Valid

GB/T 14598.10-2012Measuring relays and protection equipment -- Part 22-4: Electrical disturbance tests -- Electrical fast transient/burst immunity test (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for GB/T 14598.10-2012 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

January 1, 1970

Implementation date

January 1, 1970

Scope

GB/T 14598.10-2012 (Measuring relays and protection equipment -- Part 22-4: Electrical disturbance tests -- Electrical fast transient/burst immunity test) is available as an English-translated PDF.

GB/T 14598.10-2012 — GB/T 14598 in this section to GB/T 17626.4-2008 basis, refer to the appropriate part of this publication, it provides for electrical fast General requirements for fast transient immunity test.

These measuring relays and protection equipment tests for electric power used by the system, including those Apparatus for use with control, monitoring and process interface equipment.

Purpose of the test is to verify the test was repeated and the apparatus is energized by the subject, such as inductive loads, relay contact bounce caused by of Fast Transient (burst) whether the harassment work correctly.

The requirements of this section apply to new measuring relays and protection equipment, all the tests only type testing. The purpose of this section is to provide. - The definitions of terms used; - test severity; - test equipment; - Test configurations; - test procedures; - acceptance criteria; - test report.

Found what you need?

Document preview — GB/T 14598.10-2012

National Standard of the People's Republic of China

ICS
29.120.70
Classification
K 45
Replacing
GB/T 14598.10-2007

Issued by: Standardization Administration of China

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Test severity
  • 5 3 Test Equipment
  • 6 Test Configuration
  • 7 Test Procedure
  • 8 5 acceptance criteria
  • 9 Test Report
  • Appendix A (informative) Background information fast transient/burst immunity test
  • Annex B (informative) Electromagnetic environment test sample A and B are two levels of
  • Test port 1 for measuring relays and protection equipment

Foreword

GB/T 14598 "for measuring relays and protection equipment" is divided into several parts.

--- Part 1. Electrical relays - Part 23. Contact performance;

--- Part 3. Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests;

--- Part 4. Electrical relays Part XIV. Priority value of the electrical contacts of the relay contact life test load;

--- Part 5. Electrical relays - Part 15. Electrical characteristics of relay contacts life testing of test equipment;

--- Part 6. Electrical relays - Part 18. There are no size or generic relay;

--- Part 7. Electrical relays - Part 3. Single input dependent or independent time energizing quantity measuring relays;

--- Part 8. Electrical relays - Part 20. Protection system;

--- Part 9. 22-3 metric part relays and protection equipment. Electrical disturbance tests --- radiated electromagnetic field immunity;

--- Part 10. 22-4 section for measuring relays and protection equipment. Electrical disturbance tests - Electrical fast transient/burst immunity Test;

--- Part 11. Part 11 for measuring relays and protection equipment. Auxiliary power port voltage dips, short interruptions, voltage variations and ripple;

--- Part 13. Electrical relays - Part 22-1. Electrical disturbance tests for measuring relays and protection 1MHz pulse device Immunity test;

--- Part 14. Measuring Part 22-2 relays and protection equipment. Electrical disturbance tests --- electrostatic discharge test;

--- Part 15. Electrical relays - Part 8. Thermal electrical relays;

--- Part 16. Electrical relays - Part 25. Electromagnetic emission tests measure relays and protection equipment;

--- Part 17. Electrical relays - Part 22-6. Measuring relays and protection equipment - Electrical disturbance tests --- RF field sense should be conducted disturbances immunity;

--- Part 18. Measuring relays and protection equipment - Part 22-5. Electrical disturbance tests - Surge immunity test;

--- Part 19. Electrical relays - Part 22-7. Measuring relays and protection equipment - Electrical disturbance tests --- frequency immunity Test;

--- Part 20. Electrical relays - Part 26. Measuring relays and protection equipment electromagnetic compatibility requirements;

--- Part 27. Part 27 measurement relays and protection devices. product safety requirements;

--- Part 300. Computer transformer protection equipment requirements;

--- Section 301. Computer generator transformer fault recorder technology requirements;

--- Part 303. Digital motor protection devices General.

This section GB/T 14598 Part 10.

This section drafted in accordance with GB/T 1.1-2009 given rules.

This Part replaces GB/T 14598.10-2007 "Electrical relays - Part 22-4. Electrical Sao measuring relays and protection equipment

--- Electrical interference test fast transient/burst immunity test ", compared with the GB/T 14598.10-2007, the main technical changes are as follows.

--- Standard name becomes "Part 22-4 for measuring relays and protection equipment. Electrical disturbance tests - Electrical fast transient/burst Immunity test ";

--- Repetition rate to test part of the voltage (5 or 100) (1 ± 10%) kHz.

Consistency correspondence between this part of international documents and normative references of our files are as follows.

--- GB/T 4365-2003 Electrotechnical terminology Electromagnetic compatibility [IEC 60050 (161).1990, IDT].

This section uses the translation method is equivalent to using IEC 60255-22-4:2008 "Part 22-4 for measuring relays and protection equipment. Electrical Sao Test for immunity Electrical fast transient/burst immunity test. " this part is proposed by the China Electrical Equipment Industrial Association.

This part of the National measuring relays and protection equipment Standardization Technical Committee (SAC/TC154) centralized.

This section is drafted. Nanjing NARI-RELAYS Electric Co., Guodian Nanjing Automation Co., Ltd., Xuchang smart grid equipment Test and Research Institute, XJ Electric Co., Ltd., Beijing Sifang Automation Co., Ltd., Xuchang Cape Electrical Testing Institute, beads Sea Wanlida Electric Co., Ltd., Beijing Purple Control Co., Ltd., Dongfang Electronics Co., Ltd., integrated into an electronic Co., Ltd., Shanghai Relay Co., Ltd., Hebei North Heng Electric Co., Ltd., Shanghai Electric Power Automation Tianzheng tomorrow Limited, ABB (China) have Limited, Schneider Electric (China) Investment Co., Ltd., Jiang Su Jinzhi Technology Co., Ltd., Siemens Power Automation Limited.

1 Scope

GB/T 14598 in this section to GB/T 17626.4-2008 basis, refer to the appropriate part of this publication, it provides for electrical fast General requirements for fast transient immunity test. These measuring relays and protection equipment tests for electric power used by the system, including those Apparatus for use with control, monitoring and process interface equipment.

Purpose of the test is to verify the test was repeated and the apparatus is energized by the subject, such as inductive loads, relay contact bounce caused by of Fast Transient (burst) whether the harassment work correctly.

The requirements of this section apply to new measuring relays and protection equipment, all the tests only type testing.

The purpose of this section is to provide.

- The definitions of terms used;

- test severity;

- test equipment;

- Test configurations;

- test procedures;

- acceptance criteria;

- test report.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 14598.2-2011 metric Part 1 relays and protection equipment. General requirements (IEC 60255-1:2009, IDT) GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test (IEC 61000-4-4:2004, IDT) IEC 60050-161 International Electrotechnical Vocabulary - Part 161. Electromagnetic compatibility (Internation Electrontechnical Vocabulary.Chapter161. Electromagneticcompatibility)

3 Terms and Definitions

The following terms and definitions apply to this document.

Subjects means equipmentundertest; EUT is means tested. It can be a measure of the relay or a protection device.

Auxiliary equipment Provision of equipment for the desired signal is a pilot plant work, and are used to verify the performance of the pilot plant equipment.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 14598.10-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 14598.10-2012

$494.00