GB/T 15544.5-2017Short-circuit current calculation in three-phase a.c. systems -- Part 5: Examples (English PDF)

三相交流系统短路电流计算 第5部分:算例

Preview PDF

This is a limited preview

Buy now to download the full PDF (42 pages)

Need quotation for your management?

Get a formal quotation for GB/T 15544.5-2017 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

July 1, 2018

Scope

GB/T 15544.5-2017 is the English-translated version of 三相交流系统短路电流计算 第5部分:算例.

GB/T 15544.5-2017 — This section GB/T 15544 is given in accordance with GB/T 15544.1 50Hz or 60Hz three-phase AC system short-circuit current meter Counting examples.

This part includes the modeling of electrical equipment in positive sequence, negative sequence and zero sequence systems (Chapter 2), and low voltage systems (Chapter 3) with Induction motor medium voltage systems (Chapter 4) and power plant systems (auxiliary systems connected to a large number of MV and LV induction motors) (Chapter 5) Examples.

The three examples given in Chapter 3, Chapter 4 and Chapter 5 are similar to the ones given in IEC 60909 (1988), but according to GB/T 15544.1-2013 was modified.

The third chapter added 3.6, the equivalent voltage source method and the superposition of the calculation results Compared. Chapter 6 provides the wiring diagram and calculation of the test system, as well as short-circuit current calculations based on GB/T 15544.1.

The example includes four different voltage levels of 380kV, 110kV, 30kV and 10kV, including power plant equipment, generator, asynchronous motor the calculation results include I "k, ip, Ib, Ik, I" k1 and ip1. This example can be used to test short circuit current computer programs.

Found what you need?

Document preview — GB/T 15544.5-2017

National Standard of the People's Republic of China

ICS
29.240.20
Classification
F 20

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Contents

  • Foreword
  • 1 Overview
  • 1.1 Scope and purpose
  • 1.2 Normative references
  • 1.3 Definitions, symbols, coefficients and formulas
  • 2 Positive sequence of electrical equipment, negative sequence and zero sequence impedance
  • 2.1 Overhead lines, cables and short-circuit limit reactor
  • 2.2 Transformer
  • 2.3 Generator and Generator Set
  • 3 Un = 400V low voltage system in the short circuit current calculation
  • 3.1 Question
  • 3.2 Determination of positive sequence impedance
  • 3.2.1 Network Feeder
  • 3.2.2 Transformer
  • 3.2.3 Lines (cables and overhead lines)
  • 3.3 Zero-sequence impedance determination
  • 3.3.1 Transformer
  • 3.3.2 Lines (cables and overhead lines)
  • 3.4 Three-phase short-circuit current I "k and ip calculation
  • 3.4.1 Short circuit position F1
  • 3.4.2 Short-circuit position F2
  • 3.4.3 Short circuit position F3
  • 3.5 Single-phase short-circuit point flow I "k1 and ip1 calculated
  • 3.5.1 Short circuit position F1
  • 3.5.2 Short-circuit position F2
  • 3.5.3 Short-circuit position F3
  • 3.6 Summary of Results
  • 4 Medium voltage system in the calculation of three-phase short-circuit current - the impact of the motor
  • 4.1 Question
  • 4.2 Complex calculation with absolute value
  • 4.3 Calculation of short-circuit reactance of electrical equipment
  • 4.4 Calculation based on per unit value
  • 4.5 Using the superposition method of calculation
  • 5 Generator transformer and auxiliary network three-phase short-circuit current calculation
  • 5.1 Question
  • 5.2 Electrical equipment short-circuit impedance
  • 5.2.1 Network Feeder
  • 5.2.2 Hair change group
  • 5.2.3 Auxiliary Transformer
  • 5.2.4 2.5MVA and 1.6MVA low voltage transformer
  • 5.2.5 Induction motor
  • 5.3 Calculation of short circuit current
  • 5.3.1 Short circuit position F1
  • 5.3.2 Short-circuit position F2
  • 5.3.3 Short circuit position F3
  • 5.3.4 Short-circuit position F4
  • 5.3.5 Short-circuit position F5
  • 6 Refer to GB/T 15544.1 Test Network for Short Circuit Current Calculation Using Digital Program
  • 6.1 Overview
  • 6.2 380kV/110kV/30kV/10kV high voltage test network
  • 6.2.1 Network Topology and Data
  • 6.2.2 Electrical equipment short-circuit impedance
  • 6.3 Results
  • 6.3.1 Three-phase short circuit current
  • 6.3.2 Line to ground short circuit current

Foreword

GB/T 15544 "three-phase AC system short-circuit current calculation" is divided into five parts.

