NB/T 51015-2014 is the English-translated version of 煤炭设备工程监理规范.

NB/T 51015-2014 sets out how engineering supervision is carried out on coal industry equipment works in China - the independent oversight of equipment procurement, manufacture, delivery, installation, commissioning and handover on coal mine and coal preparation projects. It defines the supervision organisation and the qualifications and duties of the chief supervising engineer and their staff, the supervision plan and the detailed supervision rules that flow from it, and the working procedures the supervisor follows on site. The core of the document is the control the supervisor exercises: review of the manufacturer and of the design and technical documents, witnessing and hold points during manufacture, factory acceptance, inspection on arrival, control of the installation sequence and of the quality of each stage, control of progress and cost, safety and environmental supervision, handling of design changes and of non-conformities, witnessing of no-load and load commissioning, and the acceptance and handover of the equipment. It also fixes the paperwork - supervision logs, inspection records, instructions and notices, monthly reports, and the supervision summary that closes the assignment - and the way that record is filed and handed over. Note that the English title printed on the cover of this edition reads Coal Plant Engineering Consulting Service Specification, which does not match the Chinese: the Chinese says equipment engineering supervision, and that is what the document contains.

Document preview — NB/T 51015-2014

National Standard of the People's Republic of China

ICS
73.020
Classification
P 00/09

Issued by: National Energy Administration of the PRC

Contents

  • 1 General provisions1
  • 2 Terms2
  • 3 Supervision organization and personnel5
  • 3.1 Supervision entity5
  • 3.2 Project supervision organization5
  • 3.3 Supervision personnel6
  • 3.4 Duties of supervision personnel6
  • 4 Supervision plan and detailed rules for implementation9
  • 4.1 Supervision plan9
  • 4.2 Detailed rules for supervision implementation10
  • 5 General requirements for supervision work11
  • 5.1 Basis of supervision work11
  • 5.2 Contract management11
  • 5.3 Information management11
  • 5.4 Organization and coordination12
  • 6 Supervision at the equipment design stage14
  • 6.1 General requirements14
  • 6.2 Scope of supervision14
  • 6.3 Quality control14
  • 6.4 Progress control16
  • 6.5 Investment control16
  • 7 Supervision services at the equipment procurement stage17
  • 7.1 Scope of supervision services17
  • 7.2 Contents of equipment procurement supervision services17
  • 8 Supervision at the equipment manufacturing stage19
  • 8.1 General requirements19
  • 8.2 Scope of supervision19
  • 8.3 Working procedure19
  • 8.4 Quality control20
  • 8.5 Progress control26
  • 8.6 Cost control27
  • 8.7 Supervision records27
  • 9 Supervision at the equipment installation and commissioning stage29
  • 9.1 Scope of supervision29
  • 9.2 Quality control29
  • 9.3 Progress control31
  • 9.4 Cost control31
  • 9.5 Completion acceptance32
  • 10 Supervision of equipment overhaul33
  • 10.1 General requirements33
  • 10.2 Scope of supervision33
  • 10.3 Quality control33
  • 10.4 Progress control35
  • 10.5 Cost control35
  • 11 Post-evaluation of equipment36
  • Annex A Catalogue of major equipment subject to supervision37
  • Annex B Forms used by the contractor40
  • Annex B-1 Form for submission and review of a scheme41
  • Annex B-2 Form for submission and review of the progress plan42
  • Annex B-3 Form for submission and review of materials, fittings, components and equipment43
  • Annex B-4 Form for submission and review of equipment arriving on site44
  • Annex B-5 Application form for inspection and verification45
  • Annex B-6 Application form for test running46
  • Annex B-7 Completion inspection sheet for equipment engineering47
  • Annex B-8 Form for submission and review of commencement or resumption of work48
  • Annex B-9 Form for submission and review of subcontractor qualifications49
  • Annex B-10 Payment application form50
  • Annex B-11 Claim application form51
  • Annex B-12 Form for submission and review of an accident treatment scheme52
  • Annex B-13 Reply sheet to the supervising engineer notice53
  • Annex C Forms used by the supervision entity54
  • Annex C-1 Witnessing record form55
  • Annex C-2 Approval form for the progress plan56
  • Annex C-3 Payment certificate57
  • Annex C-4 Claim approval form58
  • Annex C-5 Order for suspension of the works59
  • Annex C-6 Supervising engineer notice60
  • Annex C-7 Supervision memorandum61
  • Annex C-8 Supervision log62
  • Annex C-9 Supervision status form63
  • Annex C-10 Testing record form64
  • Annex C-11 Equipment supervision conclusion form65
  • Annex C-12 Witnessing form for quality control points66
  • Annex D Forms common to all parties67
  • Annex D-1 Work contact sheet68
  • Annex D-2 Form for submission and review of a change69
  • Explanation of wording in this specification70
  • List of quoted standards71
  • Addition: Explanation of provisions72

Foreword

This document was issued on 18 March 2014 by the National Energy Administration of the PRC and takes effect on 1 August 2014.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 73.020, Chinese classification P 00/09.

