Calculation ready before
  • 6.2 Calculation of results
  • 7.1 guaranteed and guaranteed working conditions
  • 7.2 steam consumption rate and output power of 20 amendments Generating capacity of 7.3 units of thermal fluid amendment
  • 7.4 Correction
  • 7.5 Fixed variables considered in
  • 7.6 Comparison with the guaranteed value of
  • References

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Electrical Equipment Industrial Association.

The standard screw expander by the National Standardization Technical Committee (SAC/TC512) centralized.

This standard drafting of the main unit. Jiangxi Huadian Power limited liability company.

1 Scope

This standard specifies the test methods for low temperature waste heat power generation or driving (group) and thermal performance with a back-pressure condensing steam screw expander and Calculation program. This standard specifies the test preparation, uniform rules implementation and evaluation, also contains details of the test conditions.

This standard applies to two-phase working fluid as soda, saturated steam or superheated steam screw expander unit, and a non-water as the working fluid (such as a low boiling point Working fluid) twin screw expander cycle unit.

If you have any complex or special cases, the manufacturer and the purchaser not covered by this standard should reach an appropriate agreement before signing the contract.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 2624 (all parts) with a differential pressure measuring device mounted to round pipe full pipe fluid flow (ISO 5167 (all Part).2003)

GB 3102.3 Quantities and units of mechanics

GB/T 8117.1-2008 steam turbine thermal acceptance tests - Part 1: Method A --- Large Condensing Steam Turbine High accuracy test (IEC 60953-1:1990)

GB/T 30554-2014 screw expander term

3 Terms, definitions and symbols

3.1 Terms and Definitions

GB/T 30554-2014 define the following terms and definitions apply to this document.

3.1.1 Rated condition

Under the provisions of (contract) conditions, screw expander at rated inlet and outlet parameters and speed operating conditions.

3.1.2 Rated power

Screw expander running at rated conditions, regulating valve fully open when power issued screw expansion function. This power is also called the nameplate power.

3.1.3 Gross output power

Generator terminal screw expansion unit measured output power.

3.1.4 Auxiliary power consumption

Screw expansion unit for all electrical equipment electric power consumed.

3.1.5 The net power output

By the end of the generator output power measured gross deducted auxiliary power consumption, to obtain the net power output of the unit.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 22 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 30555-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
22 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 30555-2014

$355.00