TB/T 2211-2018Steel compression spring for rolling stock (English PDF)
机车车辆用压缩钢制螺旋弹簧
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for TB/T 2211-2018 in 30 minutes.
Issued by
National Railway Administration
Level / Type
National · Recommended
Issue date
December 25, 2018
Implementation date
July 1, 2019
Scope
TB/T 2211-2018 is the English-translated version of 机车车辆用压缩钢制螺旋弹簧.
TB/T 2211-2018 is the Chinese industry standard "Steel compression spring for rolling stock". It was issued on December 25, 2018 by the National Railway Administration, and took effect on July 1, 2019. It is in force and replaces TB/T 2211-2010.
Found what you need?
Document preview — TB/T 2211-2018
National Standard of the People's Republic of China
Issued by: National Railway Administration
Contents
- Document data
1 Document data
Sector: Railway (industry standard).
Issuing body: National Railway Administration.
Date of issue: 2018-12-25.
Date of implementation: 2019-07-01.
Status: valid, replaces TB/T 2211-2010.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Editions of TB/T 2211
| Edition | Title | Revision | Status |
|---|---|---|---|
| TB/T 2211-2018 | Steel compression spring for rolling stock | — | Valid |
| TB/T 2211-2010 | Steel helical spring of suspension mechanism for rolling stock | — | Obsolete |
| TB/T 2211-1991 | Locomotives cylindrical coil spring fatigue testing | — | Obsolete |
This page sells the current edition, TB/T 2211-2018. Earlier editions are listed for reference only.
How to Download TB/T 2211-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 2033-2026 — Rail vehicle - Rail flat car
TB/T 2075.24-2026 — Parts and components for overhead contact system in electrified railway - Part 24: Preformed fittings
TB/T 2809-2026 — Electrified railway catenary - Copper alloy catenary
TB/T 2211-2018
$210.00