Valid

NB/T 11459-2023Specification for DC electrical exploration in underground coal mine (English PDF)

煤矿井下直流电法勘探规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (16 pages)

Need quotation for your management?

Get a formal quotation for NB/T 11459-2023 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

December 28, 2023

Implementation date

June 28, 2024

Scope

NB/T 11459-2023 is the English-translated version of 煤矿井下直流电法勘探规程.

NB/T 11459-2023 — This document specifies the application of DC electrical exploration technology in underground coal mines in exploration design, exploration construction, data processing, data interpretation, report preparation, Implementation procedures for report review.

This document is applicable to DC depth sounding, DC profiling, DC advance detection, working face electric perspective, high-density Direct current electrical exploration operations in mines, such as direct current electrical exploration.

Found what you need?

Document preview — NB/T 11459-2023

National Standard of the People's Republic of China

ICS
75.180.10
Classification
D 82

Issued by: National Energy Administration

Contents

  • Document data1

Document data

Chinese classification (CCS): D82.

Estimated length of the Chinese original: 24,214 words.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 16 pages — is available in the English PDF.

Referenced standards

How to Download NB/T 11459-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
16 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 11459-2023

$405.00