Valid

GB/T 15772-2008General rule of planning for comprehensive control of soil and water conservation (English PDF)

水土保持综合治理 规划通则

Preview PDF

This is a limited preview

Buy now to download the full PDF (36 pages)

Need quotation for your management?

Get a formal quotation for GB/T 15772-2008 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 14, 2008

Implementation date

February 1, 2009

Scope

GB/T 15772-2008 is the English-translated version of 水土保持综合治理 规划通则.

GB/T 15772-2008 is the Chinese standard "General rule of planning for comprehensive control of soil and water conservation". Its scope clause reads: This standard specifies the basic requirements for the preparation of soil and water conservation planning tasks, content, procedures, methods, outcomes of finishing.

This standard applies to the national soil and water conservation planning, watershed, etc. under the jurisdiction of different administrative areas. Special plan for implementation. Its clauses include general.

Found what you need?

Document preview — GB/T 15772-2008

National Standard of the People's Republic of China

ICS
13.080
Classification
B 11
Replacing
GB/T 15772-1995

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 1 General Provisions
  • 3.2 Content and Program Planning
  • 4 Soil Conservation Comprehensive Survey
  • 4.1 Survey Objective
  • 4.3 survey content
  • 4.4 The survey asked
  • 4.5 Investigation Outcome
  • 5 Water Conservation Zone
  • 5.1 Partition Task
  • 5.2 Principles of Regional Division
  • 5.3 3 partition main content
  • 5.4 partitioning method steps
  • 5.5 zoning classification requirements
  • 5.6 partition naming
  • 5.7 Partition result
  • 6 5 Land Use Assessment
  • 6.1 Evaluation Objective
  • 6.2 Evaluation Principles
  • 6.3 Evaluation methods and procedures
  • 6.4 Evaluation of the results of
  • 7 Soil and Water Conservation Measures Plan
  • 7.4 Planning of control measures
  • 8 Technical and Economic Indices
  • 8.1 8 input indicators calculated
  • 8.2 Calculation Progress Indicator
  • 8.3 Calculation efficiency indicators
  • 9 Finishing planning results
  • 9.1 Planning Report
  • 9.2 Schedule
  • 9.3 Figure
  • 9.4 Annex
  • Annex B (informative) Land Use evaluation method step
  • Annex C (informative) Calculation input and schedule requirements
  • Annex D (informative) Form 31 Schedule planning major
  • Annex E (informative) Soil and Water Conservation Professional legend

1 Scope

This standard specifies the basic requirements for the preparation of soil and water conservation planning tasks, content, procedures, methods, outcomes of finishing.

This standard applies to the national soil and water conservation planning, watershed, etc. under the jurisdiction of different administrative areas. Special plan for implementation.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent

Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research

Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 15774-2008 Soil and Water Conservation Benefit Calculation Methods

21010 Status of Land Use GB/T category

3 General

Task 3.1 Planning

3.1.1

draw up plans should implement the "prevention first, overall planning, comprehensive prevention and control, according to local conditions, strengthening management, focusing on efficiency," the party and Water Conservation needle. The General Plan of governance based.

3.1.2

should be based on a comprehensive investigation, according to the local rural economic development, rationalizing land use and rural industrial structure,

For the characteristics of soil erosion, the configuration of the local conditions and water conservation measures, technical requirements of the measures.

3.1.3

should analyze the measures required labor, material and financial resources in the planning period (small areas 3a ~ 5a, a large area 5a ~ 10a) arranged

The progress of governance, forecasting benefits after the implementation of the plan, put forward measures to ensure the implementation of the plan.

3.2 Content and Program Planning

3.2.1

comprehensive survey from the following aspects.

3.2.1.1

Investigation of the basic situation in the planning area, including natural conditions, natural resources, socio-economic situation, especially soil erosion

Point and so on.

3.2.1.2

Soil and Water Conservation survey summarizes achievements and experience. Including soil and water conservation process, governance status quo (the regulation measures

Quantity, quality, and efficiency), soil and water conservation (technical measures experience and organizational leadership experience), the problems and improvements and the like.

3.2.2

Water Conservation zoning should be based on the natural conditions in different regions, socio-economic situation and the characteristics of soil erosion in the planning, division if

Dry different types of areas, according to the different types of zones are proposed different land-use planning and control measures layout.

3.2.3

Evaluation should be based on land use planning within the current land use and land resources evaluation, consideration of population and the development of agricultural production

The number of levels, the need to develop commodity economy and improve people's lives, the researchers evaluated each rural sector (agriculture, forestry, animal husbandry, and fisheries) and other land uses of

The amount and location as the basis for the deployment of the soil and water conservation measures.

3.2.4

Prevention planning should be based on different land use and soil erosion different characteristics, different control measures were taken.

3.2.4.1

of woodland, grassland and other minor soil erosion but potentially dangerous loss (slope at 15 ° above) the place should be taken "to prevent

Master "protective measures.

3.2.4.2

above for mild soil erosion farmland, wasteland, ravines and sand areas, should be taken separately corresponding control measures, control of water

Soil erosion, and the use of land and water resources development of the rural economy.

3.2.4.3

Planning should include the following.

a) propose different regions different types of preventive measures.

b) in each type of area at least the preliminary design or implementation of a typical small watershed effect.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 36 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 15772

EditionTitleRevisionStatus
GB/T 15772-2008General rule of planning for comprehensive control of soil and water conservationcurrent editionCurrent
GB/T 15772-1995General rule of planning for comprehensive control of soil and water conservationprevious editionSuperseded

This page sells the current edition, GB/T 15772-2008. Earlier editions are listed for reference only.

How to Download GB/T 15772-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
36 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 15772-2008

$560.00