Valid

GB/T 25382-2010Regulations for operational acceptance test of off-grid wind/solar hybrid generator system (English PDF)

离网型风光互补发电系统 运行验收规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 25382-2010 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 10, 2010

Implementation date

March 1, 2011

Scope

GB/T 25382-2010 is the English-translated version of 离网型风光互补发电系统 运行验收规范.

GB/T 25382-2010 is the Chinese standard "Regulations for operational acceptance test of off-grid wind/solar hybrid generator system".

Its scope clause reads: This standard specifies the storage type DC bus type, system total (mixing) and below 100kW of power off-grid wind and solar power generation system Acceptance procedures, methods and acceptance specifications and other documents.

This standard applies to the off-grid wind turbine and solar photovoltaic modules (array) consisting of energy storage DC bus type, total system (Hybrid) power 100kW and below complementary centralized supply system before running into acceptance. Its clauses include terms and definitions; acceptance program.

Found what you need?

Document preview — GB/T 25382-2010

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Acceptance Procedure
  • 5 Acceptance Test Method
  • 6 acceptance documents

1 Scope

This standard specifies the storage type DC bus type, system total (mixing) and below 100kW of power off-grid wind and solar power generation system

Acceptance procedures, methods and acceptance specifications and other documents.

This standard applies to the off-grid wind turbine and solar photovoltaic modules (array) consisting of energy storage DC bus type, total system (Hybrid) power 100kW and below complementary centralized supply system before running into acceptance.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent

Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research

Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 2297 solar photovoltaic energy systems -

GB/T 2900.53 Electrotechnical terminology Wind turbine generator (GB/T 2900.53-2001, IEC 60050-415.1999, IDT)

GB/T 5465.2 electrical equipment - Graphical symbols - Part 2. Graphical symbols (GB/T 5465.2-2008, IEC 60417

DB.2007, IDT)

GB/T 19064-2003 household solar photovoltaic power system technical requirements and test methods

GB/T 20319-2006 acceptance of wind turbines

GB/T 20321.1 inverter Part 1 Off-grid wind and solar power system. technical conditions

Test Method. GB/T 20321.2 off-grid wind and solar inverter systems - Part 2 Generation

DL/T 499-2001 Technical Specification for the rural low voltage power

JB/T 6939.1 off-grid wind turbine controller with Part 1. Technical conditions

JB/T 6939.2 off-grid wind turbine controller with Part 2. Test methods

YD/T 1058-2007 communication frequency switching power supply system

3 Terms and Definitions

GB/T 2297, the terms and definitions GB/T 2900.53 established in applicable to this standard.

4 Acceptance Program

4.1 General

Acceptance of the system is divided into pre-acceptance stage and the final acceptance stage. The basic function of the pre-acceptance phase main assessment system and various equipment

And control parameter settings, etc; completion and acceptance of the main assessment phase power conversion control system performance, security features, quality of power supply and so on.

4.2 pre-acceptance

4.2.1 Field Test
4.2.1.1

After the installation completed, check the equipment before applying power shall meet the following requirements.

a) site should be cleared;

b) The device installation is completed and confirmed;

c) The correct installation and construction equipment, placed firmly, closely connected;

d) between the wind turbines, photovoltaic arrays, buildings, trees and power lines from the local power grid overhead safety, rational layout, no shadow

Normal response of each device, safe operation and easy operation personnel;

GB/T 25388.1-2021 | GB/T 25387.1-2021 | GB/T 25385-2019 | GB/T 25383-2025 | GB/T 25390-2024 | GB/T 25386.1-2021 | […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 25382-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 25382-2010

$125.00