DL/T 1699-2017Installation acceptance code for heat recovery steam generator of gas-steam combined cycle unit (English PDF)
This is a limited preview
Buy now to download the full PDF (23 pages)
Need quotation for your management?
Get a formal quotation for DL/T 1699-2017 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
March 28, 2017
Implementation date
August 1, 2017
Scope
DL/T 1699-2017 (Installation acceptance code for heat recovery steam generator of gas-steam combined cycle unit) is available as an English-translated PDF.
DL/T 1699-2017 — This standard specifies the essentials and technical requirements for the installation and acceptance of the gas-steam combined cycle unit waste heat boiler (abbreviated as the waste heat boiler).
This standard is applicable to gas turbine waste heat boilers with gas turbine ISO operating conditions with a simple cycle output of 15MW to 300MW.
Found what you need?
Document preview — DL/T 1699-2017
National Standard of the People's Republic of China
- ICS
- 270.100
- Classification
- F 22
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the essentials and technical requirements for the installation and acceptance of the gas-steam combined cycle unit waste heat boiler (abbreviated as the waste heat boiler). This standard is applicable to gas turbine waste heat boilers with gas turbine ISO operating conditions with a simple cycle output of 15MW to 300MW. The other capacity gas turbine heat recovery boiler can refer to the implementation.
Document data
International classification (ICS): 270.100.
Chinese classification (CCS): F22.
Estimated length of the Chinese original: 35,360 words.
Standards quoted by this document
GB 50026; GB 50204; GB 50205; GB 50231; GB 50275; GB 50278; DL 612; DL 647; DL/T 678; DL/T 794; DL 855; DL/T 869; DL/T 889; DL/T 1113; DL/T 5072; DL 5190.2-2012; DL 5190.3; DL 5190.4; DL 5190.5; DL 5190.6; DL 5190.7-2012; DL/T 5210.2-2009; DL/T 5210.5-200
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 23 pages — is available in the English PDF.
How to Download DL/T 1699-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1210-2025 — Code for Testing and Acceptance of Automatic Generation Control Performance of Thermal Power Plant
DL/T 1332-2025 — Guidelines for on-site low-frequency test of excitation characteristic of the current transformer
DL/T 2875.1-2025 — Technical specification for dust suppression of coal transportation equipment in thermal power plants - Part 1: General provisions
Secure payment via Stripe
Payments accepted
DL/T 1699-2017
$794.00