DL/T Standards

Found: 2904 — page 40 of 61

Valid

DL/T 846.5-2018 — General technical specifications of high voltage test equipment -- Part 5: Analyzer for humidity in SF6 gas

National·Recommended
Instant delivery (0–9 sec)
$200.008 pages
Valid

DL/T 846.6-2018 — High-voltage test equipment - General technical conditions - Part 6: sulphur hexafluoride gas leak detector

National·Recommended
Instant delivery (0–9 sec)
$240.009 pages
Valid

DL/T 848.2-2018 — General technical specification of high voltage test device - Part 2: Power frequency high voltage test device

National·Recommended
Instant delivery (0–9 sec)
$285.0012 pages
Valid

DL/T 856-2018 — DC power supply for power and integrated power monitoring device

National·Recommended
Instant delivery (0–9 sec)
$530.0029 pages
Valid

DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing

National·Recommended
Instant delivery (0–9 sec)
$1,500.0045 pages
Valid

DL/T 860.4-2018 — Power automation communication networks and systems - Part 4: Systems and project management

National·Recommended
Instant delivery (0–9 sec)
$420.0017 pages
Valid

DL/T 860.904-2018 — Power automation communication networks and systems - Part 90-4: Network engineering guide

National·Recommended
Instant delivery (0–9 sec)
$3,635.00151 pages
Valid

DL/T 890.452-2018 — Energy Management System Application Programming Interface (EMS-API) Part 452: CIM Steady-State Transmission Network Model Subset

National·Recommended
Instant delivery (0–9 sec)
$1,400.0045 pages
Valid

DL/T 890.453-2018 — Energy Management System Application Programming Interface (EMS-API) Part 453: Graphical Layout

National·Recommended
Instant delivery (0–9 sec)
$330.0015 pages
Valid

DL/T 894-2018 — Guide of commissioning for ash and slag handling system in power plant

National·Recommended
Instant delivery (0–9 sec)
$295.0011 pages
Valid

DL/T 929-2018 — Determination of the structural group analysis in insulating oil and lubricating oil by infrared spectrum method

National·Recommended
Instant delivery (0–9 sec)
$120.004 pages
Valid

DL/T 930-2018 — Technical Guidelines for Ultrasonic Testing of Steam Turbine Rotors for Forging

National·Recommended
Instant delivery (0–9 sec)
$265.009 pages
Valid

DL/T 953-2018 — Determination of thermostability and anti-oxidation stability of strongly basic anion exchange resins for water treatment

National·Recommended
Instant delivery (0–9 sec)
$135.004 pages
Valid

DL/T 974-2018 — Depot of tools for live-working

National·Recommended
Instant delivery (0–9 sec)
$210.007 pages
Valid

DL/T 978-2018 — Specification for gas-insulated metal-enclosed transmission line

National·Recommended
Instant delivery (0–9 sec)
$500.0032 pages
Valid

DL/T 984-2018 — Oil-immersed transformer insulation aging judgment guideline

National·Recommended
Instant delivery (0–9 sec)
$455.0021 pages
Valid

DL/T 1053-2017 — Technical supervision code for power quality

National·Recommended
Instant delivery (0–9 sec)
$205.009 pages
Valid

DL/T 1076-2017 — Guideline for the commissioning of chemistry systems in power plants

National·Recommended
Instant delivery (0–9 sec)
$845.0026 pages
Valid

DL/T 1126-2017 — Technical guide for live working on overhead transmission line with multiple circuits on one tower

National·Recommended
Instant delivery (0–9 sec)
$175.007 pages
Valid

DL/T 1683-2017 — Guide of operating for 1000MW grade supercritical unit

National·Recommended
Instant delivery (0–9 sec)
$1,565.0070 pages
Valid

DL/T 1684-2017 — Guide for condition based maintenance strategy of oil-immersed power transformers(reactors)

National·Recommended
Instant delivery (0–9 sec)
$235.0011 pages
Valid

DL/T 1685-2017 — Guide for condition evaluation of oil-immersed power transformers (reactors)

National·Recommended
Instant delivery (0–9 sec)
$395.0015 pages
Valid

DL/T 1686-2017 — Guide for condition based maintenance strategy of SF6 high voltage circuit breaker

National·Recommended
Instant delivery (0–9 sec)
$479.0017 pages
Valid

DL/T 1687-2017 — Guide for condition evaluation of SF6 high voltage circuit breaker

