SY/T 5587.3-2004The conventional workover procedures - Part 3: oil and gas wells kill behalf spray induced flow (English PDF)
常规修井作业规程 第3部分:油气井压井、替喷、诱喷
SY/T 5587.3 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SY/T 5587.3-2024 | Code of practice for conventional workover job - Part 3: Killing well, displaced flow and induced flow | Valid |
| SY/T 5587.3-2013 | Codes for Conventional Workover Job - Part 3: Killing Well, Displaced Flow and Induced Flow | Obsolete |
| SY/T 5587.3-2004 | The conventional workover procedures - Part 3: oil and gas wells kill behalf spray induced flow | Obsolete |
SY/T 5587.3-2004 is obsolete. It has been replaced by SY/T 5587.3-2013. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SY/T 5587.3-2004 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
July 3, 2004
Implementation date
November 1, 2004
Scope
SY/T 5587.3-2004 is the English-translated version of 常规修井作业规程 第3部分:油气井压井、替喷、诱喷.
SY/T 5587.3-2004 is the Chinese industry standard "The conventional workover procedures - Part 3: oil and gas wells kill behalf spray induced flow". It was issued on July 3, 2004 by the National Development and Reform Commission, and took effect on November 1, 2004. It is obsolete: it has been replaced by SY/T 5587.3-2013.
Found what you need?
Document preview — SY/T 5587.3-2004
National Standard of the People's Republic of China
Issued by: National Development and Reform Commission
Contents
- Document data
1 Document data
Sector: Petroleum & Gas (industry standard).
Issuing body: National Development and Reform Commission.
Date of issue: 2004-07-03.
Date of implementation: 2004-11-01.
Status: obsolete, replaced by SY/T 5587.3-2013.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Download SY/T 5587.3-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SY/T 5587.4-2004 — Codes for conventional workover job. Part 4: Finding and sealing of casing leak for cased wells
SY/T 5587.4-1993 — Conventional oil wells, workover operations. Production casing packer leak operating procedures
SY/T 5587.5-2018 — Codes for conventional workover job - Part 5: Wellbore preparation for downhole operation
Secure payment via Stripe
Payments accepted
SY/T 5587.3-2004
$105.00