GB/Z 109-2025Guidance for nuclear power plant electrical power systems analysis (English PDF)

核电厂电气系统分析指南

Preview PDF

This is a limited preview

Buy now to download the full PDF (41 pages)

Need quotation for your management?

Get a formal quotation for GB/Z 109-2025 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 3, 2025

Implementation date

December 3, 2025

Scope

GB/Z 109-2025 is the English-translated version of 核电厂电气系统分析指南.

GB/Z 109-2025 is the Chinese standard "Guidance for nuclear power plant electrical power systems analysis". Its scope clause reads: This document provides guidelines for analyzing AC and DC electrical systems in nuclear power plants.

Electrical system analysis is used to demonstrate the capabilities of the power supply and distribution systems. Sufficient to support the safe operation and shutdown of nuclear power plants, and to enable nuclear power plants to enter a controllable state and ultimately recover after a anticipated operational event or accident.

A safe state has been reached. This document applies to. ---Verify the design of a new nuclear power plant; ---Demonstrate the adequacy and impact of major modifications to the electrical systems of operating nuclear power plants; ---Assess and determine the operating limits and constraints for nuclear power plants in operation.

The relevant provisions of this document also apply to nuclear power plants in the decommissioning phase.

This document is not applicable to. ---Digital controllers used in electrical systems (such as controllers for rectifiers, inverters, sequencers, and electrical protection devices) (piece); ---Environmental conditions (such as temperature and humidity) and external events (such as earthquakes, floods, fires) that may affect equipment selection or protection requirements.

High-energy electromagnetic pulses, etc., but include external events such as lightning and geomagnetic storms; ---Additional or special features to independent power systems, such as power supplies used as security measures in nuclear power plants; ---The content on improving the reliability of electrical systems in nuclear power plants by adopting statistical or diversity and redundancy schemes; ---Personnel safety protection measures during the installation, maintenance and operation of electrical systems, as well as routine personal safety content.

The methods or tools used in the analysis include. ---Verified and validated simulation tools (software and hardware); ---Calculated manually; ---test.

Found what you need?

Document preview — GB/Z 109-2025

National Standard of the People's Republic of China

ICS
27.120.20
Classification
F 69

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1.Scope
  • 2 Normative References
  • 3.Terms and Definitions
  • 4.Electrical System Analysis
  • 4.1 Overview of Typical Studies
  • 4.2 Applicability of the analysis to different operating conditions of nuclear power plants
  • 4.3 Selection, Validation, and Adoption of Analytical Tools
  • 4.4 Electrical System Model
  • 4.5 Connection between nuclear power plants and the power grid
  • 4.6 Analysis Update
  • 4.7 Prerequisites for Conducting Electrical Research
  • 4.8 Acceptance
  • 4.9 Other
  • 5.1 General Principles
  • 5.2 Analysis Content
  • 5.3 Acceptance
  • 6.1 Overview
  • 6.2 Trend Research
  • 6.3 Transient Study
  • 6.4 Fault Study
  • 6.5 Research on Electrical Protection Coordination
  • 7.Analysis of DC and AC Uninterruptible Power Supply Systems
  • 7.1 Trend Research
  • 7.2 Transient Study
  • 7.3 Fault Study
  • 7.4 Study on Electrical Protection Coordination
  • 8 Other analyses
  • 8.1 Lightning Protection Research
  • 8.2 Electromagnetic Compatibility Research
  • 8.3 Harmonic Research
  • 8.4 Study on Geomagnetic Induced Current
  • 8.5 Research on Ferromagnetic Resonance
  • Appendix A (Informative) Determination of Design Basis for Electrical Systems in Nuclear Power Plants
  • Appendix B (Informative) Guidelines for Analytical Research
  • Appendix C (Informative) Design Basis and Equipment Parameter Verification
  • Appendix D (Informative) Example 38 of Acceptance Criteria for Specific Nuclear Power Plants
  • Appendix E (Informative) Example of Typical Structure for Electrical System Analysis Path and Report
  • References

1 Scope

This document provides guidelines for analyzing AC and DC electrical systems in nuclear power plants. Electrical system analysis is used to demonstrate the capabilities of the power supply and distribution systems.

Sufficient to support the safe operation and shutdown of nuclear power plants, and to enable nuclear power plants to enter a controllable state and ultimately recover after a anticipated operational event or accident.

A safe state has been reached.

This document applies to.

---Verify the design of a new nuclear power plant;

---Demonstrate the adequacy and impact of major modifications to the electrical systems of operating nuclear power plants;

---Assess and determine the operating limits and constraints for nuclear power plants in operation.

The relevant provisions of this document also apply to nuclear power plants in the decommissioning phase.

This document is not applicable to.

---Digital controllers used in electrical systems (such as controllers for rectifiers, inverters, sequencers, and electrical protection devices) (piece);

---Environmental conditions (such as temperature and humidity) and external events (such as earthquakes, floods, fires) that may affect equipment selection or protection requirements.

High-energy electromagnetic pulses, etc., but include external events such as lightning and geomagnetic storms;

---Additional or special features to independent power systems, such as power supplies used as security measures in nuclear power plants;

---The content on improving the reliability of electrical systems in nuclear power plants by adopting statistical or diversity and redundancy schemes;

---Personnel safety protection measures during the installation, maintenance and operation of electrical systems, as well as routine personal safety content.

The methods or tools used in the analysis include.

---Verified and validated simulation tools (software and hardware);

---Calculated manually;

---test.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB/T 15544 (all parts) Short-circuit current calculation for three-phase AC systems [IEC 60909 (all parts)]

Note. GB/T 15544.1-2023 Short-circuit current calculation for three-phase AC systems - Part 1.Current calculation (IEC 60909-0.2016, MOD);

GB/T 15544.2-2017 Calculation of short-circuit current in three-phase AC systems - Part 2.Coefficients applied in the calculation of short-circuit current (IEC TR60909-1.

2002, IDT);

GB/T 15544.3-2017 Short-circuit current calculation for three-phase AC systems – Part 3.Data for electrical equipment (IEC TR60909-2.2008, IDT);

GB/T 15544.4-2017 Short-circuit current calculation for three-phase AC systems - Part 4.Current when two independent single-phase ground faults occur simultaneously.

and the current flowing through the ground (IEC 60909-3.2009, IDT);

GB/T 15544.5-2017 Calculation of short-circuit current in three-phase AC systems - Part 5.Examples (IEC /T R60909-4.2000, IDT).

GB 50057 Code for Design of Lightning Protection of Buildings […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 41 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/Z 109-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
41 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/Z 109-2025

$560.00