FD 008-2011Technical code for construction planning of offshore wind power projects (English PDF)
海上风电场工程施工组织设计技术规定
This is a limited preview
Buy now to download the full PDF (21 pages)
Need quotation for your management?
Get a formal quotation for FD 008-2011 in 30 minutes.
Issued by
China Institute of Hydropower and Water Conservancy Planning and Design
Level / Type
National · Mandatory
Issue date
May 1, 2011
Implementation date
May 1, 2011
Scope
FD 008-2011 is the English-translated version of 海上风电场工程施工组织设计技术规定.
FD 008-2011 — This standard specifies the design principles of offshore wind farm construction organization design should follow, design methods and technical requirements.
This standard applies to offshore wind farms in the intertidal zone and lower intertidal mudflat wind farms, offshore wind farms, this new establishment, construction design of offshore wind farm expansion project feasibility study stage.
Found what you need?
Document preview — FD 008-2011
National Standard of the People's Republic of China
- ICS
- 27.18
- Classification
- F 11
Issued by: China Institute of Hydropower and Water Conservancy Planning and Design
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 2.1 Terms
- 3 Terms and Definitions
- 4 Overview
- 4.1 General requirements
- 5 Technical Requirements
- 6 Calibration conditions
- 6.1 Environmental conditions
- 6.2 Measurement standards and other equipment
- 7 Calibration items and calibration methods
- 7.1 Calibration Items
- 7.2 Calibration method
- 8 Expression of calibration results
- 9 Recalibration interval
1 Foreword
FD 008-2011 was issued by China Institute of Hydropower and Water Conservancy Planning and Design on 1 May 2011 and took effect the same day.
The document runs to 21 pages in English translation.
2 Scope Preview
This standard specifies the design principles of offshore wind farm construction organization design should follow, design methods and technical requirements. This standard applies to offshore wind farms in the intertidal zone and lower intertidal mudflat wind farms, offshore wind farms, this new establishment, construction design of offshore wind farm expansion project feasibility study stage. Establishment of offshore wind farm project pre-feasibility study stage, tendering and construction design stage construction design documents are available for implementation.
FD 008-2011 falls under ICS 27.18, in the field of energy and heat transfer engineering.
This catalogue holds 5 other FD standards in that field.
In this catalogue, FD standards carry edition years from 2007 to 2011.
3 About this standard
Issued by: China Institute of Hydropower and Water Conservancy Planning and Design
English translation: about 21 pages
Chinese original: about 32,321 characters
4 Related standards
Standards on related subjects:
GB/T 19070-2017 — Stall regulation wind turbines—Control system—Test method
GB/T 17646-2013 — Design requirements for small wind turbine
GB/T 18451.1-2012 — Wind turbine generator systems -- Design requirements
FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report
FD 006-2008 — Preparation rules of offshore windpower projects pre-feasibility study report
FD 005-2008 — Preparation rules of offshore windpower projects plannting report
5 Classification and status
International classification (ICS): 27.18
Chinese Standard Classification (CCS): F 11
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
How to Download FD 008-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report
FD 005-2008 — Preparation rules of offshore windpower projects plannting report
FD 006-2008 — Preparation rules of offshore windpower projects pre-feasibility study report
Secure payment via Stripe
Payments accepted
FD 008-2011
$610.00