RB/T 113-2023Energy management system - Requirements for certification on chlor-alkali and carbide plants (English PDF)
This is a limited preview
Buy now to download the full PDF (20 pages)
Need quotation for your management?
Get a formal quotation for RB/T 113-2023 in 30 minutes.
Issued by
National Certification and Accreditation Administration
Level / Type
National · Recommended
Issue date
October 16, 2023
Implementation date
December 1, 2023
Scope
RB/T 113-2023 (Energy management system - Requirements for certification on chlor-alkali and carbide plants) is available as an English-translated PDF.
RB/T 113-2023 — This document specifies the energy management system requirements for chlor-alkali and calcium carbide companies: This document is applicable to chlor-alkali and calcium carbide enterprises to establish, implement, maintain and continuously improve their energy management system, and also applies to fertilizer and methyl methacrylate enterprises to establish, implement, maintain and continuously improve their energy management system: Energy management system certification for methanol enterprises: Reference for other stakeholders to evaluate the energy management system of fertilizer and methanol enterprises:
Found what you need?
Document preview — RB/T 113-2023
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F 01
- Replacing
- RB/T 113-2014
Issued by: National Certification and Accreditation Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 The environment in which the enterprise is located
- 5 Leadership
- 6 Planning
- 7 Support
- 8 Run
- 9 Performance Evaluation
- 10 Improvement
- Appendix A (Informative) Basic Information on Energy Management in Chlor-Alkali and Calcium Carbide Enterprises
- Appendix B (Informative) List of laws, regulations, standards and other requirements for energy management in chlor-alkali and calcium carbide enterprises
- Appendix C (Informative) Example of Application of Energy Management System Requirements for Chlor-Alkali and Calcium Carbide Enterprises --- Energy Review
- Reference
- Figure A:1 Schematic diagram of the ion membrane caustic soda production process
- Figure A:2 Schematic diagram of polyvinyl chloride production process
- Figure A:3 Schematic diagram of the production process of calcium carbide by electrothermal method
- Table B:1 Commonly used laws, regulations and other requirements for energy management in chlor-alkali and calcium carbide enterprises
- Table B:2 Main standard catalogues for energy management in chlor-alkali and calcium carbide enterprises
- Table C:1 2020 Enterprise Energy Consumption Statistics Table
- Table C:2 Proportion of energy consumption types in major energy-consuming regions in
- Table C:3 Main energy-consuming equipment
- Table C:4 Economic operation control range of caustic soda and PVC
- Table C:5 Comprehensive energy consumption per unit of major products in:201921
- Table C:6 Comprehensive energy consumption per unit of major products in
- Table C:7 Statistical summary of energy metering equipment configuration
- Table C:8 PVC Company's 90kW and above obsolete motors account book summary
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting:
This document is the specific requirements for the application of GB/T 23331-2020 "Energy Management System Requirements and Use Guidelines" in chlor-alkali and calcium carbide enterprises:
This is a refinement of GB/T 23331-2020:
This document replaces RB/T 113-2014 "Energy Management System Certification Requirements for Chlor-Alkali and Calcium Carbide Enterprises" and Compared with RB/T 113-2014, in addition to structural adjustments and editorial changes, the main technical changes are as follows:
a) The structure, core technical elements, common terms and definitions of GB/T 23331-2020 are adopted;
b) Added the environment in which the enterprise is located (see 4.1);
c) Management representative has been deleted (see 4.2:2 of the:2014 edition);
d) added measures to address risks and opportunities (see 6.1);
e) Added planning for energy data collection (see 6.6);
f) Added improvements (see 10.3);
g) The scope of the management system has been changed (see 4.3, 4:1:2 of the:2014 edition);
h) Changed the energy review (see 6.3, 4:4:3 of the:2014 edition);
i) The energy performance parameters have been changed (see 6.4, 4:4:5 of the:2014 edition);
j) Changed the energy benchmark (see 6.5, 4:4:4 of the:2014 edition);
k) Changes have been made to operational planning and control (see 8.1, 8:2, 8:3, and 4:5:5, 4:5:6, and 4:5:7 of the:2014 edition):
1 Scope
This document specifies the energy management system requirements for chlor-alkali and calcium carbide companies:
This document is applicable to chlor-alkali and calcium carbide enterprises to establish, implement, maintain and continuously improve their energy management system, and also applies to fertilizer and methyl methacrylate enterprises to establish, implement, maintain and continuously improve their energy management system:
Energy management system certification for methanol enterprises: Reference for other stakeholders to evaluate the energy management system of fertilizer and methanol enterprises:
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document:
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document:
GB 17167 General rules for the allocation and management of energy metering instruments in energy-consuming units GB 21257 Limits of energy consumption per unit product of caustic soda GB 21343 Energy consumption limit per unit product of calcium carbide GB/T 21367 Requirements for the allocation and management of energy metering instruments in chemical enterprises GB/T 23331-2020 Energy Management System Requirements and Usage Guide GB 30527 Energy consumption limit per unit product of polyvinyl chloride resin
3 Terms and definitions
The terms and definitions defined in GB/T 23331-2020, GB 21257, GB 21343 and GB 30527 apply to this document:
4: The environment in which the enterprise is located
4.1 Understanding the enterprise and its environment
4.1.1 Enterprises should comply with the requirements of 4:1 of GB/T 23331-2020:
4.1.2 The enterprise shall identify the internal and external factors (positive or negative) that affect its energy performance and energy management system, such as the following factors:
a) External factors include:
---National, local, industry, and superior unit goals, requirements, or standards, such as: energy control indicators issued by the competent authorities, unit Product energy consumption limit standards, elimination of outdated processes and high-energy-consuming equipment, etc:;
--- The cost or availability of the main energy sources used, the use of renewable energy, etc:;
--- Environmental and climatic factors, such as high temperature, sudden weather, etc:;
---Others: Such as the impact of global greenhouse gases, carbon emissions trading, carbon peak, carbon neutrality, etc:
b) Internal factors include:
---Mission, vision and development strategy;
---Human resources, finance, energy costs, etc:;
---The degree of perfection of the energy management system;
--- Emergency plans to deal with energy supply disruptions;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 17167General rules for energy measuring instrument equipping and managing of energy user
- GB 21257Norm of energy consumption per unit production of caustic soda, PVC, methane chloride
- GB 21343The norm of energy consumption per unit production of calcium carbide, vinyl acetate, polyvinyl alcohol, 1,4-butanediol, dicyandiamide and monocyandiamide
- GB/T 21367Specification for equipping and managing of the measuring instrument of energy in chemical enterprise
- GB/T 23331-2020Energy management system requirements and guidelines
- GB 30527The norm of energy consumption per unit product of polyvinyl chloride resin
How to Download RB/T 113-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 17167-2025 — General rules for energy measuring instrument equipping and managing of energy user
GB 21257-2024 — Norm of energy consumption per unit production of caustic soda, PVC, methane chloride
GB 21343-2015 — Norm of Energy Consumption per Unit Products of Calcium Carbide
Secure payment via Stripe
Payments accepted
RB/T 113-2023
$574.00