GB 29039-2012Steel heating radiator (English PDF)
钢制采暖散热器
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for GB 29039-2012 in 30 minutes.
Issued by
Standardization Administration of China
Level / Type
National · Mandatory
Issue date
December 31, 2012
Implementation date
November 1, 2013
Scope
GB 29039-2012 is the English-translated version of 钢制采暖散热器.
GB 29039-2012 — This standard specifies the classification and steel type heating radiator, requirements, test methods, inspection rules, flags, and instructions for use of qualified Cards, packaging, transportation and storage.
This standard applies to industrial and civil buildings, does not exceed 95 °C hot water or saturated steam is not higher than the heat medium is 0.3MPa Steel heating radiator (hereinafter referred to as the radiator).
Found what you need?
Document preview — GB 29039-2012
National Standard of the People's Republic of China
- ICS
- 91.140.10
- Classification
- Q 83
Issued by: Standardization Administration of China
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Types and models
- 4.1 Classification
- 4.2 Model
- 5 Requirements
- 5.1 Performance Requirements
- 5.2 Material
- 5.3 Welding quality
- 5.4 Thread quality
- 5.5 Coating quality
- 5.8 Other
- 6 Test methods
- 6.2 Material Inspection
- 6.3 Welding quality inspection
- 6.4 Thread quality inspection
- 6.5 Coating quality inspection
- 6.6 Test dimensions as the limit deviation
- 6.7 Geometric tolerance test
- 6.8 Other tests
- 7 Inspection rules
- 7.1 Inspection Classification
- 7.2 Factory inspection
- 7.3 Type inspection
- 7.4 Inspection Report
- 8 Signs, instructions and certificate
- 8.1 Mark
- 8.2 Manual
- 8.3 Certification
- 9 Packaging, transport and storage
- 9.1 Packaging
- 9.2 Transport
- 9.3 Storage
Foreword
Article 5.1 and Article 5.2 of the standard is mandatory, the rest are recommended.
This standard was drafted in accordance with rules GB/T 1.1-2009 given.
The standard proposed by the People's Republic of China Ministry of Housing and Urban-Rural Development.
This standard by the National HVAC and purification Standardization Technical Committee (SAC/TC143) equipment.
This standard drafting unit. China Academy of Building Research.
Participated in the drafting of this standard. China Construction Metal Structure Association Heating Radiator Committee, the State Quality Supervision and Inspection of air-conditioning equipment Heart, Harbin Institute of Technology, the State Building Materials Industry Building Hardware Plumbing Product Quality Supervision and Testing Center, Beijing Florence cooling Co., Ltd, Nuoro (China) Co., Ltd., Lanzhou Longxing Woer Kai heating equipment Manufacturing Co., Rettig (China) Co., Ltd., Tangshan Chase Metal Products Co., AFG (Shanghai) Management Co., Ltd., Tianjin Rui new Radiator Co., Tianjin Mading Kang Hua Stainless Steel Products Co., Ltd., Beijing clover radiator plant, the Beijing New Building Materials Co., Ltd., Shandong Bangtai Radiator Co., Ltd., Beijing Wanlian Hengtong Technology Co., Ltd., Hebei warm Spring St. Radiator Co., Ltd., Henan Qianfeng Radiator Co., Limited Qingdao Ciga building equipment the company, Qingdao Huatai Radiator Co., Townsend (China) HVAC Equipment Co., Ltd., Shenyang Kyrgyzstan water radiator factory, Tianjin Hua Chen cooling Co., Ltd, Zhengzhou City Vaasa Qi Radiator.
1 Scope
This standard specifies the classification and steel type heating radiator, requirements, test methods, inspection rules, flags, and instructions for use of qualified Cards, packaging, transportation and storage.
This standard applies to industrial and civil buildings, does not exceed 95 °C hot water or saturated steam is not higher than the heat medium is 0.3MPa Steel heating radiator (hereinafter referred to as the radiator).
2 Normative references
The following documents for the application of this document is essential. For dated references, only applies to the version dated paper Pieces. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging Pictorial signs GB/T 699 high-carbon steel GB/T 700 carbon steel GB/T 985.1 gas welding, arc welding, gas welding and high-energy beam welding groove Recommended GB/T 1732 Film impact resistance assay GB/T 1733 film water resistance assay GB/T 7307 55 ° non-sealing pipe thread GB/T 9286-1998 Paints and varnishes cut test GB/T 9969 General Industrial Product Manual GB/T 12467.3 metallic welding material quality requirements - Part 3. General Quality Requirements GB/T 13237 high-carbon structural steel sheets and strips GB/T 13754 Determination of the amount of heat the heating radiator GB/T 19866 welding procedure and the general principles of assessment HG/T 2006 thermosetting powder coating JB/T 9062-1999 heating ventilation and air conditioning conditions Coating Technology
3 Terms and Definitions
The following terms and definitions apply to this document.
