DL/T — Electricity & Power

Found: 2930 — page 57 of 62

Valid

DL/T 259-2012 — Calibration regulation for SF6 gas density monitor

National·Recommended
Instant delivery (0–9 sec)
$125.0021 pages
Valid

DL/T 437-2012 — Technical guide of HVDC earth electrode system

National·Recommended
Instant delivery (0–9 sec)
$165.0016 pages
Valid

DL/T 5218-2012 — Technical code for the design of 220kV ~ 750kV substation

National·Recommended
Instant delivery (0–9 sec)
$580.00PDF
Valid

DL/T 627-2012 — Room temperature vulcanized silicon rubber anti-pollution coating for insulators

National·Recommended
Instant delivery (0–9 sec)
$125.0022 pages
Valid

DL/T 646-2012 — Manufacturing technical requirements for steel tubular structures of substation and transmission line

National·Recommended
Instant delivery (0–9 sec)
$135.0042 pages
Valid

DL/T 681-2012 — Specification for wear-resistant parts of coal mill in coal-fired power plants �� Part 1: Ball grinding mill, grinding balls and liner

National·Recommended
Instant delivery (0–9 sec)
$135.0018 pages
Valid

DL/T 293-2011 — Code of operation for reversible pump-turbine of pumped-storage

National·Recommended
Instant delivery (0–9 sec)
$165.0012 pages
Valid

DL/T 294.1-2011 — Specification for equipment of de-excitation and over voltage protection for generators. Part 1: Field circuit breaker

National·Recommended
Instant delivery (0–9 sec)
$90.009 pages
Valid

DL/T 299-2011 — Application specification for speed control device on inner-feeding motor driving fan or pump in fossil-fired power plant

National·Recommended
Instant delivery (0–9 sec)
$195.0012 pages
Valid

DL/T 301-2011 — Analytical method of steam and water in power plant. Determination of trace cations by ion chromatography

National·Recommended
Instant delivery (0–9 sec)
$70.008 pages
Valid

DL/T 302.1-2011 — Equipment maintenance analysis guideline for power plant. Part 1: Reliability centered maintenance (RCM) analysis

National·Recommended
Instant delivery (0–9 sec)
$105.007 pages
Valid

DL/T 302.2-2011 — Equipment maintenance analysis guideline for power plant. Part 2: Risk-based maintenance (RBM) analysis

National·Recommended
Instant delivery (0–9 sec)
$105.007 pages
Valid

DL/T 5099-2011 — Technical specification for excavation of underground works on hydraulic structure

National·Recommended
Instant delivery (0–9 sec)
$1,100.0069 pages
Valid

DL/T 5264-2011 — Construction Guideline for Roller Compacted Concrete in Lean Cemented Dregs and Gravel

National·Recommended
Instant delivery (0–9 sec)
$610.0021 pages
Valid

DL/T 5265-2011 — Operation code of safety for concrete mixing plant of hydropower and water resources

National·Recommended
Instant delivery (0–9 sec)
$345.0023 pages
Valid

DL/T 5266-2011 — Safety rules of operation for cable crane of hydropower and water engineering

National·Recommended
Instant delivery (0–9 sec)
$375.0024 pages
Valid

DL/T 1080.3-2010 — Application integration at electric utilities. System interfacees for distribution management. Part 3: Interface for network operations

National·Recommended
Instant delivery (0–9 sec)
$265.0019 pages
Valid

DL/T 1080.4-2010 — Application integration at electric utilities. System interfaces for distribution management. Part 4: Interfaces for records and asset management

National·Recommended
Instant delivery (0–9 sec)
$285.0033 pages
Valid

DL/T 306.1-2010 — Code of operation for AC 1000kV substation. Part 1: Equipment

National·Recommended
Instant delivery (0–9 sec)
$55.005 pages
Valid

DL/T 306.2-2010 — Code of operation for AC 1000kV substation. Part 2: Operating

National·Recommended
Instant delivery (0–9 sec)
$165.0011 pages
Valid

DL/T 306.3-2010 — Code of operation for AC 1000kV substation. Part 3: Inspecting

National·Recommended
Instant delivery (0–9 sec)
$105.008 pages
Valid

DL/T 306.4-2010 — Code of operation for AC 1000kV substation. Part 4: Hangling of equipment failure

National·Recommended
Instant delivery (0–9 sec)
$135.009 pages
Valid

DL/T 306.5-2010 — Code of operation for AC 1000kV substation. Part 5: Typical operation

