Valid

GB/T 26507-2019Petroleum drilling and production equipment—Ground oil-gas transportation pump (English PDF)

石油天然气钻采设备 地面油气混输泵

Preview PDF

This is a limited preview

Buy now to download the full PDF (19 pages)

Need quotation for your management?

Get a formal quotation for GB/T 26507-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2019

Implementation date

November 1, 2020

Scope

GB/T 26507-2019 is the English-translated version of 石油天然气钻采设备 地面油气混输泵.

GB/T 26507-2019 sets the requirements for the ground oil-gas transportation pump used in oilfields, the twin-screw pump that moves a mixed stream of oil and gas.

It gives the model designation, in which 2LYQB200-1.6 is a twin-screw oil-gas pump of 200 m³/h rated flow and 1.6 MPa rated discharge pressure, then the technical requirements, the test methods, the judgement rules and the completeness, marking, packaging and storage.

Among the requirements are the basic parameters, the range of medium viscosity and gas content, the noise limit, the volumetric and overall efficiency, the flow and shaft power tolerances, the materials for media containing hydrogen sulfide, and bearing and gearbox temperatures no higher than 80 °C. Annexes give the performance parameter calculations and the test record forms.

It replaces GB/T 26507-2011, was issued on 31 December 2019 and has applied since 1 November 2020.

Found what you need?

Document preview — GB/T 26507-2019

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E 92
Replacing
GB/T 26507-2011

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Model indication method
  • 4 Technical requirements
  • 5 Test method
  • 5.1 Test conditions
  • 5.2 Test item
  • 5.3 Test content
  • 5.4 Factory inspection
  • 5.5 Type inspection
  • 6 Judgment Rule
  • 7 Package, marking, packaging and storage
  • 7.1 Complete set
  • 7.2 Logo
  • 7.3 Packaging
  • 7.4 Storage
  • Appendix A (informative) Calculation of performance parameters
  • A.1 Calculation of traffic
  • A.2 Calculation of pressure
  • A.3 Calculation of input power
  • A.4 Pump output power
  • A.5 Efficiency
  • A.6 Gas content delta
  • Appendix B (Informative) Record of continuous operation test of oil and gas mixed pump
  • Appendix C (informative) Ex-factory inspection records for oil and gas mixed pumps
  • Appendix D (Informative) Type Inspection Records of Oil and Gas Mixed Pumps
  • Appendix E (informative) Performance curve of mixed oil and gas pumps
  • Appendix F (Informative) Oil-gas mixed pumping system

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard replaces GB/T 26507-2011 "Ground oil and gas mixed pumps for drilling and production equipment in the oil and gas industry". This standard Compared with GB/T 26507-2011, the main technical changes are as follows.

--- The name of the standard was revised to "Ground Oil-Gas Hybrid Pumps for Oil and Gas Drilling and Production Equipment";

--- Increased model representation (see Chapter 3);

--- Modified the rated discharge pressure range in the basic parameters (see 4.5, 3.2 of the 2011 version);

--- Modified the range of medium viscosity and gas content of the pump under the normal operating environment of the pump (see 4.6, 3.6 of the 2011 version);

--- Revised the regulation of noise value (see 4.9, 3.9 of 2011 version);

--- Revised the regulation of pump volumetric efficiency (see 4.10, 3.10 of the 2011 edition);

--- Revised the regulations on pump efficiency (see 4.11, 3.11 of the 2011 edition);

--- Added rules for pump material selection when pumping corrosive gaseous media containing hydrogen sulfide and other materials (see 4.22);

--- Increased the provisions of the pump flow and shaft power tolerance (see 4.23);

--- Increased the provisions of the viscosity of the oil medium during type testing (see 5.1.1.2);

--- Increased records of gas flow and liquid flow in test values (see Appendix D);

--- Increased the oil and gas mixed pump system diagram (see Appendix F).

1 Scope

This standard specifies the model and technical requirements for the designation of oil and gas mixed-use pumps for the oilfield (twin-screw mixed-use oil and gas pumps, hereinafter referred to as "pumps"). Requirements, test methods, judgment rules, complete sets, marking, packaging and storage.

This standard applies to the design, inspection and use of pumps.

2 Normative references

The following documents are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest version (including all amendments) applies to this document.

GB 3836.1 Explosive atmospheres Part 1: General requirements for equipment

GB/T 13306 signs

GB/T 13384 General technical requirements for packaging of electromechanical products

GB/T 20972.2 Materials used in the hydrogen sulfide environment in oil and gas extraction in the oil and gas industry. Part 2. Anti-cracking carbon steel, Low alloy steel and cast iron

GB/T 29529 Pump noise measurement and evaluation method

GB/T 29531 pump vibration measurement and evaluation method

JB/T 8091 Screw Pump Test Method

3 Model indication

The model representation method is.

Example: 2LYQB200-1.6 represents a twin screw air-fuel mixed-flow pump with a rated flow of 200m³/h and a rated discharge pressure of 1.6MPa.

4 Technical requirements

4.1 The pump shall meet the requirements of this standard and be manufactured in accordance with the product drawings and technical documents approved by the prescribed procedures.

4.2 When the pump is used in an explosive gas environment, the explosion-proof type, category, class and temperature group of the motor and electrical equipment shall comply with GB 3836.1.

4.3 The temperature of bearings and gearboxes should not be higher than 80 °C, and the temperature rise of bearings should not be higher than 45 °C.

4.4 When the pump is running, no liquid or gaseous medium is allowed to leak.

4.5 The basic parameters of the pump shall meet the requirements in Table 1.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 26507

EditionTitleRevisionStatus
GB/T 26507-2019Petroleum drilling and production equipment—Ground oil-gas transportation pumpcurrent editionCurrent
GB/T 26507-2011Petroleum drilling and production equipment—Ground oil-gas transportation pumpprevious editionSuperseded

This page sells the current edition, GB/T 26507-2019. Earlier editions are listed for reference only.

How to Download GB/T 26507-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
19 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 26507-2019

$325.00