FD 005-2008Preparation rules of offshore windpower projects plannting report (English PDF)
近海风电场工程规划报告编制办法(试行)
This is a limited preview
Buy now to download the full PDF (9 pages)
Need quotation for your management?
Get a formal quotation for FD 005-2008 in 30 minutes.
Issued by
China Institute of Hydropower and Water Conservancy Planning and Design
Level / Type
National · Mandatory
Issue date
January 1, 2009
Implementation date
January 1, 2009
Scope
FD 005-2008 is the English-translated version of 近海风电场工程规划报告编制办法(试行).
FD 005-2008 — This standard specifies the principles, the offshore wind farm project planning report should be followed, work program, work content, should meet the working depth and technical requirements.
1. 0. 1 for the rational exploitation of offshore wind energy resources to ensure the orderly construction of offshore wind farms to carry out standard is formulated.
1. 0. 2 offshore wind farm project planning should implement the protection of resources, unified planning, overall balance, principle of reasonable development, consistent with national economic development planning and renewable energy development planning, and coordination with marine function zoning and environmental protection.
1. 0. 3 This standard offshore wind farm is the wind turbine uses a vessel or floating crane construction and installation, and the base is located on the seabed wind farm sites TLT depth generally between 5 ~ 50m of these waters.
1. 0. 4 This standard applies to countries or provinces (autonomous regions, municipalities) offshore wind farm project planning stage, other regional offshore wind farm project planning for implementation.
1. 0. 5 offshore wind farm project preparation planning reports shall meet the requirements of this standard, there should be consistent with existing national policies, provisions and regulations.. 1. 0.
Found what you need?
Document preview — FD 005-2008
National Standard of the People's Republic of China
- Classification
- F 11
Issued by: China Institute of Hydropower and Water Conservancy Planning and Design
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 2.1 Terms
- 3 Terms and Definitions
- 4 Overview
- 4.1 General requirements
- 5 Technical Requirements
- 6 Calibration conditions
- 6.1 Environmental conditions
- 6.2 Measurement standards and other equipment
- 7 Calibration items and calibration methods
- 7.1 Calibration Items
- 7.2 Calibration method
- 8 Expression of calibration results
- 9 Recalibration interval
1 Foreword
FD 005-2008 is issued by China Institute of Hydropower and Water Conservancy Planning and Design.
The document runs to 9 pages in English translation.
2 Scope Preview
This standard specifies the principles, the offshore wind farm project planning report should be followed, work program, work content, should meet the working depth and technical requirements. 1. 0. 1 for the rational exploitation of offshore wind energy resources to ensure the orderly construction of offshore wind farms to carry out standard is formulated. 1. 0. 2 offshore wind farm project planning should implement the protection of resources, unified planning, overall balance, principle of reasonable development, consistent with national economic development planning and renewable energy development planning, and coordination with marine function zoning and environmental protection. 1. 0. 3 This standard offshore wind farm is the wind turbine uses a vessel or floating crane construction and installation, and the base is located on the seabed wind farm sites TLT depth generally between 5 ~ 50m of these waters. 1. 0. 4 This standard applies to countries or provinces (autonomous regions, municipalities) offshore wind farm project planning stage, other regional offshore wind farm project planning for implementation. 1. 0. 5 offshore wind farm project preparation planning reports shall meet the requirements of this standard, there should be consistent with existing national policies, provisions and regulations.. 1. 0. 6 Planning Report required by Chapter 3 of this standard Section 3 1-3 10 for the preparation, the " overview " as Chapter 1, followed by choreography, and the final report should be accompanied by the necessary drawings, Schedules and accessories.
FD 005-2008 is filed under Chinese Standard Classification F 11, in the field of energy and nuclear technology.
This catalogue holds 1 other FD standards without an ICS number.
In this catalogue, FD standards carry edition years from 2007 to 2011.
3 About this standard
Issued by: China Institute of Hydropower and Water Conservancy Planning and Design
English translation: about 9 pages
Chinese original: about 14,135 characters
4 Related standards
Standards on related subjects:
GB/T 19070-2017 — Stall regulation wind turbines—Control system—Test method
GB/T 17646-2013 — Design requirements for small wind turbine
GB/T 18451.1-2012 — Wind turbine generator systems -- Design requirements
FD 008-2011 — Technical code for construction planning of offshore wind power projects
FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report
FD 006-2008 — Preparation rules of offshore windpower projects pre-feasibility study report
5 Classification and status
Chinese Standard Classification (CCS): F 11
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.
How to Download FD 005-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report
FD 008-2011 — Technical code for construction planning of offshore wind power projects
FD 006-2008 — Preparation rules of offshore windpower projects pre-feasibility study report
Secure payment via Stripe
Payments accepted
FD 005-2008
$105.00