Standard heat dissipation standardthermaloutput Heat radiation amount in the radiator GB/T 13754 standard test conditions specified obtained.
Metal heat intensity heatemissionperweightperexcesstemperatureofradiator in the standard test conditions radiator units through heat output per unit mass than the temperature of the metal.
The same side of the inlet and outlet center distance distancebetweeninletandoutlet Ipsilateral radiator inlet and a distance between the nozzle.
Thin-walled steel radiator flow passage steelradiatorwiththinwalofflowvessel Radiator finished steel radiator flow passage is less than the minimum thickness of 1.8mm.
Thick steel radiator flow passage steelradiatorwiththickwalofflowvessel Finished radiator flow passage is equal to or greater than the minimum wall thickness of 1.8mm steel radiator.
4 Types and models
4.1 Classification
4.1.1 The form of the structure is divided Into steel plate radiator, columnar steel, steel radiators, convector steel and steel bathroom radiator, symbols it is represented by B, Z, G, C, W and the like.
4.1.2 According to the same side of the inlet and outlet center distance divided
Ipsilateral center distance of the inlet and outlet of the main parameters of the series, the inlet and outlet on the same side with the symbol represents the center distance.
4.1.3 Divided by the radiator flow channel thickness
Steel into a thin-walled flow passage and the radiator flow passage thick steel radiator, symbol represented by a minimum wall thickness of finished runner.
4.2 Model
Steel
structure type
The same side of the inlet and outlet center distance, mm - -Minimum wall thickness of finished radiator flow passage, mm / -Working pressure, MPa Note. the manufacturer can add other necessary information on the basis of the contents of the marker, such as size, number of sheets in combination, the amount of heat dissipation, the interface diameter, etc., in the structure in the form of heat sink may be added to represent the characteristic parameter, such as a plate type dual convection plate B22 represents a double sheet, Z3, G3 represents three columns, C2/20 represent two DN20 pipe.
Model example.
Ipsilateral export center distance of 500mm, a radiator flow passage finished minimum thickness 1.5mm, a working pressure of 0.8MPa steel three columnar radiator, which is standard Referred to as. GZ3-500-1.5/0.8.
5 Requirements
5.1 Performance Requirements
5.1.1 Operating Pressure
Radiator minimum operating pressure should be greater than or equal to 0.4MPa, and shall meet the requirements of heating system operating pressure.
5.1.2 Standard amount of heat
Standard heat radiation amount of the radiator manufacturers express greater than or equal to 95% of the standard amount of heat.
5.1.3 Minimum metal heat intensity
The minimum strength metal heat radiator should meet the requirements of Table 1.
Table 1 minimum metal heat intensity in units of W/(kg · K)
Radiator Category
Thin-walled flow passage Columnar steel and Pipe Radiator Thick flow channel Columnar steel and Pipe Radiator Thin-walled flow passage Steel convection heat sink Thick flow channel Steel convection heat sink Steel plate heat sink Steel bathroom heat sink Minimum metal heat intensity 0.75 0.50 0.95 0.70 0.95 0.80
5.2 Material
5.2.1 Pipe
When the material for the steel pipe, thick-walled heat sink flow channel material should meet the requirements GB/T 699 or GB/T 700, the finished radiator flow channel thickness not less than 1.8mm; flow channel thin-walled heat sink material should meet the requirements of GB/T 699 are killed steel, the wall thickness of the flow channel should not be finished radiator Less than 1.0mm.
5.2.2 Steel
When made of steel, the material should meet the requirements GB/T 13237 in killed steels, the radiator flow channel material to be 1.2mm greater than the thickness, bulk Finished heat flow path wall thickness of not less than 1.0mm.
5.3 Welding quality
5.3.1 radiator welding quality should meet the requirements GB 985.1, GB/T 12467.3 and GB/T 19866's.
5.3.2 radiator should be firmly welded, the welding points should be smooth, without cracks, holes and incomplete penetration and burn-through defects.
5.3.3 welding heat sink should be flat as a whole, the appearance of smooth, uniform, neat and beautiful, without significant deformation, distortion.
