Valid

FD 007-2011Preparation rules of offshore windpower projects feasibility study report (English PDF)

海上风电场工程可行性研究报告编制办法(试行)

Preview PDF

This is a limited preview

Buy now to download the full PDF (61 pages)

Need quotation for your management?

Get a formal quotation for FD 007-2011 in 30 minutes.

Issued by

China Institute of Hydropower and Water Conservancy Planning and Design

Level / Type

National · Mandatory

Issue date

May 1, 2011

Implementation date

May 1, 2011

Scope

FD 007-2011 is the English-translated version of 海上风电场工程可行性研究报告编制办法(试行).

FD 007-2011 — Preparation rules of offshore windpower projects feasibility study report

Found what you need?

Document preview — FD 007-2011

National Standard of the People's Republic of China

ICS
27.18
Classification
F 11

Issued by: China Institute of Hydropower and Water Conservancy Planning and Design

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative References
  • 2.1 Terms
  • 3 Terms and Definitions
  • 4 Overview
  • 4.1 General requirements
  • 5 Technical Requirements
  • 6 Calibration conditions
  • 6.1 Environmental conditions
  • 6.2 Measurement standards and other equipment
  • 7 Calibration items and calibration methods
  • 7.1 Calibration Items
  • 7.2 Calibration method
  • 8 Expression of calibration results
  • 9 Recalibration interval

1 Foreword

FD 007-2011 was issued by China Institute of Hydropower and Water Conservancy Planning and Design on 1 May 2011 and took effect the same day.

The document runs to 61 pages in English translation.

2 Scope Preview

This standard applies between the planning and construction of intertidal mudflat and lower intertidal wind farms, offshore wind farms, wind farms may refer to the deep sea.

FD 007-2011 falls under ICS 27.18, in the field of energy and heat transfer engineering.

This catalogue holds 5 other FD standards in that field.

In this catalogue, FD standards carry edition years from 2007 to 2011.

3 About this standard

Issued by: China Institute of Hydropower and Water Conservancy Planning and Design

English translation: about 61 pages

Chinese original: about 92,948 characters

4 Related standards

Standards on related subjects:

GB/T 19070-2017 — Stall regulation wind turbines—Control system—Test method

GB/T 17646-2013 — Design requirements for small wind turbine

GB/T 18451.1-2012 — Wind turbine generator systems -- Design requirements

FD 008-2011 — Technical code for construction planning of offshore wind power projects

FD 006-2008 — Preparation rules of offshore windpower projects pre-feasibility study report

FD 005-2008 — Preparation rules of offshore windpower projects plannting report

5 Classification and status

International classification (ICS): 27.18

Chinese Standard Classification (CCS): F 11

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 61 pages — is available in the English PDF.

How to Download FD 007-2011

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
61 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

FD 007-2011

$1,989.00