Valid

TB/T 2344.1-2020Rail - Part 1: 43kg/m ~ 75kg/m rails (English PDF)

Preview PDF

Also coversTBT2344.1-2020

This is a limited preview

Buy now to download the full PDF (8 pages)

Need quotation for your management?

Get a formal quotation for TB/T 2344.1-2020 in 30 minutes.

Issued by

Ministry of Railways of the People’s Republic of China

Level / Type

National · Recommended

Issue date

February 24, 1998

Implementation date

September 1, 1998

Scope

TB/T 2344.1-2020 (Rail - Part 1: 43kg/m ~ 75kg/m rails) is available as an English-translated PDF.

TB/T 2344.1-2020 — This Standard specifies the technical requirements, inspection rules and transportation, storage of sub-ballast for ballast bed of railways (hereinafter referred to as sub-ballast).

This Standard applies to national railways; local railways and industrial enterprise railways may also refer to this Standard.

Found what you need?

Document preview — TB/T 2344.1-2020

National Standard of the People's Republic of China

Issued by: Ministry of Railways of the People’s Republic of China

Contents

  • Foreword...3
  • 1 Scope...4
  • 2 References...4
  • 3 Terms...4
  • 4 Technical requirements...4
  • 5 Inspection rules...6
  • 6 Transportation, storage...8

Foreword

Sub-ballast is an important part of the ballast bed of railways and is located between

the ballast layer of the ballast bed and the surface layer of the subgrade bed. It plays

the role of transmitting and distributing the train loads, preventing mutual penetration

of top-ballast and surface layer particles of subgrade bed, water seepage transition

and antifreeze-and-insulation. In the past, China borrowed the experience of using

river sands as sub-ballast from the former Soviet Union. Since there is no material

standard, the above-mentioned functions of the sub-ballast cannot be guaranteed and

the material source of the sub-ballast is limited. On the basis of reference to the

relevant standards such as the sub-ballast material standards of the United States

Railway Engineering Association (AREA), Japan railway subgrade bed surface layer

(JISA5001 particle size transitional gravel layer) material standards, combining China's

national conditions and railway situation, this Standard is developed.

This Standard is proposed by Railway Engineering Research Institute of China

Academy of Railway Sciences.

This Standard is under the jurisdiction of Institute of Standard Metrology of National

Railway Administration of the People's Republic of China.

Railway Engineering Research Institute of China Academy of Railway Sciences is

responsible for the drafting of this Standard.

Main drafters of this Standard. Zeng Shugu, Zhang Wensheng, Xu Yongxian, Wang

Hong, Liu Zengjie.

Sub-ballast for ballast bed of railways

1 Scope

This Standard specifies the technical requirements, inspection rules and transportation,

storage of sub-ballast for ballast bed of railways (hereinafter referred to as sub-ballast).

This Standard applies to national railways; local railways and industrial enterprise

railways may also refer to this Standard.

2 References

The following standards contain provisions which, through reference in this text,

constitute provisions of this standard. At time of publication, the editions indicated were

valid. All standards are subject to revision, and parties to agreements based on this

standard are encouraged to investigate the possibility of applying the most recent

editions of the standards indicated below.

TB/T 2140-90 Railway ballast

TB/T 2328.1~18-92 Test method for railway ballast

3 Terms

The plasticity index Ip. the plasticity index is equal to the difference between the liquid

limit LL and the plastic limit PL.

4 Technical requirements

4.1 Sub-ballast material may be taken from natural gravel material, or may be taken

from rocks or natural pebbles, gravels by crushing, screening.

4.3 The mass percentage of particles with broken surface in coarse particles with a

particle size greater than 16 mm is not less than 30 %.

4.4 Properties of sub-ballast material

4.4.1 The Los Angeles abrasion ratio of aggregates with a particle size greater than

1.7 mm is not more than 50 %.

5 Inspection rules

Sub-ballast material shall be subjected to type inspection and production inspection.

The type inspection is a ministerial level, and the production inspection is a bureau

level.

5.1 Type inspection

5.2 Production inspection

5.2.2 According to the requirements of 4.2 to 4.4, the production organization carries

out an inspection when every 4 × 104 m3 of sub-ballast are produced. If the annual

output is less than 4 × 104 m3, the inspection shall be carried out once a year.

5.3 Test methods

5.3.1 The Los Angeles abrasion ratio test shall be in accordance with TB/T 2328.1.
5.3.2 The sodium sulfate solution soaking loss test shall be in accordance with TB/T

2328.10.

5.3.3 The liquid limit and plasticity index test shall be in accordance with TB/T 2328.8

and TB/T 2328.9.