--- Part 1. Current calculation;

--- Part 2. Short-circuit current calculation of the application of the coefficient;

--- Part 3. Electrical equipment data;

--- Part 4. Simultaneous two separate single-phase ground fault current and the current flow through the earth;

--- Part 5. Example.

This section GB/T 15544 Part 5.

This section drafted in accordance with GB/T 1.1-2009 given rules.

This section uses the translation method is equivalent to using IEC/T R60909-4..2000 "Three-phase AC system short-circuit current Part 4. Short-circuit current Calculation case ".

This section made the following editorial changes.

--- In line with the existing standard series, the name of this section read "three-phase AC system short-circuit current calculation Part 5. Example." Our national document, which has a consistent correspondence with the normative references in this section, is as follows.

--- GB/T 156-2007 standard voltage (IEC 60038.:2002, MOD)

--- GB/T 15544.2-2017 Three-phase AC system short-circuit current calculation Part 2. Short-circuit current calculation and application of the coefficient (IEC TR60909-1.:2002, IDT)

--- GB/T 15544.3-2017 Three-phase AC system short-circuit current calculation Part 3. Electrical Equipment Data (IEC TR60909-2.:2008, IDT)

--- GB/T 15544.4-2017 three-phase AC system short-circuit current calculation - Part 4. Simultaneous two independent single-phase ground Short-circuit current at short circuit fault and current through the earth (IEC 60909-3.:2009, IDT)

--- GB/T 35698.1-2017 short-circuit current effects calculation - Part 1. Definition and calculation method (IEC 60865-1.:2011, IDT) this part is proposed by China Electricity Council.

This part of the national standardization of short-circuit current calculation Technical Committee (SAC/TC424) centralized.

This section drafted by. China Electric Power Research Institute, State Grid Corporation of China State Power Dispatching Control Center, Xi'an Jiaotong University.

1 Overview

1.1 Scope and purpose

This section GB/T 15544 is given in accordance with GB/T 15544.1 50Hz or 60Hz three-phase AC system short-circuit current meter Counting examples.

This part includes the modeling of electrical equipment in positive sequence, negative sequence and zero sequence systems (Chapter 2), and low voltage systems (Chapter 3) with Induction motor medium voltage systems (Chapter 4) and power plant systems (auxiliary systems connected to a large number of MV and LV induction motors) (Chapter 5) Examples.

The three examples given in Chapter 3, Chapter 4 and Chapter 5 are similar to the ones given in IEC 60909 (1988), but according to GB/T 15544.1-2013 was modified. The third chapter added 3.6, the equivalent voltage source method and the superposition of the calculation results Compared.

Chapter 6 provides the wiring diagram and calculation of the test system, as well as short-circuit current calculations based on GB/T 15544.1.

The example includes four different voltage levels of 380kV, 110kV, 30kV and 10kV, including power plant equipment, generator, asynchronous motor the calculation results include I "k, ip, Ib, Ik, I" k1 and ip1. This example can be used to test short circuit current computer programs.

1.2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 15544.1-2013 Three-phase AC system short-circuit current calculation - Part 1. Current calculation (IEC 60909-0.:2001, IDT) IEC 60038. 1983 IEC standard voltage (IEC Standardvoltages) IEC 60909-1.:1991 Short-circuit currents in three-phase AC systems - Part 1. Calculation of three-phase AC systems according to IEC 60909 Short-circuit current calculusinthree-phasea.c.systems-Part 1. Factorsfor thecalculationofshort-circuitcurrentsinthree-phasea.c.systemsaccordingtoIEC 60909) IEC 60909-2.:1992 Electric equipment required to perform short-circuit current calculations in accordance with IEC 60909 (Electricalequip-ment-Dataforshort-circuitcurrentcalculationsinaccordancewithIEC 60909) IEC 60909-3.:1995 Three-phase AC system short-circuit current calculation - Part 3. Simultaneous two independent single-phase ground fault of the current and the current through the earth (Short-circuitcurrentscalculationinthree-phasea.c.system-Part 3.

Currentsduringtwoseparatesimultaneoussinglephaseline-to-earthshortcircuitsandpartialshort-circuitcurrentsflowingthroughearth) IEC 60865-1.:1993 Short-circuit current effects calculation - Part 1. Definition and calculation method (Short-circuitcurrents-Calculation of effects - Part 1. Definitions andcalculation methods)

1.3 Definitions, symbols, coefficients and formulas

Definitions, symbols, coefficients and formulas are the same as in GB/T 15544.1.

2 Positive sequence of electrical equipment, negative sequence and zero sequence impedance

This chapter in Chapter 3 of GB/T 15544.1-2013 gives the electrical equipment of positive sequence, negative sequence and zero sequence impedance modeling and

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 42 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 15544.5-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
42 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 15544.5-2017

$645.00