5.3.4 welded should have a free residual slag within the radiator, the minimum flow passage equivalent diameter of not less than 8mm.
5.3.5 convection with a heat sink plate, high-frequency welding or other fastening methods should be used to ensure that the convection between the sheet and the pipe.
5.4 Thread quality
5.4.1 radiator interface with a threaded connection, a threaded fastener should ensure complete at least 3.5, not defective. Radiator production should be consistent thread GB/T 7307 is required.
5.4.2 Radiator connection thread should be G
4, G1, G1
4 threads.
5.5 Coating quality
5.5.1 radiator coating material should be used a thermosetting powder coating meets HG/T 2006 requirements, coating adhesion level not less than Two requirements GB/T 9286-1998 predetermined.
5.5.2 radiator impact resistance coating should conform to GB/T 1732 requirements.
5.5.3 Sanitary water resistance type radiator coating should conform to GB/T 1733 requirements.
5.5.4 using electrostatic spray before plating or surface treatment to deal with the outer surface pretreatment good radiator; surface coating Layer should satisfy the requirements of 5.6 in 9062-1999 JB/T.
Dimensions and limit deviations 5.6 Radiator dimensions and limit deviations should meet the requirements of Table 2.
Table 2 Dimensions in millimeters and the limit deviation
Height (H) width (W) on the same side Importers center distance (h) Basic size limit deviation basic size limit deviation basic size limit deviation H<=600 ± 3 W<=100 ± 3 50<=h 1000 L<=1000 L > 1000 Geometric Tolerance 4646
5.8 Other
5.8.1 radiator bleed valve should be reserved for the installation conditions.
5.8.2 Technical conditions radiator working environment should meet the requirements of Appendix A.
6 Test methods
Performance Test 6.1
6.1.1 Pressure test
Radiator pressure test according to the following claims, by a hydraulic or pneumatic test group.
a) radiator test pressure is 1.5 times the working pressure, when the steel plate radiator test pressure may be special requirements to the operating pressure 1.3 times. In the steady time, the radiator does not leak or fizzy qualified. Gauge accuracy no less than 1.5, range is 2.0MPa.
b) when the hydraulic pressure test for time 2min.
c) when the test pressure radiator integrally dipped in the test tank, the steady time 1min.
6.1.2 Standard Test the amount of heat
Standard cooling the radiator should meet the requirements of the test GB/T 13754's.
6.1.3 Metal heat strength test
A metal heat spreader thermal strength test shall comply with the requirements of GB/T 13754's.
6.2 Material Inspection
Technical documents radiator flow channel thickness with a caliper or thickness test, the material properties in a variety of techniques and materials production plant to provide Prevail.
6.3 Welding quality inspection
5.3 radiator welding quality requirements should, after visual inspection using common measurement accuracy of 0.02mm.
6.4 Thread quality inspection
The radiator inlet and outlet pipe threads should visual inspection using a dedicated thread gauge.
6.5 Coating quality inspection
6.5.1 coating adhesion test shall GB/T 9286-1998 of requirements.
6.5.2 Coating impact resistance test should GB/T 1732 is required, the weight should be height 50cm.
6.5.3 bathroom radiator coating water resistance test should GB/T 1733 the requirements, using method B, the boiling water immersion test.
6.5.4 coating surface quality should visual inspection method.
6.6 Test dimensions as the limit deviation
Radiator dimensions and limit deviations should be dedicated and common measurement accuracy of 0.02mm measuring test.
6.7 Geometric tolerance test
Radiator geometric tolerance and the feeler gauge should be no less than three tests with the internet.
6.8 Other tests
Radiator bleed valve installation conditions should reserve by visual inspection method.
7 Inspection rules
7.1 Inspection Classification
The test is divided into radiator factory inspection and type test.
7.2 Factory inspection
7.2.1 Each radiator factory is subject to quality inspection department after passing inspection, before the factory.
7.2.2 factory inspection in accordance with Table 4 of the project by the group tested.