National·Recommended
Instant delivery (0–9 sec)
$115.004 pages
Valid

DL/T 306.6-2010 — Code of operation for AC 1000kV substation. Part 6: Diagram

National·Recommended
Instant delivery (0–9 sec)
$169.006 pages
Valid

DL/T 310-2010 — Guide for AC 1000kV oil-immersed transformer and shunt reactor maintenance

National·Recommended
Instant delivery (0–9 sec)
$165.0012 pages
Valid

DL/T 314-2010 — General specifications for power system under-voltage load-shedding and separation equipment

National·Recommended
Instant delivery (0–9 sec)
$135.0010 pages
Valid

DL/T 315-2010 — General specifications for power system under-frequency load-shedding and separation equipment

National·Recommended
Instant delivery (0–9 sec)
$135.0010 pages
Valid

DL/T 316-2010 — Specification for hydropower dispatching automation in power grid

National·Recommended
Instant delivery (0–9 sec)
$165.0012 pages
Valid

DL/T 323-2010 — Measurement method for activity of quicklime used in dry flue gas desulfurization

National·Recommended
Instant delivery (0–9 sec)
$120.005 pages
Valid

DL/T 325-2010 — Technical specifications for occupational health surveillance in electric power industry

National·Recommended
Instant delivery (0–9 sec)
$525.0028 pages
Valid

DL/T 329-2010 — Communications interfaces based on DL/T 860 for low-voltage power supply equipment used in substation

National·Recommended
Instant delivery (0–9 sec)
$525.0029 pages
Valid

DL/T 331-2010 — Guide of the key parameter coordination for planning and design of generator and power network

National·Recommended
Instant delivery (0–9 sec)
$85.009 pages
Valid

DL/T 332.1-2010 — Guide for operation of tower type boiler supercritical units. Part 1: Guide for operation of boiler

National·Recommended
Instant delivery (0–9 sec)
$800.0039 pages
Valid

DL/T 332.2-2010 — Guide for operation of tower type boiler supercritical units. Part 2: Guide for operation of steam turbine

National·Recommended
Instant delivery (0–9 sec)
$355.0021 pages
Valid

DL/T 332.3-2010 — Guide for operation of tower type boiler supercritical units. Part 3: Guide for operation of chemical

National·Recommended
Instant delivery (0–9 sec)
$225.0013 pages
Valid

DL/T 335-2010 — Operation specification for SCR flue gas denitrification system in fossil-fuel power plant

National·Recommended
Instant delivery (0–9 sec)
$375.0021 pages
Valid

DL/T 336-2010 — Test and evaluating methods for quartz sand as filtration medium

National·Recommended
Instant delivery (0–9 sec)
$55.007 pages
Valid

DL/T 337-2010 — Coal feeder fault diagnosis and automatic loosening device for coal silo

National·Recommended
Instant delivery (0–9 sec)
$195.007 pages
Valid

DL/T 338-2010 — Technical supervision guide for control system of steam turbine in grid

National·Recommended
Instant delivery (0–9 sec)
$135.0012 pages
Valid

DL/T 339-2010 — Specification for low voltage speed control device with variable frequency

National·Recommended
Instant delivery (0–9 sec)
$225.0013 pages
Valid

DL/T 342-2010 — Joint installing code of cross-linked polyethylene power cable for rated voltages from 66kV to 220kV

National·Recommended
Instant delivery (0–9 sec)
$70.007 pages
Valid

DL/T 343-2010 — GIS termination installing code of cross-linked polyethylene power cable for rated voltages from 66kV to 220kV

National·Recommended
Instant delivery (0–9 sec)
$85.009 pages
Valid

DL/T 344-2010 — Outdoor termination installing code of cross-linked polyethylene power cable for rated voltages from 66kV to 220kV

National·Recommended
Instant delivery (0–9 sec)
$70.007 pages
Valid

DL/T 350-2010 — The guide for the converter station operation regulation

National·Recommended
Instant delivery (0–9 sec)
$105.009 pages
Valid

DL/T 356-2010 — Calibration specification of partial discharge measuring devices

National·Recommended
Instant delivery (0–9 sec)
$255.0014 pages
Valid

DL/T 358-2010 — Code of construction and acceptance for 7.2kV to 12kV outdoor prefabricated switch stations

National·Recommended
Instant delivery (0–9 sec)
$165.008 pages
Valid

DL/T 359-2010 — Field testing criterion of electric thermal storage and heat pump system

National·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

DL/T 360-2010 — Code of operation and maintenance for 7.2 kV to 12 kV outdoor prefabricated switch stations

National·Recommended
Instant delivery (0–9 sec)
$165.0011 pages