SY/T — Petroleum & Gas

Found: 4575 — page 60 of 96

PDF

SY/T 5466-2004 — Before drilling engineering and well site layout technical requirements

National·Recommended
Superseded$315.00
PDF

SY/T 5524-2004 — Petroleum seismic exploration rig

National·Recommended
Superseded$165.00
PDF

SY/T 5536-2004 — The operation regulation of crude oil pipeline

National·Recommended
Superseded$210.00
PDF

SY/T 5587.11-2004 — Codes for conventional workover job. Part 11: Milling operation of packer and bridge plug

National·Recommended
Superseded$105.00
PDF

SY/T 5587.12-2004 — Codes for conventional workover job - Part 12: Fishing

National·Recommended
Superseded$165.00
PDF

SY/T 5587.14-2004 — Conventional workover procedures - Part 14: Note plug, drill plug

National·Recommended
Superseded$135.00
PDF

SY/T 5587.3-2004 — The conventional workover procedures - Part 3: oil and gas wells kill behalf spray induced flow

National·Recommended
Superseded$105.00
PDF

SY/T 5587.4-2004 — Codes for conventional workover job. Part 4: Finding and sealing of casing leak for cased wells

National·Recommended
Superseded$120.00
PDF

SY/T 5587.5-2004 — Codes for conventional workover job. Part 5: Preparation of well bore for downhole operation

National·Recommended
Superseded$180.00
PDF

SY/T 5590-2004 — Evaluation method for profile control agents properties

National·Recommended
Superseded$150.00
PDF

SY/T 5615-2004 — Drawing specification and pattern for oil and gas geology exploration

National·Recommended
Valid$2,619.00
PDF

SY/T 5704-2004 — Dipmeter scale

National·Recommended
Superseded$120.00
PDF

SY/T 5718-2004 — Writing specification of well testing report

National·Recommended
Superseded$240.00
PDF

SY/T 5726-2004 — Safety regulation for petroleum logging operation

National·Recommended
Superseded$105.00
PDF

SY/T 5749-2004 — Labor quota for installation engineering of oil and gas gathering and transferring process

National·Recommended
Superseded$495.00
PDF

SY/T 5771-2004 — Technical specification for ground magnetic exploration

National·Recommended
Superseded$240.00
PDF

SY/T 5904-2004 — Recommended practice for sizing and selection of electric submersible pump installation

National·Recommended
Superseded$195.00
15 pages

SY/T 5913-2004 — Rock thin section preparation

National·Recommended
Valid$135.00
PDF

SY/T 5918-2004 — Technical criteria for external coating rehabilitation of buried steel pipeline

National·Recommended
Superseded$270.00
PDF

SY/T 5945-2004 — The specification for well logging interpretation report writing norm

National·Recommended
Superseded$165.00
15 pages

SY/T 5954-2004 — Inspection items and requirements prior to spudding

National·Recommended
Valid$240.00
PDF

SY/T 5955-2004 — Trajectory quality for directional well

National·Recommended
Superseded$55.00
15 pages

SY/T 5956-2004 — Technical regulations of drill etring abandonment

National·Recommended
Valid$55.00
PDF

SY/T 6044-2004 — Emergency requirements of the safety of offshore oil operations

National·Recommended
Superseded$75.00
PDF

SY/T 6058-2004 — Operation procedures for lifting and laying down of self-electing mast

National·Recommended
Valid$374.00
PDF

SY/T 6103-2004 — Measurement of rock pore structure Method of image analysis

National·Recommended
Superseded$120.00
PDF

SY/T 6108-2004 — Technical specification of performance analysis for carbonate gas reservoir

National·Recommended
Superseded$180.00
PDF

SY/T 6176-2004 — Technical regulation of data collection on development well of gas reservoir

National·Recommended
Superseded$195.00
PDF

SY/T 6199-2004 — Drilling rig foundation specification

National·Recommended
Withdrawn$240.00
PDF

SY/T 6266-2004 — Low pressure fiberglass line pipe and fittings

National·Recommended
Superseded$360.00
PDF

SY/T 6269-2004 — Common terms of energy and water conservation in petroleum enterprises

National·Recommended
Superseded$135.00
PDF

SY/T 6332-2004 — Directional well trajectory control

National·Recommended
Superseded$70.00
PDF

SY/T 6408-2004 — Recommended practice for use and procedures for inspections, maintenance and repair of drilling and well servicing structures

National·Recommended
Superseded$650.00
55 pages

SY/T 6580-2004 — Quantities and units frequently used in oil and gas exploration and development

National·Recommended
Valid$800.00
PDF

SY/T 6589-2004 — Technical specification for long offset transient electromagnetic method

National·Recommended
Superseded$165.00
PDF

SY/T 6590-2004 — The checking items and technical specifications for IMAGE seismic data acquisition system

National·Recommended
Withdrawn$240.00
PDF

SY/T 6591-2004 — Technical specification for pre-stack depth migration processing of seismic data

National·Recommended
Withdrawn$240.00
PDF

SY/T 6592-2004 — Procedure for cement evaluation

National·Recommended
Superseded$435.00
PDF

SY/T 6593-2004 — The specification for nuclear magnetic resonance imaging logging tool calibration

National·Recommended
Superseded$135.00
PDF

SY/T 6594.1-2004 — Specification for operation and quality control of resistivity and acoustic imaging logging. Part 1: The calibration for logging tools

National·Recommended
Withdrawn$240.00
PDF

SY/T 6595-2004 — The oilfield Business assessment of technical requirements

National·Recommended
Superseded$90.00
PDF

SY/T 6596-2004 — Recommended practice for produced-water reinjection in gas field

National·Recommended
Superseded$85.00
PDF

SY/T 6597-2004 — Steel pipeline detection technology specification

National·Recommended
Superseded$85.00
8 pages

SY/T 6598-2004 — Recommended practice on application and testing of electric submersible pump seal chamber sections

National·Recommended
Valid$345.00
8 pages

SY/T 6599-2004 — Recommended practice for electric submersible pump testing

National·Recommended
Valid$150.00
PDF

SY/T 6600-2004 — Load bearable detective cable

National·Recommended
Superseded$240.00
PDF

SY/T 6601-2004 — CRA line pipe

National·Recommended
Superseded$875.00
PDF

SY/T 6602-2004 — Submarine cable seismic data acquisition system

National·Recommended
Withdrawn$240.00