Valid

TD/T 1037-2013Regulation on compiling feasibility study report of major land consolidation projects (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (44 pages)

Need quotation for your management?

Get a formal quotation for TD/T 1037-2013 in 30 minutes.

Issued by

Ministry of Land and Resources of the People's Republic of China

Level / Type

National · Recommended

Issue date

January 1, 2013

Implementation date

August 1, 2013

Scope

TD/T 1037-2013 (Regulation on compiling feasibility study report of major land consolidation projects) is available as an English-translated PDF.

TD/T 1037-2013 - This standard specifies the principle, content and achievement requirements of the feasibility study report on major projects of land remediation.

This standard applies to the Central Fund to support the construction of land remediation major project feasibility study report preparation, other land remediation project can refer to the implementation.

Found what you need?

Document preview — TD/T 1037-2013

National Standard of the People's Republic of China

ICS
91.020
Classification
P04

Issued by: Ministry of Land and Resources of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General
  • 5 General Description
  • 6 Project background and preparation basis
  • 7 Overview of the construction area
  • 8 Construction Conditions Analysis
  • 9 Planning programs and construction content

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard is proposed and managed by the Ministry of Land and Resources of the People's Republic of China.

This standard is mainly drafted by. Land and Resources Ministry of land remediation center, Ministry of Land and Cultivated Land Protection Division, Nanjing University.

1 Scope

This standard specifies the principle, content and achievement requirements of the feasibility study report on major projects of land remediation.

This standard applies to the Central Fund to support the construction of land remediation major project feasibility study report preparation, other land remediation project can refer to the implementation.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 21010 Status of land use classification TD/T 1007 Cultivated Land Reserve Resources Survey and Evaluation Technical Regulations TD/T 1012 land development and consolidation project planning and design specifications TD/T 1031.7 Land Reclamation Planning Guidelines Part 7. Uranium TD/T 1033 high standards of basic farmland construction standards

3 Terms and definitions

The following terms and definitions apply to this document.

Land remediation major project majorlandconsolidationproject Under the premise of protecting and improving the ecological environment and maintaining the balance of water and soil resources in the region, based on the overall land use planning and land regulation rules Plan, in order to achieve the goal of raising the quality of arable land, increasing the quantity of cultivated land and ensuring food security, etc., forming a cluster of scale benefits and implementing land remediation Land remediation activities carried out by specific target tasks in key areas.

Major project construction zone constructionzoneformajorlandconsolidationproject Carry out land remediation major project construction area.

Major projects Area constructionsub-zoneformajorlandconsolidationproject According to the boundaries of administrative divisions, the natural dividing line, infrastructure, construction of land remediation major construction projects will be divided into reflect the regional differences and Land reclamation project type characteristics, easy to manage and implement the area.

Sub-project

In the major project area, units built according to an implementation year generally do not break the administrative boundaries at the county level. Subproject is the whole land the management of major project management unit.

Land improvement project landconsolidationengineering to achieve the goal of land remediation of the engineering measures taken.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 44 pages — is available in the English PDF.

Referenced standards

How to Download TD/T 1037-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
44 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TD/T 1037-2013

$590.00