GB/T 25382-2010Regulations for operational acceptance test of off-grid wind/solar hybrid generator system (English PDF)
离网型风光互补发电系统 运行验收规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 25382-2010 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 10, 2010
Implementation date
March 1, 2011
Scope
GB/T 25382-2010 is the English-translated version of 离网型风光互补发电系统 运行验收规范.
GB/T 25382-2010 is the Chinese standard "Regulations for operational acceptance test of off-grid wind/solar hybrid generator system".
Its scope clause reads: This standard specifies the storage type DC bus type, system total (mixing) and below 100kW of power off-grid wind and solar power generation system Acceptance procedures, methods and acceptance specifications and other documents.
This standard applies to the off-grid wind turbine and solar photovoltaic modules (array) consisting of energy storage DC bus type, total system (Hybrid) power 100kW and below complementary centralized supply system before running into acceptance. Its clauses include terms and definitions; acceptance program.
Found what you need?
Document preview — GB/T 25382-2010
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 11
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Acceptance Procedure
- 5 Acceptance Test Method
- 6 acceptance documents
1 Scope
This standard specifies the storage type DC bus type, system total (mixing) and below 100kW of power off-grid wind and solar power generation system
Acceptance procedures, methods and acceptance specifications and other documents.
This standard applies to the off-grid wind turbine and solar photovoltaic modules (array) consisting of energy storage DC bus type, total system (Hybrid) power 100kW and below complementary centralized supply system before running into acceptance.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 2297 solar photovoltaic energy systems -
GB/T 2900.53 Electrotechnical terminology Wind turbine generator (GB/T 2900.53-2001, IEC 60050-415.1999, IDT)
GB/T 5465.2 electrical equipment - Graphical symbols - Part 2. Graphical symbols (GB/T 5465.2-2008, IEC 60417
DB.2007, IDT)
GB/T 19064-2003 household solar photovoltaic power system technical requirements and test methods
GB/T 20319-2006 acceptance of wind turbines
GB/T 20321.1 inverter Part 1 Off-grid wind and solar power system. technical conditions
Test Method. GB/T 20321.2 off-grid wind and solar inverter systems - Part 2 Generation
DL/T 499-2001 Technical Specification for the rural low voltage power
JB/T 6939.1 off-grid wind turbine controller with Part 1. Technical conditions
JB/T 6939.2 off-grid wind turbine controller with Part 2. Test methods
YD/T 1058-2007 communication frequency switching power supply system
3 Terms and Definitions
GB/T 2297, the terms and definitions GB/T 2900.53 established in applicable to this standard.
4 Acceptance Program
4.1 General
Acceptance of the system is divided into pre-acceptance stage and the final acceptance stage. The basic function of the pre-acceptance phase main assessment system and various equipment
And control parameter settings, etc; completion and acceptance of the main assessment phase power conversion control system performance, security features, quality of power supply and so on.
4.2 pre-acceptance
4.2.1 Field Test
4.2.1.1
After the installation completed, check the equipment before applying power shall meet the following requirements.
a) site should be cleared;
b) The device installation is completed and confirmed;
c) The correct installation and construction equipment, placed firmly, closely connected;
d) between the wind turbines, photovoltaic arrays, buildings, trees and power lines from the local power grid overhead safety, rational layout, no shadow
Normal response of each device, safe operation and easy operation personnel;
GB/T 25388.1-2021 | GB/T 25387.1-2021 | GB/T 25385-2019 | GB/T 25383-2025 | GB/T 25390-2024 | GB/T 25386.1-2021 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 25382-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 25382-2010
$125.00