DL/T 293-2011Code of operation for reversible pump-turbine of pumped-storage (English PDF)
This is a limited preview
Buy now to download the full PDF (12 pages)
Need quotation for your management?
Get a formal quotation for DL/T 293-2011 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
July 28, 2011
Implementation date
November 1, 2011
Scope
DL/T 293-2011 (Code of operation for reversible pump-turbine of pumped-storage) is available as an English-translated PDF.
DL/T 293-2011 — This standard specifies the pump turbine operating conditions and conditions change, run the basic technical conditions, operation, inspection checks, operation monitoring, operation analysis, abnormal operation and accident handling the basic requirements.
This standard applies to stand-alone power 150MW and above single-stage reversible Francis pump turbine.
Found what you need?
Document preview — DL/T 293-2011
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- F 23
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the pump turbine operating conditions and conditions change, run the basic technical conditions, operation, inspection checks, operation monitoring, operation analysis, abnormal operation and accident handling the basic requirements. This standard applies to stand-alone power 150MW and above single-stage reversible Francis pump turbine. Stand-alone power less than 150MW, and other types of pump turbine may refer to.
Document data
International classification (ICS): 27.140.
Chinese classification (CCS): F23.
Estimated length of the Chinese original: 18,151 words.
Standards quoted by this document
GB/T 6075.5; GB/T 11348.5; GB/T 15469.2; GB/T 17189
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.
How to Download DL/T 293-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1210-2025 — Code for Testing and Acceptance of Automatic Generation Control Performance of Thermal Power Plant
DL/T 1332-2025 — Guidelines for on-site low-frequency test of excitation characteristic of the current transformer
DL/T 2875.1-2025 — Technical specification for dust suppression of coal transportation equipment in thermal power plants - Part 1: General provisions
Secure payment via Stripe
Payments accepted
DL/T 293-2011
$454.00