TB/T 3189-2007Specification of railway signal axle counter application system (English PDF)
铁路信号计轴应用系统技术条件
This is a limited preview
Buy now to download the full PDF (8 pages)
Need quotation for your management?
Get a formal quotation for TB/T 3189-2007 in 30 minutes.
Issued by
National Railway Administration of the People’s Republic of China
Level / Type
National · Recommended
Issue date
July 15, 2015
Implementation date
February 1, 2016
Scope
TB/T 3189-2007 is the English-translated version of 铁路信号计轴应用系统技术条件.
TB/T 3189-2007 — This Part specifies the indoor test method for the insulation electric resistance of fastener assembly. This Part applies to fastening systems for high-speed railway.
Found what you need?
Document preview — TB/T 3189-2007
National Standard of the People's Republic of China
- ICS
- 45.080
- Classification
- S 12
Issued by: National Railway Administration of the People’s Republic of China
Contents
- Foreword...3
- 1 Scope...4
- 2 Normative Reference...4
- 3 Sign...4
- 4 Principle...4
- 5 Test Equipment...5
- 6 Test Pieces...5
- 7 Test Procedure...5
- 8 Calculation...7
- 9 Test Report...8
Foreword
TB/T 3396 Test Methods for Fastening Systems of High-Speed Railway consists of the
following 7 parts:
--- Part 1: Determination of Longitudinal Rail Restraint;
--- Part 2: Determination for Clamping Force;
--- Part 3: Determination of Static Stiffness for Fastening Assembly;
--- Part 4: Test of Fatigue Performance of Fastening Assembly;
--- Part 5: Determination of Electrical Resistance;
--- Part 6: Effect of Severe Environmental Conditions;
--- Part 7: Vertical Load Test for Cast-in Fastening Components.
This Part is Part 5 of TB/T 3396.
This Part was drafted as per the rules specified in GB/T 1.1-2009.
This Part shall be under the jurisdiction of Institute of Standards and Metrology, China
Academy of Railway Sciences.
Drafting organizations of this Part: Railway Engineering Research Institute, China Academy of
Railway Sciences.
Chief drafting staffs of this Part: Zhao Rukang, Xiao Junheng, Fang Hangwei, Xu Shaohui, and
Li Zirui.
Test Methods for Fastening Systems of High-Speed
Railway – Part 5: Determination of Electrical Resistance
1 Scope
This Part specifies the indoor test method for the insulation electric resistance of fastener
assembly.
This Part applies to fastening systems for high-speed railway.
2 Normative Reference
The following documents are essential to the application of this Document. For the dated
documents, only the versions with the dates indicated are applicable to this Document; for the
undated documents, only the latest version (including all the amendments) is applicable to this
Document.
GB/T 6908 Analysis of water used in boil and cooling system - Determination of electrical
conductivity
3 Sign
The following signs are applicable to this Document.
Kgamma: correction factor for conductivity of test water;
Rgamma: the measured electric resistance, in ohm;
R33: the value of electric resistance when the conductivity of water is corrected into 33mS/m,
in ohm;
gamma: conductivity of the used water at 25°C, in mS/m.
4 Principle
Measure the value of electric resistance between two short rails fixed on the sleeper with
fasteners under the water spraying condition of the specified water spraying rate. The
conductivity of water is corrected by the coefficient Kgamma.
5 Test Equipment
5.1 Rail
Two short rails with a length of about 0.5 m have the same cross-section as the rails used for
assembling the tested fasteners. There should be no floating rust on the surface of the rail.
5.2 Water
The test water was potable water of known conductivity (range 20 mS/m ~ 80 mS/m).
5.3 Spraying device
As shown in Figure 1, a shelf that can move parallel to the rail is equipped with four nozzles
with a diameter of 3.6 mm and a spray taper of 100°~125°. It shall also be equipped with
equipment capable of controlling and measuring the nozzle flow.
5.4 Power supply
The alternating current with voltage of 30V±3V, and frequency of 50Hz±15Hz.
5.5 Testing instrument
The testing instrument shall be able to measure the voltage and current between the two rails
with a measurement accuracy of 1%; and can calculate the electric resistance of 1 × 102 ohm ~ 1
× 106 ohm. The test equipment shall be able to print out and calculate the recorded resistance-time
curve.
6 Test Pieces
6.1 Sleeper
Sleepers with built-in parts for fasteners or reserved holes.
6.2 Fastener
The complete set of fasteners including all parts.
7 Test Procedure
Test the conductivity and temperature of the test water according to the provisions of GB/T
6908 for testing and calculation; and correct the conductivity of the test water to the value gamma at
......
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.
How to Download TB/T 3189-2007
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 1979-2023 — Special metallic materials for railway locomotive and rolling stock - Atmospheric corrosion-resistant steel
TB/T 2344.1-2020 — Rail - Part 1: 43kg/m ~ 75kg/m rails
TB/T 3475.8-2020 — Components of diesel engine for locomotive and DMU - Part 8: Turbocharger
Secure payment via Stripe
Payments accepted
TB/T 3189-2007