Scope
GB/T 15910-2009 is the English-translated version of 热力输送系统节能监测.
GB/T 15910-2009 is the Chinese national standard on monitoring and testing for energy saving of heat-transmission and distribution system, in the field of energy and heat transfer engineering. The /T suffix marks it as a recommended standard: it is not compulsory by itself, but it becomes binding as soon as a contract, a tender or a customer specification calls it up - which in practice is how most foreign buyers meet it. It was issued on 30 October 2009 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 May 2010. Classification: ICS 27.010, CCS F01. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.
Document preview — GB/T 15910-2009
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F01
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Heat transport system energy monitoring project
- 4.1 Thermal energy monitoring system to check project delivery
- 4.2 Thermal energy monitoring test project delivery system
- 5 Thermal energy monitoring system delivery method
Foreword
This standard replaces GB/T 15910-1995 "Thermal energy monitoring system delivery method." This standard compared with GB/T 15910-1995, the main changes are as follows:
--- Modify the standard name;
--- Increased rate as the major trap steam leakage monitoring project;
--- Refinement of insulation materials and insulation requirements;
--- Increased provision trap steam leakage rate calculation and test methods;
--- Increased the ambient wind speed and ambient temperature requirements;
--- Increased the energy monitoring evaluation of the results;
--- Increased reporting format. Appendix A of this standard is a normative appendix, Appendix B is an informative annex. This standard by the National Standardization Technical Committee for Energy and management proposed. This standard by the National Standardization Technical Committee Sub-Committee on Energy Management and Energy Management. This standard was drafted. NDRC Energy Research Institute, China National Institute of Standardization, China Energy Conservation Supervision Information Network. The main drafters of this standard. Xinding Guo, Chen Hai Hung, Lee Aixian, Hu Xiulian, Xiao-Ping Chen, Zhang BBA students. This standard replaces the standards previously issued as follows:
--- GB/T 15910-1995. Thermal energy monitoring transport system
1 Scope
GB/T 15910-2009 is the Chinese national standard on monitoring and testing for energy saving of heat-transmission and distribution system, in the field of energy and heat transfer engineering. The /T suffix marks it as a recommended standard: it is not compulsory by itself, but it becomes binding as soon as a contract, a tender or a customer specification calls it up - which in practice is how most foreign buyers meet it. It was issued on 30 October 2009 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 May 2010. Classification: ICS 27.010, CCS F01. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.
This standard specifies the monitoring project of heat transmission and energy monitoring systems, monitoring methods and assessment indicators. This standard applies to heating, steam and hot water delivery system thermal units.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 4272 General technical equipment and pipeline insulation
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1 The outer pipe and accessories insulation temperature difference between the surface temperature of the surrounding environment.
4.1 Thermal energy monitoring system to check project delivery
4.1.1 heating network and heating equipment and accessories may not be visible or leaking steam leakage phenomenon.
4.1.2 Thermal insulation pipes and fittings shall meet the following requirements.
a) the outer surface temperature is greater than or equal to the nominal diameter of the pipe section and Dg>=80mm valves, flanges and other accessories 50 °C, in addition to the production process Or no insulation on the outside should not be part of the insulation should be carried out; Choose
b) insulation materials should be consistent with GB/T 4272 regulations;
c) insulation should not have serious damage, loss and other defects;
d) outdoor thermal pipe insulation should be rain, moisture and a protective layer nonflammable;
e) heat pipe laying trench shall be subjected to water immersion.
4.1.3 The main system equipment, piping, etc. should be fixed insulation, flanges, valves, etc. should be removable insulation.
4.1.4 Thermal transfer system should be installed at the generated condensate trap and kept intact; not use phase-out product, nor replaced by valve Trap.
4.2 Thermal energy monitoring test project delivery system
4.2.1 insulation surface temperature, including the determination of the following parameters.
a) an outer surface temperature of the insulation structure;
b) measuring the ambient temperature around the point;
c) measuring points around the wind speed.
4.2.2 trap steam leakage rate.
5 Thermal energy monitoring system delivery method
5.1 Test conditions Tests should be carried out in normal operating conditions the heat transport system.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 10 pages — is available in the English PDF.
Referenced standards
Similar standards
Editions of GB/T 15910
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 15910-2009 | Monitoring and testing for energy saving of heat-transmission and distribution system | current edition | Current |
| GB/T 15910-1995 | Monitoring and testing method for energy saving of heat transmission and distribution system | previous edition | Superseded |
This page sells the current edition, GB/T 15910-2009. Earlier editions are listed for reference only.
How to Buy GB/T 15910-2009
- 1Add to cart. Click the "Buy GB/T 15910-2009" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 4272-2024 — General principles of thermal insulation technique for equipment and pipes
GB/T 42720-2023 — Electronic specialty gas—Hexachlorodisilane
GB/T 42721-2023 — Electronic specialty gas—Nitric oxide
Secure payment via Stripe
Payments accepted
GB/T 15910-2009
$130.00