DL/T 894-2018Guide of commissioning for ash and slag handling system in power plant (English PDF)
除灰除渣系统调试导则
This is a limited preview
Buy now to download the full PDF (11 pages)
Need quotation for your management?
Get a formal quotation for DL/T 894-2018 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
April 3, 2018
Implementation date
July 1, 2018
Scope
DL/T 894-2018 is the English-translated version of 除灰除渣系统调试导则.
DL/T 894-2018 — This standard specifies the content and method of debugging the ash removal and slag removal system of coal-fired power plants. This standard applies to coal-fired power plants with a rated capacity of 125 MW and above.
Found what you need?
Document preview — DL/T 894-2018
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- F 23
- Replacing
- DL/T 894-2004
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the content and method of debugging the ash removal and slag removal system of coal-fired power plants. This standard applies to coal-fired power plants with a rated capacity of 125 MW and above. Coal-fired power plants with a rated capacity of 125 MW or less can be referred to.
Document data
International classification (ICS): 27.100.
Chinese classification (CCS): F23.
Estimated length of the Chinese original: 17,131 words.
Supersedes the earlier edition DL/T 894-2004.
Standards quoted by this document
DL/T 748.7; DL/T 748.9; DL/T 749; DL/T 775; DL/T 895; DL/T 906; DL/T 909; DL/T 910; DL/T 1165; DL/T 5142; DL/T 5294-2013; DL/T 5295; DL/T 5437
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
How to Download DL/T 894-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1010.3-2025 — High voltage static reactive power compensation devices - Part 3: Control and protection system
DL/T 1078-2025 — Test specification for operating performance of surface condenser
DL/T 1081-2025 — Operating code for 12kV~40.5kV outdoor high voltage switchgear
Secure payment via Stripe
Payments accepted
DL/T 894-2018
$295.00