5.3.4 The granular soil and other impurities content test shall be in accordance with

TB/T 2328.17.

6 Transportation, storage

6.1 In the stockpile site, it shall prevent the infiltration of clay, debris and dust, and

ensure that the sub-ballasts are clean. When shoveling, it shall prevent the shoveling

of soil.

TB/T 2897-1998

TB

PROFESSIONAL STANDARD OF

THE PEOPLE'S REPUBLIC OF CHINA

Sub-ballast for ballast bed of railways

Issued on. FEBRUARY 24, 1998

Implemented on. SEPTEMBER 1, 1998

Issued by. Ministry of Railways of the People's Republic of China

Table of Contents

Foreword... 3

1 Scope... 4

2 References... 4

3 Terms... 4

4 Technical requirements... 4

5 Inspection rules... 6

6 Transportation, storage... 8

Foreword

Sub-ballast is an important part of the ballast bed of railways and is located between

the ballast layer of the ballast bed and the surface layer of the subgrade bed. It plays

the role of transmitting and distributing the train loads, preventing mutual penetration

of top-ballast and surface layer particles of subgrade bed, water seepage transition

and antifreeze-and-insulation. In the past, China borrowed the experience of using

river sands as sub-ballast from the former Soviet Union. Since there is no material

standard, the above-mentioned functions of the sub-ballast cannot be guaranteed and

the material source of the sub-ballast is limited. On the basis of reference to the

relevant standards such as the sub-ballast material standards of the United States

Railway Engineering Association (AREA), Japan railway subgrade bed surface layer

(JISA5001 particle size transitional gravel layer) material standards, combining China's

national conditions and railway situation, this Standard is developed.

This Standard is proposed by Railway Engineering Research Institute of China

Academy of Railway Sciences.

This Standard is under the jurisdiction of Institute of Standard Metrology of National

Railway Administration of the People's Republic of China.

Railway Engineering Research Institute of China Academy of Railway Sciences is

responsible for the drafting of this Standard.

Main drafters of this Standard. Zeng Shugu, Zhang Wensheng, Xu Yongxian, Wang

Hong, Liu Zengjie.

Sub-ballast for ballast bed of railways

1 Scope

This Standard specifies the technical requirements, inspection rules and transportation,

storage of sub-ballast for ballast bed of railways (hereinafter referred to as sub-ballast).

This Standard applies to national railways; local railways and industrial enterprise

railways may also refer to this Standard.

2 References

The following standards contain provisions which, through reference in this text,

constitute provisions of this standard. At time of publication, the editions indicated were

valid. All standards are subject to revision, and parties to agreements based on this

standard are encouraged to investigate the possibility of applying the most recent

editions of the standards indicated below.

TB/T 2140-90 Railway ballast

TB/T 2328.1~18-92 Test method for railway ballast

3 Terms

The plasticity index Ip. the plasticity index is equal to the difference between the liquid

limit LL and the plastic limit PL.

4 Technical requirements

4.1 Sub-ballast material may be taken from natural gravel material, or may be taken

from rocks or natural pebbles, gravels by crushing, screening.

4.3 The mass percentage of particles with broken surface in coarse particles with a

particle size greater than 16 mm is not less than 30 %.

4.4 Properties of sub-ballast material

4.4.1 The Los Angeles abrasion ratio of aggregates with a particle size greater than

1.7 mm is not more than 50 %.

5 Inspection rules

Sub-ballast material shall be subjected to type inspection and production inspection.

The type inspection is a ministerial level, and the production inspection is a bureau

level.

5.1 Type inspection

5.2 Production inspection

5.2.2 According to the requirements of 4.2 to 4.4, the production organization carries

out an inspection when every 4 × 104 m3 of sub-ballast are produced. If the annual

output is less than 4 × 104 m3, the inspection shall be carried out once a year.

5.3 Test methods

5.3.1 The Los Angeles abrasion ratio test shall be in accordance with TB/T 2328.1.
5.3.2 The sodium sulfate solution soaking loss test shall be in accordance with TB/T

2328.10.

5.3.3 The liquid limit and plasticity index test shall be in accordance with TB/T 2328.8

and TB/T 2328.9.

5.3.4 The granular soil and other impurities content test shall be in accordance with

TB/T 2328.17.

6 Transportation, storage

6.1 In the stockpile site, it shall prevent the infiltration of clay, debris and dust, and

ensure that the sub-ballasts are clean. When shoveling, it shall prevent the shoveling

of soil.

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.

How to Download TB/T 2344.1-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
8 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB/T 2344.1-2020

$95.00