DL/T 332.1-2010Guide for operation of tower type boiler supercritical units. Part 1: Guide for operation of boiler (English PDF)
This is a limited preview
Buy now to download the full PDF (39 pages)
Need quotation for your management?
Get a formal quotation for DL/T 332.1-2010 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
January 9, 2011
Implementation date
May 1, 2011
Scope
DL/T 332.1-2010 (Guide for operation of tower type boiler supercritical units. Part 1: Guide for operation of boiler) is available as an English-translated PDF.
DL/T 332.1-2010 — This standard specifies the supercritical units in service tower and main auxiliary equipment for boiler start, run, stop, maintenance, accident analysis and processing principles and technical guidelines.
This standard applies to tower super/ultra-supercritical unit boiler operation guidance, hereinafter referred to as supercritical boilers.
Found what you need?
Document preview — DL/T 332.1-2010
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- F 23
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the supercritical units in service tower and main auxiliary equipment for boiler start, run, stop, maintenance, accident analysis and processing principles and technical guidelines. This standard applies to tower super/ultra-supercritical unit boiler operation guidance, hereinafter referred to as supercritical boilers. Boiler manufacturers have special provisions, shall be provided by the manufacturer requirements and is based on technical data.
Document data
International classification (ICS): 27.100.
Chinese classification (CCS): F23.
Estimated length of the Chinese original: 58,511 words.
Standards quoted by this document
GB/T 16507; DL 435-2004; DL 612-1996; DL/T 852-2004; DL/T 956-2005
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 39 pages — is available in the English PDF.
How to Download DL/T 332.1-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 332.2-2010 — Guide for operation of tower type boiler supercritical units. Part 2: Guide for operation of steam turbine
DL/T 332.3-2010 — Guide for operation of tower type boiler supercritical units. Part 3: Guide for operation of chemical
DL/T 1210-2025 — Code for Testing and Acceptance of Automatic Generation Control Performance of Thermal Power Plant
Secure payment via Stripe
Payments accepted
DL/T 332.1-2010
$1,414.00