Valid

TB/T 2843-2007General technical specification for elastic parts for railways (English PDF)

机车车辆用橡胶弹性元件通用技术条件

Preview PDF

This is a limited preview

Buy now to download the full PDF (6 pages)

Need quotation for your management?

Get a formal quotation for TB/T 2843-2007 in 30 minutes.

Issued by

Ministry of Railways of the People's Republic of China

Level / Type

National · Recommended

Issue date

December 30, 2007

Implementation date

May 1, 2008

Scope

TB/T 2843-2007 is the English-translated version of 机车车辆用橡胶弹性元件通用技术条件.

TB/T 2843-2007 - This standard specifies the terms and definitions AND technical requirements for the axle counter application system. This standard is applicable to the automatic block, automatic inter-station block, and inter-station interlock system which are composed of the axle counter track inspection device.

It is the technical criterion for researching, designing, manufacturing and using.

Found what you need?

Document preview — TB/T 2843-2007

National Standard of the People's Republic of China

ICS
45.020; 93.100
Classification
S 63

Issued by: Ministry of Railways of the People's Republic of China

Contents

  • Foreword...3
  • 1 Scope...4
  • 2 Terms and definitions...4
  • 3 Technical requirements...6

Foreword

Appendix A of this standard is a normative appendix.

This standard was proposed by AND shall be under the jurisdiction of Beijing

All-Way Communication Signal Research and Design Institute.

1 Scope

This standard specifies the terms and definitions AND technical requirements

for the axle counter application system.

This standard is applicable to the automatic block, automatic inter-station block,

and inter-station interlock system which are composed of the axle counter track

inspection device. It is the technical criterion for researching, designing,

manufacturing and using.

2 Terms and definitions

The following terms and definitions apply to this standard.

2.1

Axle counter train detection device

It refers to the safety device which realizes the cleared and occupied

inspection of the track section through the arithmetic calculation of the

counting in and counting out axle number AND output of control conditions.

2.2

Axle application system

It refers to the application system which is composed of the axle counter train

detection device and the signal circuit.

2.3

Axle track section

It refers to the cleared track section as checked by the axle counter train

detection device.

2.4

Cleared

c) When the axle counter train detection device and the available inner-

station track circuit are combined to settle the issue that the low resistance

track bed circuit cannot be adjusted for once, the axle track relay and this

section track circuit relay can be connected in parallel;

d) When the axis track section is reset, it shall, after manually confirming that

this section has no train, adopt instant reset mode.

3.7 Automatic inter-station block of axle counting shall meet the following

requirements.

a) The axle counter train detection device completes the inter-section cleared

and occupied state inspection;

b) When the departure station handles the departure route, the inter-station

will automatically switch to the block state;

c) When the train arrives at the reception station or returns back to the

departure station, after confirming that the inter-section is cleared, it shall

automatically terminate the block state;

d) After the inter-section block and before the departure route is unlocked, it

shall not terminate block; after cancelling the departure route and the

departure route is unlocked, the block is automatically terminated

accordingly;

e) When the inter-section axle counter train detection device is reset, after

manually confirming that the inter-section is cleared by both stations,

BREAK the lead seal, AND both stations shall simultaneously operate the

instant reset button within 13 s;

f) The system shall make use of relevant inner-station interlocking conditions

and take other measures to realize the logic judgment function of

distinguishing normal traffic and external interference;

g) The system shall be powered by an uninterruptible power supply, which

shall, after an interruption of the AC power supply, guarantee the time

required by the normal operating train from departure to completely reach

to the reception station.

3.8 The automatic block axis application system shall meet the following

requirements.

a) The system shall have a large section axle counting detection function.

When the block section is in occupied state AND required for reset, it shall

5) The loop current is not less than 600 mA, to ensure reliable reception

of locomotive signals;

6) The loop shall be fixed reliably every 2 m;

7) The loop shall have locomotive signal code sending, code cutting,

disconnection, and short-circuit detection alarming and indication.

3.9 The communication transmission channel shall meet the following

requirements.

a) The inter-station and indoor-outdoor equipment communication

transmission channel of the axle counting system shall adopt the special

transmission line pair (optical cable or symmetrical cable).

b) The axle counting system shall continuously monitor its communication

transmission channel; when this channel has fault, the corresponding axle

track section shall be at occupied state, AND meanwhile indication is

provided.

3.10 It shall equip reliable power supply to ensure the uninterrupted normal

operation of the system.

3.11 The axle counting system shall have a fault alarm function; once fault

occurs, the corresponding axle track section shall be at occupied state, AND

meanwhile indication is provided.

3.12 The axle counting system shall have a standard interface, AND the

information can be included in micro-computer monitoring, computer

interlocking, TDCS (train dispatching command system), and CTC (centralized

traffic control).

3.13 The channels, equipment, power supply, etc., of the axle counting system

shall be configured with lightning protection facilities as specified. As for the

electrification section, the grounding shall be of through grounding line, with the

grounding resistance not more than 1ohm; as for the non-electrified section,

outdoor can adopt distributed grounding mode, with the grounding resistance

not more than 4ohm; under special conditions, it may use through grounding line,

with the grounding resistance not more than 1ohm.

3.14 It shall, at the entrance and exit of the section under the protection of the

axle counter train detection device, respectively install the wheel sensors, which

shall be on the same rail.

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 6 pages — is available in the English PDF.

Referenced standards

How to Download TB/T 2843-2007

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
6 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB/T 2843-2007

$95.00