This specification has been prepared in accordance with the requirements of the Notice of the National Energy Administration on Issuing the Second Batch of the 2011 Plan for the Formulation (Revision) of Industry Standards in the Energy Field (Guo Neng Ke Ji [2011] No. 252). The work was organized by the China Coal Construction Association and was carried out jointly by China Coal Equipment Engineering Consulting Company, Shanxi Chencheng Construction Engineering Co., Ltd. and other relevant units.

The drafting group took the Code for supervision of equipment engineering (GB/T 26429-2010) and the Code of practice for supervision of coal equipment engineering (trial), issued by the China Coal Construction Association in 2011, as its basis.

In preparing the text the drafting group carefully summarized practical experience in the supervision of coal equipment engineering, carried out extensive investigation and research, solicited opinions widely and gave full consideration to the particular features of coal equipment. The text was finalized after repeated discussion, revision and improvement, and after examination and approval.

This specification consists of 11 chapters and 4 annexes. Its main contents are: general provisions; terms; supervision organization and personnel; supervision plan and detailed rules for implementation; general requirements for supervision work; supervision at the equipment design stage; supervision services at the equipment procurement stage; supervision at the equipment manufacturing stage; supervision at the equipment installation and commissioning stage; supervision of equipment overhaul; and post-evaluation of equipment.

This specification is administered by the National Energy Administration; day-to-day management is the responsibility of the China Coal Construction Association; and China Coal Equipment Engineering Consulting Company is responsible for the interpretation of the specific technical content.

Comments and suggestions arising during the implementation of this specification should be sent by post to China Coal Equipment Engineering Consulting Company (address: Xinyi Building 11-22, No. 1 Anwai Street, Chaoyang District, Beijing; postcode 100011), so that they may be taken into account in future revisions.

Chief editing units: China Coal Equipment Engineering Consulting Company; Shanxi Chencheng Construction Engineering Co., Ltd.

Participating units: Zhongmei Shaanxi Zhongan Project Management Co., Ltd.; Anhui Huaxia Construction Supervision Co., Ltd.; Ningxia Lingzhou Engineering Supervision and Consulting Co., Ltd.; Shanxi Coal Construction Supervision and Consulting Company; Henan Xingping Engineering Project Management Co., Ltd.; Coal Industry Zhengzhou Design and Research Institute Co., Ltd.; Shendong Supervision Co., Ltd.; Shanxi Provincial Coal Construction Supervision Co., Ltd.; Henan Engineering Consulting and Supervision Co., Ltd.; Shaanxi Jianan Engineering Supervision Co., Ltd.

Chief drafters: Xu Guangwu, Wei Guofeng, Zhao Jun, Zhao Lidong, Zhao Hongzhi, Yao Liying, Wang Aiguo, Shang Guanghai, Sun Tongren, Sun Yuehua, Zhang Jiaxun, Liu Zixin, Bai Yongmin, Liu Jianping, Xing Jinlin, Yu Bolin, Zhang Xuanchang, Hong Yuan, Wang Liwen, Jiang Zhixin, Wang Xiaoqin, Yao Lianmeng, Cheng Huaizhe, Li Jianye, Han Guanjun, Xu Mingsheng. Chief reviewers: An Heren, Fan Qiang, Sun Shouren, Xu Yili, Wang Jianting, Meng Feng, Zhang Qiang, Peng Shuping, Chen Huaiming, Huang Jiapin, Fang Mingye, Yang Rui, Zhang Xuanchang, Zheng Benfang, Zhang Lianying, Fan Wenbo, Zhang Xuan.

Issue and publication data

Full designation: NB/T 51015-2014, an energy industry standard of the People's Republic of China.

Chinese title: coal equipment engineering supervision specification. The English title printed on the cover reads Coal Plant Engineering Consulting Service Specification; the Chinese title governs, and it refers to the supervision of coal equipment engineering rather than to consulting services for a coal plant.

International classification: ICS 73.020. Chinese standard classification code: P 00/09. Record (filing) number: J1804-2014.

Issued on 18 March 2014 by the National Energy Administration.

Put into effect on 1 August 2014.

Chief editing department: China Coal Construction Association. Approving department: National Energy Administration.

Published by China Coal Industry Publishing House, Beijing, 2014.

The numbered text runs from page 1 to page 72, the last three items being the explanation of wording, the list of quoted standards and the explanation of provisions.

Chapters 1 to 5: supervision system and general requirements

The first five chapters establish the general framework of the specification: the purpose and field of application, the terminology, the supervision organization and its personnel, the planning documents that govern supervision work, and the general requirements applying to that work at every stage.

Chapter 1 General provisions begins on page 1.

Chapter 2 Terms begins on page 2 and occupies the following pages up to the start of Chapter 3.

Chapter 3 Supervision organization and personnel begins on page 5 and is the longest of the introductory chapters, running to page 8.