National·Recommended
Instant delivery (0–9 sec)
$499.0017 pages
Valid

DL/T 1688-2017 — Guide for condition evaluation of gas insulated switchgear

National·Recommended
Instant delivery (0–9 sec)
$415.0019 pages
Valid

DL/T 1689-2017 — Guide for condition based maintenance strategy of gas insulated switchgear

National·Recommended
Instant delivery (0–9 sec)
$295.0015 pages
Valid

DL/T 1690-2017 — Guide for condition evaluation of current transformers

National·Recommended
Instant delivery (0–9 sec)
$185.007 pages
Valid

DL/T 1691-2017 — Guide for condition based maintenance strategy of current transformer

National·Recommended
Instant delivery (0–9 sec)
$240.007 pages
Valid

DL/T 1694.1-2017 — Calibration specification for high voltage testing instruments -- Part 1: Ultra-high frequency partial discharge online detector

National·Recommended
Instant delivery (0–9 sec)
$265.0011 pages
Valid

DL/T 1694.3-2017 — Calibration specification for high voltage testing instruments -- Part 3: High voltage switch operating characteristics tester

National·Recommended
Instant delivery (0–9 sec)
$235.0011 pages
Valid

DL/T 1694.4-2017 — Calibration specification for high voltage testing instruments. Part 4: Insulation oil voltage withstanding tester

National·Recommended
Instant delivery (0–9 sec)
$305.0010 pages
Valid

DL/T 1694.5-2017 — Calibration suecification for high voltage testing instruments. Part 5: Resistive current testers for zinc oxide surge arrester

National·Recommended
Instant delivery (0–9 sec)
$325.0011 pages
Valid

DL/T 1695-2017 — Guide for flue gas denitration commissioning test in thermal power plants

National·Recommended
Instant delivery (0–9 sec)
$405.0020 pages
Valid

DL/T 1696-2017 — Guide for the commissioning test of limestone-gypsum wet flue gas desulphurization

National·Recommended
Instant delivery (0–9 sec)
$535.0025 pages
Valid

DL/T 1698-2017 — Start-up test code for heat recovery steam generator of gas-steam combined cycle unit

National·Recommended
Instant delivery (0–9 sec)
$355.0013 pages
Valid

DL/T 1699-2017 — Installation acceptance code for heat recovery steam generator of gas-steam combined cycle unit

National·Recommended
Instant delivery (0–9 sec)
$590.0023 pages
Valid

DL/T 1700-2017 — Guide for condition based maintenance strategy of disconnector and earthing switch

National·Recommended
Instant delivery (0–9 sec)
$345.0011 pages
Valid

DL/T 1701-2017 — Guide for condition evaluation of disconnector and earthing switch

National·Recommended
Instant delivery (0–9 sec)
$325.0012 pages
Valid

DL/T 1702-2017 — Guide for condition based maintenance of metal oxide surge arresters

National·Recommended
Instant delivery (0–9 sec)
$145.007 pages
Valid

DL/T 1703-2017 — Guide for condition evaluation of metal oxide arrester

National·Recommended
Instant delivery (0–9 sec)
$195.009 pages
Valid

DL/T 1704-2017 — Performance test method for limestone slurry making system with desulphurization wet ball mill

National·Recommended
Instant delivery (0–9 sec)
$135.007 pages
Valid

DL/T 1705-2017 — Phosphate ester fire-resistant -- Determination of ageing-closed cup method

National·Recommended
Instant delivery (0–9 sec)
$95.004 pages
Valid

DL/T 1706-2017 — Quality of ultra-high voltage DC converter transformer oil in service

National·Recommended
Instant delivery (0–9 sec)
$95.004 pages
Valid

DL/T 1707-2017 — Guide on automatic voltage control for power grid

National·Recommended
Instant delivery (0–9 sec)
$135.007 pages
Valid

DL/T 1709.10-2017 — Smart grid dispatching and control system specification. Part 10: Hardware device testing

National·Recommended
Instant delivery (0–9 sec)
$405.0015 pages
Valid

DL/T 1709.3-2017 — Smart grid dispatching and control system specification— - Part 3:Foundation platform

National·Recommended
Instant delivery (0–9 sec)
$265.0012 pages
Valid

DL/T 1709.5-2017 — Smart grid dispatching and control system specification - Part 5: Scheduling

National·Recommended
Instant delivery (0–9 sec)
$395.0014 pages
Valid

DL/T 1709.6-2017 — Smart grid dispatching and control system specification Part 6: Dispatching management

National·Recommended
Instant delivery (0–9 sec)
$155.007 pages