GB/T 29076-2021Execution requirements of quality problem closed loop for aerospace product (English PDF)
Also coversGBT29076-2021
Open the GB/T 29076-2021 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
August 20, 2021
Implementation date
March 1, 2022
Scope
GB/T 29076-2021 (Execution requirements of quality problem closed loop for aerospace product) is available as an English-translated PDF.
GB/T 29076-2021 — This document specifies the general requirements, procedures, technical zeroing work requirements and management zeroing work requirements for aerospace product quality problems. content. This document is applicable to the zeroing of quality problems in various stages of aerospace product design, production, testing, and use.
Document preview — GB/T 29076-2021
National Standard of the People's Republic of China
- Classification
- V 00
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions1
- 4 General requirements3
- 4.1 Principle3
- 4.2 Zero scope of quality problems3
- 4.3 Responsibility4
- 4.4 Management requirements4
- 5 Procedure for resetting quality problems4
- 5.1 Overall Procedure4
- 5.2 Problem report4
- 5.3 Take emergency measures5
- 5.4 Building a team5
- 5.5 Carry out technology zeroing5
- 5.6 Carry out management to zero5
- 5.7 Completing the zero report of quality problems5
- 5.8 Zero review6
- 5.9 Disbanding the team6
- 6 Technical zeroing work requirements6
- 6.1 Problem location6
- 6.2 Mechanism analysis6
- 6.3 Carrying out reproducibility test7
- 6.4 Corrections and corrective actions7
- 6.5 Learn from analogy8
- 7 Management Zeroing Work Requirements8
- 7.1 Process of finding the problem8
- 7.2 Identifying responsibilities8
- 7.3 Take measures8
- 7.4 Dealing with problems9
- 7.5 Improving regulations and standards9
- Appendix A (Normative) Main content of "Quality Problem Zeroing Report"10
- Appendix B (informative) Cover format of "Quality Problem Zeroing Report"13
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
This document replaces GB/T 29076-2012 "Aerospace Product Quality Problem Zeroing Implementation Requirements", compared with GB/T 29076-2012,
In addition to editorial changes, the main technical changes are as follows.
---Changed the description of the scope (see Chapter 1, Chapter 1 of the.2012 edition);
---Added the definition of the terms "root cause" and "root cause analysis" (see 3.16, 3.17);
--- Changed the definition of the term "quality problem to zero" and "repetitive quality problem" (see 3.1, 3.14, 3.1, 3.14 of the.2012 edition);
--- Increased the scope of technology zeroing "causing cost, schedule, efficiency or system application degradation quality problems" (see 4.2);
---Added the general requirements in Chapter 4 about carrying out product-oriented, process-oriented, and organization-oriented analysis, which is difficult to completely return to zero.
Make plans, reviews, key nodes and other requirements (see 4.1.4, 4.1.7, 4.4.1, 4.4.2, 4.4.3);
---Added the quality problem report before and after the formal implementation of the quality problem to zero, emergency treatment, establishment and dissolution of the team, etc.
Procedure (see 5.2, 5.3, 5.4, 5.8, 5.9);
---Added the work requirements for technical zeroing and management zeroing (see Chapter 6 and Chapter 7);
---Added the main content of the technical zeroing report and management zeroing report (see Appendix A).
This document is drafted with reference to ISO 18238.2015 "Management of the Resolution of Closed-loop Problems in Space Systems", and the degree of consistency is non-equivalent.
Introduction
The zeroing of quality problems is a closed-loop management method of quality problems with Chinese aerospace characteristics summarized in the practice of aerospace engineering.
It provides a set of systematic and scientific procedures and methods for completely eliminating quality hidden dangers, solving quality problems and avoiding the recurrence of problems. Quality question
The problem of zeroing has been successfully practiced in aerospace. Through the implementation of quality problem zeroing, the problem can be accurately located, and the origin of the problem can be analyzed in depth.
Causes and mechanisms, effectively identify the weak links of quality management, improve management, optimize processes, and improve product quality and reliability.
It has been eight years since GB/T 29076-2012 was released and implemented. During this period, the zeroing of quality problems has played an increasingly important role in the quality control of aerospace products.
Important role. With the increase in space missions, the rapid increase in the number of collaborative supporting products and suppliers, and the vigorous development of commercial aerospace
The application of quality problem zeroing in the aerospace field continues to deepen, and the connotation of quality problem zeroing continues to expand. At the same time, the International Organization for Standardization
ISO 18238.2015 "Management of closed-loop problem solving in space systems" was released in.2015, and there are certain amendments to GB/T 29076
Reference meaning. In view of this, it is indeed necessary to revise and improve GB/T 29076 to meet the new requirements of aerospace product quality management and promote aerospace products
New experience of zeroing quality problems, unified and standardized implementation procedures and requirements for zeroing quality problems.
Implementation requirements for zeroing the quality problems of aerospace products
1 Scope
This document specifies the general requirements, procedures, technical zeroing work requirements and management zeroing work requirements for aerospace product quality problems.
content.
This document is applicable to the zeroing of quality problems in various stages of aerospace product design, production, testing, and use.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 19000 Quality Management System Foundation and Terminology
3 Terms and definitions
The following terms and definitions defined in GB/T 19000 apply to this document.
3.1
Quality problem zero qualityproblemclosedloop
For quality problems that have occurred, analyze the causes and mechanisms of technology and management, and take corrective and preventive measures to fundamentally
Eliminate problems and avoid recurring activities.
Note 1.The zeroing of quality problems is divided into technical zeroing and management zeroing, sometimes referred to as "double five points" zeroing.
Note 2.Quality problems include malfunctions, defects, accidents and other undesirable situations.
3.2
Technologyclosedloop
In response to the quality problems that occur, technically follow the five requirements of "accurate positioning, clear mechanism, recurring problems, effective measures, and inferences from one another".
Seek to implement item by item, and form the activity of technical zeroing report, related technical documents and certification materials.
3.3
Accurate location
Determine the exact location where the quality problem occurred.
Note. Accurate positioning is to find out which link, which product, which component, which part, which electronic component or which component the problem occurs in, and confirm
Determine the abnormal status and basic reasons of the lowest-level faulty products that occur in the quality problems.
3.4
The mechanism is clear clearlocation
Determine the root cause of quality problems by means of analysis, calculation or experiment.
Note. A clear mechanism is the key to ensure that the quality problem is completely zeroed out, sort out the causal relationship between the problem and the cause, support and prove the correctness of the cause of the problem,
Provide a basis for formulating measures.
3.5
Problemrepetition
Through experiments or other verification methods, the quality problems that have occurred are reproduced, and the accuracy of the positioning and the correctness of the mechanism analysis are confirmed.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Buy GB/T 29076-2021
- 1Add to cart. Click the "Buy GB/T 29076-2021" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 46830.2-2026 — Plastics - Liquid crystal polymer (LCP) moulding and extrusion materials - Part 2: Preparation of test specimens and determination of properties
GB/T 28593-2026 — Sand and dust weather warning levels
GB/T 19608.3-2026 — Classification of special environmental conditions - Part 3: Plateau
Secure payment via Stripe
Payments accepted
GB/T 29076-2021
$245.00