FD 006-2008Preparation rules of offshore windpower projects pre-feasibility study report (English PDF)
近海风电声场工程预可行性研究报告编制办法
This is a limited preview
Buy now to download the full PDF (12 pages)
Need quotation for your management?
Get a formal quotation for FD 006-2008 in 30 minutes.
Issued by
China Institute of Hydropower and Water Conservancy Planning and Design
Level / Type
National · Mandatory
Issue date
January 1, 2009
Implementation date
January 1, 2009
Scope
FD 006-2008 is the English-translated version of 近海风电声场工程预可行性研究报告编制办法.
FD 006-2008 — This standard applies to new, expansion of offshore wind farm projects. 1. 0. 1 In order to regulate offshore wind farm project pre-feasibility study report prepared in accordance with, task, contents, depth and technical requirements.
Formulated standards. Preparation 1. 0. 3 offshore wind farm project pre-feasibility study report shall meet the requirements of this standard, there should be consistent with existing national policies, provisions and regulations.
1. 0. 4 The pre-feasibility study report required by Chapter 3 of the standard 3. 1 ~ 3.
Found what you need?
Document preview — FD 006-2008
National Standard of the People's Republic of China
- Classification
- F 11
Issued by: China Institute of Hydropower and Water Conservancy Planning and Design
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 2.1 Terms
- 3 Terms and Definitions
- 4 Overview
- 4.1 General requirements
- 5 Technical Requirements
- 6 Calibration conditions
- 6.1 Environmental conditions
- 6.2 Measurement standards and other equipment
- 7 Calibration items and calibration methods
- 7.1 Calibration Items
- 7.2 Calibration method
- 8 Expression of calibration results
- 9 Recalibration interval
1 Foreword
FD 006-2008 is issued by China Institute of Hydropower and Water Conservancy Planning and Design.
The document runs to 12 pages in English translation.
2 Scope Preview
This standard applies to new, expansion of offshore wind farm projects. 1. 0. 1 In order to regulate offshore wind farm project pre-feasibility study report prepared in accordance with, task, contents, depth and technical requirements. Formulated standards. Preparation 1. 0. 3 offshore wind farm project pre-feasibility study report shall meet the requirements of this standard, there should be consistent with existing national policies, provisions and regulations. 1. 0. 4 The pre-feasibility study report required by Chapter 3 of the standard 3. 1 ~ 3. 13 were prepared in the "Overview" as Chapter 1, followed by choreography, and should attach the necessary final report drawings, schedules and attachments.
FD 006-2008 is filed under Chinese Standard Classification F 11, in the field of energy and nuclear technology.
This catalogue holds 1 other FD standards without an ICS number.
In this catalogue, FD standards carry edition years from 2007 to 2011.
3 About this standard
Issued by: China Institute of Hydropower and Water Conservancy Planning and Design
English translation: about 12 pages
Chinese original: about 18,141 characters
4 Related standards
Standards on related subjects:
GB/T 19070-2017 — Stall regulation wind turbines—Control system—Test method
GB/T 17646-2013 — Design requirements for small wind turbine
GB/T 18451.1-2012 — Wind turbine generator systems -- Design requirements
FD 008-2011 — Technical code for construction planning of offshore wind power projects
FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report
FD 005-2008 — Preparation rules of offshore windpower projects plannting report
5 Classification and status
Chinese Standard Classification (CCS): F 11
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.
How to Download FD 006-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report
FD 008-2011 — Technical code for construction planning of offshore wind power projects
FD 005-2008 — Preparation rules of offshore windpower projects plannting report
Secure payment via Stripe
Payments accepted
FD 006-2008
$165.00