Valid

YS/T 441.2-2014Management rules of nonferrous metals balance. Part 2: Lead enrichment and metallurgy (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (13 pages)

Need quotation for your management?

Get a formal quotation for YS/T 441.2-2014 in 30 minutes.

Issued by

Ministry of Industry and Information Technology

Level / Type

National · Recommended

Issue date

October 14, 2014

Implementation date

April 1, 2015

Scope

YS/T 441.2-2014 (Management rules of nonferrous metals balance. Part 2: Lead enrichment and metallurgy) is available as an English-translated PDF.

YS/T 441.2-2014 — This part of YS/T 441 specifies the terminology, management responsibilities, metal balance calculation formula, and metal balance calculation formula for lead metallurgy smelting.

The preparation method and format of the metal balance meter. This section applies to lead and its subsidiary products of mineral processing and smelting production enterprises.

Found what you need?

Document preview — YS/T 441.2-2014

National Standard of the People's Republic of China

ICS
77.120.01
Classification
H 60
Replacing
YS/T 441.2-2001

Issued by: Ministry of Industry and Information Technology

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 3.1 Beneficiation part

Foreword

YS/T 441-2014 "Non-Ferrous Metal Balance Management Specification" is divided into five parts.

--- Part 1. Copper beneficiation and smelting;

--- Part 2. Lead ore smelting;

--- Part 3. Zinc beneficiation smelting;

--- Part 4. Tin beneficiation and smelting;

--- Part 5. Gold and silver smelting.

This part is the second part of YS/T 441.

This part is drafted in accordance with the rules given in GB/T 1.1-2009.

This part replaces YS/T 441.2-2001 "Non-ferrous metal balance management specification lead ore dressing smelting part", this part and YS/T 441.2-2001 in comparison, the main changes are as follows.

--- The terminology and definition of the beneficiation part increased the definition of raw ore, concentrate, tailings, medium ore, metal loss and metal balance;

The division adds five definitions of process recovery, metal recovery, total lead smelting recovery, metal loss and metal balance;

--- The definitions of the terms "return", "metal recovery rate", "counting", and "drying amount" have been modified;

--- Simplified the content of "management responsibilities";

--- Modified the "Selected Minerals Flow Chart (see Figure 1)";

--- Modified some of the words in the "5.2.2 sampling and sample preparation methods";

--- Deleted the specific device in the "5.3.1 Count Range";

--- Modified the contents of "5.3.2 inventory time";

--- Modified the relevant content of "5.3.3.3 Field Measurement Method";

--- The contents of the "5.4.1 Metal Balance Requirements" have been revised;

---In the "5.4.2 calculation method", add the calculation formula of "processing raw ore grade", "concentrate grade", "tailing grade" and other indicators;

--- Modified the "smelting material flow chart (see Figure 3)";

---In the "6.2.1 product" to increase the quality of sub-zinc oxide products should be implemented;

---In the "6.2.2 sampling preparation method" to increase the crude lead and anode mud should be implemented standards;

--- Adding anode slime in "6.2.3 Analytical Method" should implement the standard;

--- Appropriate modification of "6.3.3.1 Weighing Method";

--- Appropriate modification of "6.3.3.3 Field Measurement Method";

--- Add by-products in "6.4.2.2";

--- Modified "6.4.2.3";

--- Added "Report period of 6.4.2.7 inventory is consistent with the statistical period of metal balance";

--- Added "6.4.3 Metal Balance and Calculation Method";

--- Modified the original "6.4.3";

--- Added "6.4.3.1 Metal Balance Requirements";

--- According to the actual production, the format and content of the metal balance sheet of Appendix A smelting enterprises have been increased.

This part is under the jurisdiction of the National Nonferrous Metals Standardization Technical Committee (SAC/TC243).

This section is responsible for drafting the unit. China Nonferrous Metals Industry Standard Measurement Quality Institute.

This section drafted by. Henan Yuguang Gold Lead Co., Ltd.

Participated in the drafting of this section. Jiangxi Copper Co., Ltd., Baiyin Nonferrous Metals Group Co., Ltd.

1 Scope

This part of YS/T 441 specifies the terminology, management responsibilities, metal balance calculation formula, and metal balance calculation formula for lead metallurgy smelting.

The preparation method and format of the metal balance meter.

This section applies to lead and its subsidiary products of mineral processing and smelting production enterprises.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 469 lead ingot

GB/T 4103 (all parts) Chemical analysis methods for lead and lead alloys GB/T 8152 (all parts) Chemical analysis method for lead concentrate GB/T 14260 bulk heavy non-ferrous metal flotation concentrate sampling, sample preparation rules GB/T 14262 bulk flotation lead concentrate sampling, sample preparation method YS/T 53 (all parts) Copper, lead, zinc ore and tailings chemical analysis methods YS/T 71 rough lead YS/T 73 by-product zinc oxide YS/T 87 copper and lead electrolytic anode mud sample preparation method YS/T 248 (all parts) crude lead chemical analysis method YS/T 319 lead concentrate

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Beneficiation part

3.1.1

Raw ore rawminerals

The ore that is sent from the stop to the concentrator also includes other materials that enter the beneficiation process.

3.1.2

Concentrate concentrates After the ore or raw materials are selected, the useful ingredients are obtained.

3.1.3

Tailings

After the ore or raw material has been selected, the product with little or no further processing value is called tailings.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.

Referenced standards

How to Download YS/T 441.2-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
13 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YS/T 441.2-2014

$734.00