GB/T 15317-2009Monitoring and testing for energy saving of coal fired industrial boilers (English PDF)

燃煤工业锅炉节能监测

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 15317-2009 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 30, 2009

Implementation date

May 1, 2010

Scope

GB/T 15317-2009 is the English-translated version of 燃煤工业锅炉节能监测.

GB/T 15317-2009 sets out how the energy use of coal fired industrial boilers is monitored and tested.

Clause 1 states that it specifies the energy monitoring items, the monitoring methods and the assessment indicators, and it limits the application to industrial steam boilers whose rated thermal power or rated evaporation is greater than 0.7 MW (1 t/h) and not greater than 24.5 MW (35 t/h) and to industrial hot water boilers rated above 2.5 GJ/h.

Clause 2 cites GB/T 1576, GB/T 10180 and GB/T 17954.

Clause 3, industrial boiler energy monitoring project, is split between the inspection items of 3.1, which cover whether the boiler appears in the national phase-out catalogue, the training and employment certificates held by the main boiler operator, the recording and analysis of feedwater and boiler water quality against GB/T 1576, a thermal efficiency test report every three years and after a new installation, an overhaul or a technological renovation, carried out by a specialised unit according to GB/T 10180, and a boiler load that apart from short-term loads should not fall below 70 % of the rated evaporation or rated heat, and the monitoring test items of 3.2, namely the boiler flue gas temperature, the exhaust air coefficient, the carbon content of the slag and the furnace surface temperature.

Clause 4, industrial boiler energy monitoring method, requires testing under ordinary operating conditions, counts the test time from the moment steady thermal conditions are reached, reads the test parameters every 15 minutes and takes their arithmetic mean as the test result, requires instruments that suit the test items and are intact, within their test cycle and of an accuracy of not less than 2.0, and places the exhaust gas temperature test in a straight flue within 1 m of the outlet of the last stage of the boiler tail heating surface, where the draft breaks off.

Appendix A is normative and Appendix B is informative. It replaces GB/T 15317-1994, was issued on 2009-10-30 and has applied since 2010-05-01.

Found what you need?

Document preview — GB/T 15317-2009

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01
Replacing
GB/T 15317-1994

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Industrial boiler energy monitoring project
  • 4 Industrial boiler energy monitoring method

Foreword

This standard replaces GB/T 15317-1994 "industrial boiler energy-monitoring methods." This standard compared with GB/T 15317-1994, the main changes are as follows.

--- The standard name to "coal-fired industrial boilers energy monitoring";

--- Increased the circulating fluidized bed boiler energy monitoring requirements;

--- Added boiler operator requirements;

--- Check the project increased the fuel into the furnace requirements;

--- Check the items removed concerning emission rate requirements;

--- Modify the index calculation formula;

--- The assessment index requirements have been adjusted and refined;

--- Specifies the calculation method of the amount of energy waste;

--- Standardize the energy conservation monitoring report format.

Appendix A of this standard is a normative appendix, Appendix B is an informative annex.

1 Scope

This standard specifies the coal-fired industrial boiler energy use monitoring program, monitoring methods and assessment indicators.

This standard applies to the rated thermal power (rated evaporation) is greater than 0.7MW (1t/h), is less than or equal to 24.5MW (35t/h) work Steam boilers and heating industry rated greater than 2.5GJ/h industrial hot water boiler.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 1576 industrial boiler water quality Performance testing procedures GB/T 10180 industrial boilers Thermal

GB/T 17954 Industrial Boiler economy

3 Industrial boiler energy monitoring project

3.1 Industrial boiler energy monitoring inspection items

3.1.1 whether it is included in the national phase-out catalog boiler; boiler Capacity range if they are, should be the competent authority for approval, its technical and economic Indicators should be consistent with GB/T 17954 a furnace requirements.

3.1.2 The main boiler operator should hold a training certificate and proof of eligibility for employment.

3.1.3 Boiler feedwater, boiler water quality should be recorded and analyzed regularly in line with GB/T 1576 requirements.

3.1.4 shall be three years, the thermal efficiency of the test report, the boiler after a new installation, overhaul, technological innovation should be carried out to test the thermal efficiency, thermal efficiency test By specialized units according to GB/T 10180 performed.

3.1.5 boiler load, in addition to short-term load, in general, should not be less than the rated evaporation or rated for 70% of the heat.

3.2 Industrial Boiler Energy Conservation Monitoring Test Project

3.2.1 The boiler flue gas temperature.

3.2.2 Exhaust air at the coefficient.

3.2.3 Slag carbon content

3.2.4 Furnace surface temperature […]

4 Industrial boiler energy monitoring method

4.1 Test conditions

Testing should be conducted in the ordinary operating conditions.

4.2 Testing time

Monitoring test time. from the beginning to reach steady state thermal conditions, the test time should be less than 1h; removing the need for the project to laboratory analysis In addition, the test parameters once every 15min, the arithmetic mean as the test result.

4.3 Test Instruments

Monitoring instruments used should meet the requirements of the test items, instruments should be intact, within the test cycle, the accuracy of not less than 2.0.

4.4 Exhaust gas temperature test

Test carried out on the exhaust gas temperature at the outlet should be the last stage of the boiler heating surface of the tail within 1m of straight flue, temperature measurement devices should be inserted

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 15317

EditionTitleRevisionStatus
GB/T 15317-2009Monitoring and testing for energy saving of coal fired industrial boilerscurrent editionCurrent
GB/T 15317-1994Monitoring and testing for energy saving of coal fired industrial boilersprevious editionSuperseded

This page sells the current edition, GB/T 15317-2009. Earlier editions are listed for reference only.

How to Download GB/T 15317-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 15317-2009

$145.00