Chapter 3 is divided into four subclauses: 3.1 Supervision entity (page 5); 3.2 Project supervision organization (page 5); 3.3 Supervision personnel (page 6); 3.4 Duties of supervision personnel (page 6).

Chapter 4 Supervision plan and detailed rules for implementation begins on page 9.

Chapter 4 is divided into two subclauses: 4.1 Supervision plan (page 9); 4.2 Detailed rules for supervision implementation (page 10).

Chapter 5 General requirements for supervision work begins on page 11 and runs to page 13.

Chapter 5 is divided into four subclauses: 5.1 Basis of supervision work (page 11); 5.2 Contract management (page 11); 5.3 Information management (page 11); 5.4 Organization and coordination (page 12).

Chapters 6 to 11: supervision stage by stage

The second part of the specification follows the life cycle of the equipment: design, procurement, manufacturing, installation and commissioning, overhaul, and post-evaluation. Each stage chapter is organized around the same control axes of quality, progress and cost or investment.

Chapter 6 Supervision at the equipment design stage begins on page 14.

Chapter 6 is divided into five subclauses: 6.1 General requirements (page 14); 6.2 Scope of supervision (page 14); 6.3 Quality control (page 14); 6.4 Progress control (page 16); 6.5 Investment control (page 16).

Chapter 7 Supervision services at the equipment procurement stage begins on page 17.

Chapter 7 is divided into two subclauses: 7.1 Scope of supervision services (page 17); 7.2 Contents of equipment procurement supervision services (page 17).

Chapter 8 Supervision at the equipment manufacturing stage begins on page 19 and is the most extensive chapter of the specification, running to page 28.

Chapter 8 is divided into seven subclauses: 8.1 General requirements (page 19); 8.2 Scope of supervision (page 19); 8.3 Working procedure (page 19); 8.4 Quality control (page 20, itself spanning six pages); 8.5 Progress control (page 26); 8.6 Cost control (page 27); 8.7 Supervision records (page 27).

Chapter 9 Supervision at the equipment installation and commissioning stage begins on page 29.

Chapter 9 is divided into five subclauses: 9.1 Scope of supervision (page 29); 9.2 Quality control (page 29); 9.3 Progress control (page 31); 9.4 Cost control (page 31); 9.5 Completion acceptance (page 32).

Chapter 10 Supervision of equipment overhaul begins on page 33.

Chapter 10 is divided into five subclauses: 10.1 General requirements (page 33); 10.2 Scope of supervision (page 33); 10.3 Quality control (page 33); 10.4 Progress control (page 35); 10.5 Cost control (page 35).

Chapter 11 Post-evaluation of equipment begins on page 36 and closes the normative text.

Back matter

Explanation of wording in this specification (page 70), which sets out how the degrees of obligation are expressed in the text.

List of quoted standards (page 71), giving the standards referred to in the normative text.

Addition: Explanation of provisions (page 72), a commentary published together with the specification and providing the background and intent of the individual clauses.

The specification therefore comprises 72 numbered pages of normative text, annexes and commentary, preceded by the foreword and the table of contents.

1 Scope

NB/T 51015-2014 sets out how engineering supervision is carried out on coal industry equipment works in China - the independent oversight of equipment procurement, manufacture, delivery, installation, commissioning and handover on coal mine and coal preparation projects. It defines the supervision organisation and the qualifications and duties of the chief supervising engineer and their staff, the supervision plan and the detailed supervision rules that flow from it, and the working procedures the supervisor follows on site. The core of the document is the control the supervisor exercises: review of the manufacturer and of the design and technical documents, witnessing and hold points during manufacture, factory acceptance, inspection on arrival, control of the installation sequence and of the quality of each stage, control of progress and cost, safety and environmental supervision, handling of design changes and of non-conformities, witnessing of no-load and load commissioning, and the acceptance and handover of the equipment. It also fixes the paperwork - supervision logs, inspection records, instructions and notices, monthly reports, and the supervision summary that closes the assignment - and the way that record is filed and handed over. Note that the English title printed on the cover of this edition reads Coal Plant Engineering Consulting Service Specification, which does not match the Chinese: the Chinese says equipment engineering supervision, and that is what the document contains.

Remaining clauses in the full document

  • 2 Terms
  • 3 Supervision organization and personnel
  • 4 Supervision plan and detailed rules for implementation
  • 5 General requirements for supervision work
  • 6 Supervision at the equipment design stage
  • 7 Supervision services at the equipment procurement stage
  • 8 Supervision at the equipment manufacturing stage
  • 9 Supervision at the equipment installation and commissioning stage
  • 10 Supervision of equipment overhaul
  • 11 Post-evaluation of equipment
  • Annexes A to D

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 104 pages — is available in the English PDF.

Similar standards

How to Buy NB/T 51015-2014

  1. 1Add to cart. Click the "Buy NB/T 51015-2014" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
104 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 51015-2014

$1,865.00

$1,585.00for partners