Table 4 Test items list
No. Test Item Technical requirements, test methods identify category Type test Factory test Remark 1 thousand and pressure 5.1.1 6.1.1 5.1.2 6.1.2 2 billion standard amount of heat 5.1.3 6.1.3 3 billion metal heat intensity
4 Materials 5.2 6.2 thousand and factory inspection free of the wall thickness 5 5.3 6.3 thousand and weld quality Without factory inspection Water channel equivalent diameter 6 thousand and thread quality 5.4 6.4 coating Adhesion 5.5.1 6.5.1 billion 5.5.2 6.5.2 square impact resistance Water resistance 5.5.3 6.5.3 billion Only applies to Bathroom radiator 5.5.4 6.5.4 thousand and surface quality of the coating 8 dimensions and limit deviations 5.6 6.6 thousand and 9 5.7 6.7 thousand and geometric tolerance 10 5.8.1 release valve installed 6.8 thousand and conditions
7.3 Type inspection
7.3.1 the following circumstances, should be type tested.
a) the production of a new product or converting the product trial;
b) heat sink design, process or materials are used when significant changes;
c) discontinued more than a year and then resume production;
d) once every four continuous production;
E) When the last factory test results are quite different;
f) the national quality supervision agencies to proceed with a comprehensive inspection.
7.3.2 Type inspection in accordance with Table 4 of the project is examined.
7.3.3 Sampling methods.
A) The batch is less than 100 groups the radiator, the radiator of the same type of sampling less than the number of group 1;
B) When the heat sink is greater than or equal to 100 batches group, the same number of sample type radiator is not less than 2 and not less than the total amount of the model group 1%. The same model number of samples does not exceed five groups;
c) standard radiator heat dissipation and thermal strength of the metal from the sample products, optionally in a test group.
7.3.4 determination principles.
When the pressure, the standard amount of heat, thermal strength metal material and passing all four test items, and other items not more than two nonconformity when the item, determine whether the product qualified; otherwise determines that the product failed.
7.4 Inspection Report
Radiator should have a nationally recognized testing organizations through inspection report issued.
8 Signs, instructions and certificate
8.1 Mark
Each radiator has to be clearly apparent in its position, not easy to eliminate the signs, shall at least include.
a trademark), a factory;
b) Model.
8.2 Manual
Each batch of products should be equipped with required product samples and instructions for use, instructions for use should be consistent with GB/T 9969 requirements, the content of at least it should include.
a) radiator flow channel thickness;
b) heat dissipation characteristics standard formulas;
c) a metal heat intensity and weight of the radiator;
d) water capacity radiator;
e) mounting operation points;
f) a radiator environment and water quality requirements apply.
8.3 Certification
Each radiator factory should be accompanied by a product certificate, which shall include at least.
a) name of the manufacturer;
b) Product name and specifications;
c) type, size, operating pressure, the standard amount of heat;
d) performing the standard number;
e) the test of time, inspectors mark and the production date.
9 Packaging, transport and storage
9.1 Packaging
9.1.1 radiator should adopt recyclable packaging material, and meet the requirements GB T/191.
9.1.2 The radiator should be used to ensure that the product is not deformed during transportation and handling, packaging measures do not damage the quality of products.
9.1.3 Radiator3 thread protection measures should bring.
9.2 Transport
9.2.1 Radiator transport should take rain measures.
9.2.2 shipping and handling should be avoided bump and other heavy compression and to avoid impact with the chemical coating will Mixed.
9.3 Storage
Radiator should be placed within an air drying, ventilation coffers, no contact with corrosive media. Stack height does not exceed 2m, the bottom should be stable Proper booster 100mm ~ 200mm.
Appendix A
(Normative)
Steel heating radiator working conditions Environmental Technology A.1 heat medium is water A.1.1 thin-walled flow channel steel radiator heating system should work as a closed system, the non-heating season should be full of water and maintenance. Radiator heat medium work Dissolved oxygen not more than 0.1mg/L. Response system or replenishment when the water circulating working conditions can not meet the above requirements for proper deal with.
A.1.2 thick steel radiator flow channel quality environment with reference should be thin-walled steel radiator required to perform the flow path.
When the heating medium is steam A.2 it should not be thin-walled steel radiator flow passage.
2102-
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 191Graphical symbols marking for handling and storage of packages
- GB/T 699Quality carbon structure steels
- GB/T 700Carbon structural steels
- GB/T 985.1Recommended joint preparation for gas welding, manual metal arc welding, gas-shield arc welding and beam welding
- GB/T 1732Determination of impact resistance of coating films
- GB/T 1733Determination of resistance to water of films
How to Download GB 29039-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 12467.3-2009 — Quality requirements for fusion welding of metallic materials -- Part 3: Standard quality requirements
GB/T 13237-2013 — Cold rolled quality carbon structural steel sheets and strips
GB/T 13237-2026 — Cold rolled quality carbon structural steel sheet and strip
Secure payment via Stripe
Payments accepted
GB 29039-2012
$165.00