GB/T 18759.2-2025Electrical equipment of machines - Open numerical control system - Part 2: System architecture (English PDF)
机械电气设备 开放式数控系统 第2部分:体系结构
Open the GB/T 18759.2-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (11 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 31, 2025
Implementation date
May 1, 2026
Scope
GB/T 18759.2-2025 is the English-translated version of 机械电气设备 开放式数控系统 第2部分:体系结构.
GB/T 18759.2-2025 is the Chinese national standard covering the architecture of an open CNC - the separation of the human interface, the interpolation and the servo layers, the interfaces between them, and the extension points at which a machine builder can add his own function without touching the core. Part 2 of the series. It replaces GB/T 18759.2-2006, in force from 1 May 2026. Issued on 31 October 2025, it has been in force since 1 May 2026, replacing GB/T 18759.2-2006.
Document preview — GB/T 18759.2-2025
National Standard of the People's Republic of China
- ICS
- 29.020
- Classification
- J 07
- Replacing
- GB/T 18759.2-2006
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1.Scope1
- 2 Normative References1
- 3.Terms and Definitions1
- 4.Abbreviations1
- 5 Basic Architecture2
- 6.Functional components and their modules3
- 6.1 General Requirements3
- 6.2 MP Functional Components3
- 6.3 MC Functional Components3
- 6.4 AC Functional Components6
- 6.5 LC Functional Components6
- 6.6 IOC Functional Components6
- 6.7 IODrv Functional Components7
- 6.8 HMI Functional Components7
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. This document is Part 2 of GB/T 18759 "Open CNC Systems for Mechanical and Electrical Equipment". GB/T 18759 has been published. The following section.
1.General Provisions;
3.Bus Interface and Communication Protocol;
4.Hardware Platform;
5.Software Platform;
6.Network Interfaces and Communication Protocols;
7.General Technical Requirements;
8.Testing and Acceptance. This document replaces GB/T 18759.2-2006 "Open CNC Systems for Mechanical and Electrical Equipment - Part
2.System Architecture", and is consistent with... Compared with GB/T 18759.2-2006, apart from structural adjustments and editorial changes, the main technical changes are as follows:
---The basic function area and its basic function component diagrams have been removed (see
3.3 in the.2006 edition);
---The description of "API" in the system platform has been changed to "Open CNC System Application Programming Interface (ONCAPI)," and the following has been added. The components of ONCAPI (see Chapter 5, Chapter 4 of the.2006 edition);
---Added technical details regarding the function descriptions and module names in the "MP Functional Components" section (see Table 1);
1 Scope
GB/T 18759.2-2025 is the Chinese national standard covering the architecture of an open CNC - the separation of the human interface, the interpolation and the servo layers, the interfaces between them, and the extension points at which a machine builder can add his own function without touching the core. Part 2 of the series. It replaces GB/T 18759.2-2006, in force from 1 May 2026. Issued on 31 October 2025, it has been in force since 1 May 2026, replacing GB/T 18759.2-2006.
This document describes the architecture of an open CNC system, specifying the basic functions of each functional component and its corresponding modules. This document applies to open CNC systems used in mechanical and electrical equipment.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document.
GB/T 18759.1-2025 Open-type numerical control systems for mechanical and electrical equipment - Part
3 Terms and Definitions
The terms and definitions defined in GB/T 18759.1-2025, as well as the following terms and definitions, apply to this document.
3.1 functional area To achieve different machining control objectives, the various functions of the ONC CNC device are categorized according to operating logic, application scenarios, and process requirements. Modular areas formed after classification and integration.
Note. The basic functional area of the ONC system includes the Numerical Control (NC) functional area, the Programmable Logic Control (PLC) functional area, and the Human-Machine Interface (HMC) functional area. Energy zone.
3.2 functional component
3.3 functional module It is an independent basic unit used to implement the functions of each component and has a standard data interface.
4.Abbreviations The following abbreviations apply to this document. AC. Axis Control IOC. Input/Output Control IODrv. Input/Output Driver
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
Referenced standards
Editions of GB/T 18759.2
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 18759.2-2025 | Electrical equipment of machines - Open numerical control system - Part 2: System architecture | current edition | Current |
| GB/T 18759.2-2006 | Electrical equipment of machines -- Open numerical control system -- Part 2: System architecture | previous edition | In force |
This page sells the current edition, GB/T 18759.2-2025. Earlier editions are listed for reference only.
How to Buy GB/T 18759.2-2025
- 1Add to cart. Click the "Buy GB/T 18759.2-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 18759.1-2025 — Electrical equipment of machines - Open numerical control system - Part 1:General rules
GB/T 18759.3-2009 — Electrical equipment of machines - Open numerical control system - Part 3: Fieldbus interface and communication protocol
GB/T 18759.4-2014 — Electrical equipment of machines-Open numerical control system-Part 4: Hardware platform
Secure payment via Stripe
Payments accepted
GB/T 18759.2-2025
$305.00