Scope

GB/T 29549.3-2013 is the English-translated version of 海上石油固定平台模块钻机 第3部分:海上安装、调试与验收.

GB/T 29549.3-2013 is the Chinese standard "Specification for offshore modular drillling rigs on fixed platforms - Part 3: Hook-up,commissioning,and acceptance".

Its scope clause reads: This section GB/T 29549 requirements for lifting offshore fixed platforms offshore oil rig module (hereinafter referred to as module rigs), and Offshore installation connected to the system, system testing and commissioning requirements.

This section applies to offshore drilling rig module installation, commissioning and acceptance. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 29549.3-2013

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E 92

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4.2 job site preparation
  • 4.3 lifting operations
  • 5 offshore equipment installation and system connection
  • 5.2 Technical Requirements
  • 6 3 system debugging
  • 6.1 Basic requirements
  • 6.3 Debugging Content
  • 6.4 Requirements for commissioning
  • 7 Acceptance
  • 10 7.1 Site Acceptance
  • 7.2 Acceptance documents
  • Appendix A (informative) module lifting rig, commissioning work safety risk analysis unit
  • Annex B (informative) module rigs offshore installation content
  • Annex C (informative) Offshore rig module connection order and content
  • Annex D (informative) fixed offshore platform module rig inspection reports
  • Annex E (informative) fixed offshore platform module rigs final acceptance documents and records
  • References

1 Scope

This section GB/T 29549 requirements for lifting offshore fixed platforms offshore oil rig module (hereinafter referred to as module rigs), and

Offshore installation connected to the system, system testing and commissioning requirements.

This section applies to offshore drilling rig module installation, commissioning and acceptance.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB 4914 offshore oil exploration and development of pollutant emission concentration limits

GB/T 8423 oil drilling equipment and specialized vocabulary pipe

GB/T 17744-2008 Petroleum and natural gas industries - Drilling and workover equipment

GB/T 20660 Fire oil and gas industry offshore production facilities, explosion control, reduction measures - Requirements and guidelines

GB/T 23722 crane drivers (operators), slingers qualifications, command staff and assessors requirements

GB/T 29549.1-2013 fixed offshore oil rig Platform Module - Part 1. Design

GB/T 29549.2-2013 fixed offshore oil rig Platform Module - Part 2. Construction

SY/T 5244 drilling fluid circulation manifold

SY/T 5964 drilling well control device assembly supporting installation and maintenance

SY/T 10010 Non-Classified regional level I and Class 1 and Class 2 electrical systems design area of fixed and floating offshore oil facilities and

Recommended practice for installation

SY/T 10025 offshore drilling unit operations before inspection code

Offshore Oil Safety Management Regulations (State Administration of Work Safety Order No. 25 December 1, 2009)

Fixed offshore platform safety regulations (State Economic and Trade Commission in September 2000)

The International Convention for the Safety of Life at Sea (IMO)

3 Terms and Definitions

GB/T 8423, GB/T 29549.1, GB/T 29549.2 defined and the following terms and definitions apply to this document.

3.1 Offshore Lifting hookupandinstalation

Each module rig in accordance with the overall design layout and construction requirements for lifting the order and fixed installation process.

3.2 Lifting beam

Hoisting crane load balancing tool for the construction work.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Similar standards

How to Download GB/T 29549.3-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 29549.3-2013

$375.00